Redundant Data Center Planning for Universities
Erzincan Üniversitesi Fen Bilimleri Enstitüsü Dergisi · Veli Çapalı, Kadir Sümer et al.
Çapalı, Sümer and Ersoy's 2024 paper describes how Süleyman Demirel University built a 2N+1 data centre across two campuses and a remote disaster recovery centre from a 30 kW N load, using TIER and ISO 22301.
On this page
Overview
Published in the Erzincan University Journal of Science and Technology, the paper starts from the growth in university IT needs during Covid-19 through remote teaching and home working. Its aim is to show, through the Süleyman Demirel University implementation, how a three-location redundant data centre should be planned to TIER and ISO 22301. The introduction reports that a single 90-minute outage costs on average more than half a million euros including recovery, lost user productivity and business interruption.
The planning section explains N, N+1, N+2, 2N and 2(N+1) redundancy and Tier I-IV levels. Energy and heat loads of servers and network devices are calculated to give a maximum of 30 kW, which is the N requirement. For Tier III, N+1 is required: at least two UPSs and two air conditioners each able to meet 30 kW, with A+B dual-source feeds chosen. Storage, DCIM, security and FM200 gas suppression are also part of the plan.
For implementation, universities with a research hospital are advised to use 2N or 2N+1 instead of N+1. Two separate data centres on the east and west campuses were built with N+1 redundancy and joined by 96-core single-mode fibre. The third location is the disaster recovery centre (DRC) in a Tier 3 certified data centre in another city. At the west campus the electrical room is isolated from the data centre, with a cold aisle layout and a card-access NOC separation.
The results section reports scenario tests rather than measured downtime: transfer between data centres, active-passive redundancy, failure and maintenance cases and operation of backup systems were exercised and the redundant infrastructure was found adequate. The study is an account of one institution's implementation; it contains no generalisable numerical validation or cost analysis.
Key points
- A single 90-minute outage costs on average more than half a million euros including recovery, productivity loss and business interruption (citing Emerson Network, 2021).
- The maximum load calculated from server and network loads is 30 kW and is taken as the N requirement.
- For Tier III N+1: at least two UPSs able to meet 30 kW and two redundant air conditioners; supply planned as A+B dual source.
- Tier availabilities: Tier 1 about 99.671%, Tier 2 99.741%, Tier 3 99.982%, Tier 4 99.995%.
- Universities with a research hospital are advised to use 2N or 2N+1 instead of N+1.
- East and west campus data centres are built with N+1 redundancy and joined by 96-core single-mode fibre.
- The disaster recovery centre is in a Tier 3 certified data centre in another city, and is stated to be mandatory for large public-sector data centres.
- Active-passive mirroring runs with a 25 s lag plus a daily cold data backup; backup systems are brought up within minutes.
- ISO 22301 calls for asset and process inventories, risk analysis, disaster recovery plan, crisis management and exercise plans.
Using it in design
- Size the data centre by summing server and network loads to get N (30 kW in this study), then add N+1 or 2N for the target Tier.
- For critical institutions plan two separate buildings or campus locations together with a remote disaster recovery centre, and fix inter-site fibre capacity (96 cores in the example) early.
- Isolate the electrical room from the data hall for fire and risk reasons, and protect the cold aisle with card-access doors.
- Define active-passive mirroring lag and daily cold backup together with recovery objectives, and test the DRC scenario with regular exercises.
- Plan A+B dual-source feeds with separate UPS paths, and verify that either path can carry the whole load when the other fails.
Who should read it
IT managers, design engineers and business continuity officers planning university and public-sector data centres.
Document contents
- Introduction
- Data Center
- Business Continuity and Redundancy Standards
- Redundant Data Center Planning
- Planning Phase
- Implementation
- West Campus Data Center
- East Campus Data Center
- Disaster Recovery Center
- Results and Discussion
Publication details
- Authors
- Veli Çapalı; Kadir Sümer; Mevlüt Ersoy
- Publisher
- Erzincan Üniversitesi Fen Bilimleri Enstitüsü Dergisi
- Year
- 2024
- Document language
- English
- Source type
- Scientific
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Public publisher source inspected. Free reading is not commercial redistribution permission; metadata and original short summaries only.
Citation
Veli Çapalı; Kadir Sümer; Mevlüt Ersoy (2024). Redundant Data Center Planning for Universities. Erzincan Üniversitesi Fen Bilimleri Enstitüsü Dergisi. https://doi.org/10.18185/erzifbed.1197673
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.