Grid-Interactive Data Centers: Enabling Decarbonization and System Stability
Eaton · Janne Paananen, Ehsan Nasr
A joint Eaton-Microsoft paper explaining why low-inertia grids with a high renewable share need fast reserves and how data-centre UPS batteries can supply them.
On this page
Overview
The paper explains that low-inertia grids need fast reserves to hold frequency and defines the services involved: frequency containment reserves (FCR-D, FCR-N), fast frequency response (FFR) and PJM RegD. Required reaction time ranges from below one second for FFR to a few seconds for FCR-D, and the response can be static or droop-based dynamic. PJM's AGC sends a RegD regulation signal every two seconds, and payment depends on tracking accuracy.
A modern bidirectional UPS is shown sharing load between grid and battery or exporting power. Field cases cover the Nordics, Ireland and a Microsoft US site; in the Irish case the UPS delivered a static 25 kW response triggered when frequency fell below 49.70 Hz. Battery state of charge is split into a reserve for critical load and a band for grid services, and on alarms or lost external signals the UPS fails safe to load-protection mode.
On economics, about 50% of the cost of a BESS above 1 MW is batteries and converters; the rest is grid connection, property and building, which a data-centre UPS already has. European ancillary-service revenues range from tens of thousands up to over EUR 100,000 per MW per year.
Battery degradation depends on the market's activation pattern: lead-acid batteries may be unsuitable for many ancillary markets, and the degradation impact is small in Irish and Nordic FFR but significant in PJM or continental continuous regulation.
Key points
- Required reaction time ranges from below one second (FFR) to a few seconds (FCR-D); response can be static or droop-based dynamic.
- PJM's AGC sends a RegD signal every two seconds, and payment depends on tracking accuracy.
- Irish field case: the UPS delivered a static 25 kW response when frequency fell below 49.70 Hz.
- About 50% of the cost of a BESS above 1 MW is batteries and converters; the remainder is grid connection, property and building, which a data-centre UPS already has.
- European ancillary-service revenues range from tens of thousands up to over EUR 100,000 per MW per year.
- Battery SoC is split into a critical-load reserve and a grid-service band; on alarms or lost signals the UPS fails safe to load-protection mode.
- Lead-acid may be unsuitable for many ancillary markets; degradation is small in Irish/Nordic FFR but significant in PJM or continental continuous regulation.
Using it in design
- When sizing UPS batteries, model a grid-services band on top of the required autonomy.
- Restrict continuous-regulation services to Li-ion or similar high-cycle chemistries.
- Catalogue the UPS bidirectional rectifier and export capability, built-in frequency measurement and supported service types (FFR, FCR-D, FCR-N, RegD).
- Show the reserved backup energy separately in runtime reports.
Who should read it
Hyperscale and colocation designers considering grid-service revenue from UPS battery energy, and the decision makers behind it.
Related standards
- IEC 62040-3
- ENTSO-E Network Codes
Publication details
- Authors
- Janne Paananen; Ehsan Nasr
- Publisher
- Eaton
- Year
- 2021
- Document number
- WP153031EN
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Citation
Janne Paananen; Ehsan Nasr (2021). Grid-Interactive Data Centers: Enabling Decarbonization and System Stability. Eaton. WP153031EN. https://web.archive.org/web/20240916044700/https://www.eaton.com/content/dam/eaton/markets/data-center/eaton-microsoft-grid-interactive-whitepaper-wp153031en.pdf