Hong Kong EMSD's 9-page energy audit code: at least 12 months of bill data, a five-step audit, EUI calculation, the CBSI definition for a data-centre portion and a 400 A three-phase exemption limit.

On this page

Overview

The code from Hong Kong's Electrical and Mechanical Services Department (EMSD) is issued under Part 9 of the Buildings Energy Efficiency Ordinance (Cap 610) and sets the technical requirements for energy audits of central building services installations (CBSI). An audit carried out in accordance with the code is deemed to meet the Ordinance's technical requirements. The code is a short 9-page document, with the Technical Guidelines (TG-EAC) providing the detailed explanation.

The scope is the building types listed in Schedule 4 of the Ordinance. The provision important for data centres is that in a portion of an industrial building occupied principally as a data centre, CBSI means installations solely serving that portion, excluding installations owned by someone other than the portion's owner. Building owners may apply to the Director for exemption if the total rating of circuit protective devices solely governing the relevant CBSI does not exceed 400 A, 3-phase and an audit is technically or operationally undesirable.

The audit runs in five steps: collecting information, analysing energy consumption, identifying energy management opportunities (EMO), cost-benefit analysis of EMOs and compiling the audit report. Information collected includes at least 12 consecutive months of energy bills and consumption data, total power factor, total harmonic distortion, metering and BMS data and EMOs implemented in the past 5 years. Analysis yields total annual consumption, a breakdown by major systems and the EUI (kWh/m²/year). Where records are incomplete, calculations from partial data, representative measurements and reasoned assumptions are acceptable and the method is documented in the report.

EMOs fall into three categories: no-cost housekeeping measures, low-cost operational changes and higher-capital measures. The report follows an EMSD template and describes air-conditioning equipment, pumps, fans and other equipment of 5 kW or above, plus power quality. The Energy Audit Form shows the EUI for public inspection, and technical information in the Data Disclosure Form may be released by EMSD.

Key points

  1. The code is issued under Part 9 of Cap 610; an audit in line with it satisfies the technical requirements.
  2. In a data-centre portion of an industrial building, CBSI means installations solely serving the portion; those owned by someone other than the portion's owner are excluded.
  3. Exemption limit: total rating of circuit protective devices solely governing the CBSI does not exceed 400 A, 3-phase.
  4. The audit has five steps: information collection, consumption analysis, EMO identification, cost-benefit analysis, report.
  5. Information to collect: at least 12 consecutive months of bills and consumption data, power factor, total harmonic distortion, metering and BMS data, EMOs implemented in the past 5 years.
  6. Analysis covers annual consumption, breakdown by major systems and EUI (kWh/m²/year); separately metered EV charging can be deducted.
  7. If records are missing, calculations from partial data, representative measurements and reasonable assumptions are accepted; the method is documented in the report.
  8. EMO categories: I no cost, II low-cost operational change, III higher capital; cost-benefit analysis is required for II and III.
  9. The Energy Audit Form shows EUI for public inspection; Data Disclosure Form information may be published by EMSD.

Using it in design

  • When designing a data-centre portion in a Hong Kong industrial building, separate installations serving the portion from tenant-owned systems to fix the audit boundary.
  • Plan sub-metering and BMS data logging to support a 12-month breakdown and EUI calculation; include power factor and harmonics measurement.
  • Keep descriptions and control systems of cooling, pump and fan equipment of 5 kW and above in the equipment register; the audit report requires this.
  • For small facilities, determine early whether the circuit protection total exceeds the 400 A, 3-phase limit for the exemption decision.
  • Link the EMO list from the audit to the operating plan; implementation is not mandatory but the list is recorded in the report.

Who should read it

Teams designing and operating data centres in Hong Kong, Registered Energy Assessors and building energy compliance advisers.

Document contents

  1. 1. Introduction
  2. 2. Interpretations
  3. 3. Application
  4. 4. Technical compliance with the Ordinance
  5. 5. Objectives of energy audit
  6. 6. Overview of energy audit
  7. 7. Energy audit requirements
  8. 8. Energy audit form
  9. 9. Data disclosure form

Publication details

Authors
Electrical and Mechanical Services Department, Hong Kong
Publisher
Electrical and Mechanical Services Department, Hong Kong
Year
2025
Document number
EAC 2024 / Addendum No.1/2025
Document language
English
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Official publisher document inspected. No document-specific commercial redistribution permission established; retain metadata and original short summaries only.

Citation

Electrical and Mechanical Services Department, Hong Kong (2025). Code of Practice for Building Energy Audit: EAC 2024 incorporated with Addendum No.1/2025. Electrical and Mechanical Services Department, Hong Kong. EAC 2024 / Addendum No.1/2025. https://www.emsd.gov.hk/beeo/en/pee/EAC2024_Add2025.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.