Commissioning (Cx) Guide for New Buildings
Natural Resources Canada, CanmetENERGY
A March 2010 Natural Resources Canada (CanmetENERGY) guide that walks owners through commissioning new buildings from concept design to the first year of operation, with costs of 6.56-22.17 $/m2.
On this page
Overview
The guide is the Canadian adaptation of the California Commissioning Guide: New Buildings, produced by PECI for the California Commissioning Collaborative. It defines commissioning as an intensive quality-assurance process running from concept through design, construction and start-up into the first year of operation, so that energy, water and indoor-environment performance meet the owner's requirements. It is written mainly for building owners, managers and operators.
It first sets out the goals of commissioning and why it matters, then gives benefit and cost data. Per the US studies it cites, the value of energy savings is 0.22-2.58 $/m2 and the value of non-energy savings is 3.12-92.86 $/m2. One study of six new-construction projects found commissioning cut change orders by 87% and contractor call-backs by 90%, lowering total construction cost by an estimated 4% to 9%.
The team chapter lists the responsibilities of owner, designers, contractors, operating staff and the commissioning authority (CxA), and explains how to select a CxA. The process chapter covers four phases: concept design, design, construction, and occupancy and operations. The owner's project requirements (OPR), basis of design, test plans, systems manual, staff training and final Cx report are the deliverables produced along the way.
The last chapter addresses persistence of benefits: planning operations during design, O&M manuals and sequences of operation, staff training, preventive maintenance, performance tracking and deciding when to recommission. The guide targets buildings in general, not data centres, and as a 2010 document it does not address current data-centre densities or redundancy architectures, but the process logic transfers directly to critical facilities.
Key points
- Commissioning is a quality-assurance process that runs from concept stage through the first year of operation.
- In six new-construction projects, change orders fell 87% and contractor call-backs 90%; total construction cost dropped an estimated 4-9%.
- In a US study of 69 projects, total Cx cost ranged 6.56-22.17 $/m2.
- The Cx authority fee is 74-86% of total Cx cost and 0.3-1.1% of total construction cost.
- Energy savings are valued at 0.22-2.58 $/m2 and non-energy savings at 3.12-92.86 $/m2.
- Once benefit value is counted, more than 50% of commissioning cost is often offset.
- Starting Cx in design means errors are caught on paper, where they cost far less than on site.
- The systems manual, staff training and final Cx report are core CxA deliverables.
Using it in design
- Write the owner's project requirements (OPR) at the start of design and tie performance, maintainability and redundancy targets to that document.
- Appoint the CxA during design and include them in design reviews; a late appointment weakens the effect on design errors.
- In the commissioning plan, define the test sequence for each critical system (UPS, generators, cooling, BMS) and for integrated systems testing.
- Make the systems manual, operating sequences and staff training plan mandatory handover items.
- Budget Cx at a few percent of construction cost and weigh it against avoided change-order cost.
- Assign owners and dates for deferred and seasonal tests during the first year of operation.
Who should read it
Facility owners, project managers, commissioning authorities and design teams building a commissioning process for data-centre construction.
Document contents
- Introduction
- Benefits and Costs of Commissioning New Buildings
- The Commissioning Team
- The Commissioning Process: Concept Design, Design, Construction, Occupancy and Operations
- Strategies for Ensuring Persistence of Benefits
- Glossary
Publication details
- Authors
- Natural Resources Canada, CanmetENERGY
- Publisher
- Natural Resources Canada, CanmetENERGY
- Year
- 2010
- Document number
- M154-19/2009E-PDF; ISBN 978-1-100-12405-6
- Document language
- English
- Source type
- Industry body
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
PDF p.IV permits educational or non-profit reproduction and warns of third-party rights. Commercial full-text redistribution is therefore not established; metadata and brief original summaries only.
Citation
Natural Resources Canada, CanmetENERGY (2010). Commissioning (Cx) Guide for New Buildings. Natural Resources Canada, CanmetENERGY. M154-19/2009E-PDF; ISBN 978-1-100-12405-6. https://natural-resources.canada.ca/sites/www.nrcan.gc.ca/files/canmetenergy/files/cx-guide-eng.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.