Thermal Performance Evaluation of a Data Center Cooling System under Fault Conditions
Energies (MDPI AG) · Jinkyun Cho, Beungyong Park et al.
A case study of a 20 MW, nine-storey chilled-water CRAH data centre in Korea with cold-aisle containment and district cooling: after the central plant stops and UPS-backed pumps keep circulating, how long can the thermal capacity of the water in the pipes keep server inlets within ASHRAE limits?
CC BY 4.0: share with attribution
On this page
Overview
The study asks how long server inlet temperature stays acceptable during a cooling system fault and how quickly backup cooling must be running. The 6SigmaDC room model has 192 racks at 4.0 kW with CAC, underfloor supply with side-wall return, a 900 mm raised floor, a 3.0 m false ceiling, 150 kW CRAHs and chilled water varied from 10 to 18 °C. The model finds the highest chilled-water and CRAH supply temperatures that still give compliant inlets, and a pipe-volume energy balance then converts those temperatures into elapsed time after the outage.
Server inlets stayed within 18-27 °C up to a CRAH supply-air temperature of about 24 °C, corresponding to 17 °C chilled water. Above 17 °C chilled water, CRAH capacity falls below 80% and room temperature rises rapidly; from 18 °C chilled water and 25 °C supply air, coil capacity fell below the load and inlet temperatures rose rapidly. The chilled-water piping held 234.3 m³ in total, about 45 m³ per typical floor, serving a 2500 kW floor cooling load at 6.75 m³/min with a fixed 5.5 °C water delta-T.
After the outage, chilled water took about 150 s to rise from 10 to 14 °C, and the whole 45 m³ reached 15.5 °C at 3.45 min, 21.0 °C at 10.36 min and 26.5 °C at 17.27 min. Compliant operation could continue for about 320 s (5 min 20 s) after the cooling outage, with CRAH coil capacity at 85%, so backup cooling must be active within 300 s. High-temperature, contained designs have only about five minutes before backup cooling must be running.
Limits: a single project (20 MW, Korea) and six fault conditions; the result depends on this plant's pipe volume, CRAH capacity and 4 kW per rack load. The authors also address organising and managing operational stability and energy-efficiency verification systematically through the commissioning process.
Key points
- CFD module: 192 racks at 4.0 kW/rack with CAC, underfloor supply with side-wall return, 900 mm raised floor, 3.0 m false ceiling, 150 kW CRAHs and chilled water from 10 to 18 °C.
- Server inlets stayed within 18-27 °C up to a CRAH supply-air temperature of about 24 °C, corresponding to 17 °C chilled water; above that CRAH capacity falls below 80% and room temperature rises rapidly.
- The chilled-water piping held 234.3 m³ in total, about 45 m³ per typical floor, serving a 2500 kW floor cooling load at 6.75 m³/min with a fixed 5.5 °C delta-T.
- After the outage, water took about 150 s to rise from 10 to 14 °C; the 45 m³ reached 15.5 °C at 3.45 min, 21.0 °C at 10.36 min and 26.5 °C at 17.27 min.
- Compliant operation could continue for about 320 s (5 min 20 s) after the outage with CRAH coil capacity at 85%, so backup cooling must be active within 300 s.
- From 18 °C chilled water and 25 °C supply air, coil capacity fell below the load and inlet temperatures rose rapidly.
Using it in design
- Calculate the permissible time for a cooling outage with a pipe-volume energy balance and set the backup-cooling start time accordingly (here 300 s); high-temperature, contained designs give less time.
- Limit chilled-water and CRAH supply temperature to the ASHRAE-compliant upper bound (17 °C water, 24 °C air) as the pre-fault operating point; above 17 °C capacity falls below 80%.
- Model UPS-backed pumps and pipe volume (45 m³ per typical floor) as thermal buffer and add them to fault-condition commissioning test scenarios.
Who should read it
Designers and commissioning engineers determining cooling fault resilience and backup-cooling start time.
Document contents
- 1. Introduction
- 2. Literature Reviews
- 3. Major Issues in Data Center Planning (3.1 Root Causes and Scale of Fault Conditions, 3.2 Temperature and IT Reliability)
- 4. Case Study: Data Center and Modeling (4.1 Data Center Cooling System, 4.2 IT Server Room Thermal Model, 4.3 Simulation)
- 5. Temperature Control Approaches (5.1 Temperature Increase over Time After a Cooling System Outage)
- 6. Conclusions
Related standards
- ASHRAE TC 9.9 Thermal Guidelines for Data Processing Environments
- Uptime Institute Tier Standard
Read the document
dc-cooling-outage-fault-conditions-2019.pdf
CC BY 4.0: share with attribution
The document is provided unaltered because its licence permits redistribution.
Publication details
- Authors
- Jinkyun Cho; Beungyong Park; Yongdae Jeong
- Publisher
- Energies (MDPI AG)
- Year
- 2019
- Volume
- 12
- Issue
- 15
- Pages
- 2996
- Document language
- English
- Source type
- Scientific
- Access
- Open licence (downloadable)
- Licence
- CC BY 4.0: share with attribution
- Licence evidence
- www.mdpi.com
Original licence note
PDF p.1: open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.
Citation
Jinkyun Cho; Beungyong Park; Yongdae Jeong (2019). Thermal Performance Evaluation of a Data Center Cooling System under Fault Conditions. Energies (MDPI AG). 12(15), 2996. https://doi.org/10.3390/en12152996
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.