Enerji Piyasası Düzenleme Kurumu

EPDK report on Turkey's 2025 electricity data: total installed capacity 123,167.98 MW, generation 354,584.16 GWh, renewable share of capacity 62.33%, weighted average market clearing price 2,651.81 TL/MWh.

On this page

Overview

Prepared by the Strategy Development Department of the Energy Market Regulatory Authority (EPDK), the report compiles Turkey's electricity market statistics for data year 2025. The data come largely from notifications submitted through the Energy Market Notification System, and the report is published under the Official Statistics Programme. The authority notes that licence holders can correct earlier notifications, so figures may differ between reports.

The capacity and generation table covers licensed and unlicensed plants together. Total installed capacity is 123,167.98 MW; the renewable share rose from 59.48% in 2024 to 62.33% (76,766.35 MW). In generation, renewables hold 43.31%. Licensed capacity grew 1.83% to 99,135.32 MW and peak demand rose 2.90% to 60,414.40 MW. Unlicensed capacity grew 26.99% to 24,032.66 MW, of which 96.79% is solar.

On consumption, billed consumption rose 3.35% to 288,479.96 GWh and actual consumption rose 3.38% to 352,509.64 GWh. Of billed consumption, 163,320.34 GWh belongs to eligible (free) consumers. In the wholesale market the weighted average day-ahead price (PTF) rose 16.63% to 2,651.81 TL/MWh and the average system marginal price (SMF) was 2,525.58 TL/MWh. The transmission system has 1,450 substations, 2,981 transformers totalling 293,554 MVA and 76,701.11 km of lines.

The report treats licence transactions, the wholesale market, the renewable support mechanism (YEKDEM), competition, transmission, distribution, tariffs and interruption indicators in separate sections. It is a national statistical compilation and does not by itself support conclusions on connection capacity, reliability or price at a specific site.

Key points

  1. Total installed capacity is 123,167.98 MW and total generation 354,584.16 GWh (licensed and unlicensed combined).
  2. Renewables hold 62.33% of installed capacity (2024: 59.48%) and 43.31% of generation.
  3. By capacity, hydro is 26.22%, solar 20.95%, natural gas 19.62% and wind 12.00%.
  4. Licensed capacity is 99,135.32 MW (+1.83%); peak demand is 60,414.40 MW (+2.90%).
  5. Unlicensed capacity is 24,032.66 MW (+26.99%), 96.79% of it solar.
  6. Billed consumption is 288,479.96 GWh (+3.35%); actual consumption is 352,509.64 GWh (+3.38%).
  7. Weighted average PTF is 2,651.81 TL/MWh (+16.63%); average SMF is 2,525.58 TL/MWh (+15.91%); the highest PTF is 3,400 TL/MWh.
  8. YEKDEM covers 754 plants with 17,588.8 MW of operating capacity; the average YEKDEM price is 3,684.39 TL/MWh.
  9. The number of consumers using eligible-consumer rights rose to 860,207; the 2025 eligibility limit is 750 kWh.
  10. Electricity imports are 1.99 TWh (-26.60%) and exports 4.07 TWh (+9.28%).

Using it in design

  • For data-centre projects in Turkey, match grid carbon intensity and renewable-share assumptions to this report's capacity and generation shares by source.
  • In energy cost scenarios, use the weighted average PTF (2,651.81 TL/MWh) and the 3,400 TL/MWh hourly ceiling as the reference price range.
  • Treat the eligibility limit and market openness data as input to the procurement decision (eligible consumer status, bilateral agreement, YEKDEM).
  • For connection capacity and continuity, rely on the site-specific connection opinion from the distribution company and TEIAS, not on these national figures.
  • Read the interruption frequency and duration indicators by region as input to backup levels (generator, UPS runtime).

Who should read it

Investors, energy consultants and electrical designers planning data-centre power supply, cost and connection strategy in Turkey.

Document contents

  1. President's message and executive summary
  2. Licensed generation and capacity, unlicensed generation, billed and actual consumption, imports and exports
  3. Wholesale market (day-ahead, balancing power, intraday, bilateral, YEKDEM, futures, YEK-G)
  4. Competition
  5. Transmission
  6. Distribution and interruption indicators

Publication details

Authors
Enerji Piyasası Düzenleme Kurumu
Publisher
Enerji Piyasası Düzenleme Kurumu
Year
2026
Document number
2025 veri yılı; Ankara 2026
Document language
Turkish
Source type
Turkish regulation
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Açık erişim yeniden dağıtım izni anlamına gelmez; açık yeniden dağıtım lisansı saptanmadı. Kütüphanede tam metin yayımlanmaz. PDF ilk sayfa tüm hakları saklı tutar ve kaynak gösterilmesini ister. Bildirim düzeltmeleri nedeniyle raporlar arasında fark oluşabileceğini açıklar.

Citation

Enerji Piyasası Düzenleme Kurumu (2026). 2025 Yılı Elektrik Piyasası Gelişim Raporu. Enerji Piyasası Düzenleme Kurumu. 2025 veri yılı; Ankara 2026. https://www.epdk.gov.tr/Detay/DownloadDocument?id=aetLyVmDSsI=

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.