Green Data Centres Practice Guide, Version 1.0

BEAM Society Limited

The March 2020 BEAM Society guide from Hong Kong lists best practices across 11 sections covering the whole data-centre life cycle, each with qualitative effort and effectiveness ratings on a 1 to 5 scale.

On this page

Overview

The guide is a best-practice compilation prepared by the BEAM Society in Hong Kong to help data-centre stakeholders identify measures that improve energy efficiency and environmental performance. Experts from operators, vendors, consultants, academia and public bodies reviewed it. It applies to new and existing data centres and covers design and construction, procurement, management, operation and maintenance, and disposal.

The content is grouped under 11 headings: general aspects, cooling system, power system, monitoring and managing energy efficiency, IT equipment deployment, IT applications and services, telecommunications and network cabling, green construction, management and maintenance, and green disposal. Each practice carries financial, technical and effectiveness ratings from 1 to 5. The guide states that these ratings are relative and qualitative, should not be aggregated into an overall score, and that figures in other documents may differ because of climate.

The cooling section stresses part-load operation: data centres mostly run at partial rather than maximum load, so it recommends switching off unneeded cooling equipment, variable speed drives, mixing chillers of different capacity and dynamic control. Raising intake temperature and humidity range, widening the chilled-water temperature difference and free cooling options are separate topics. The power section covers modular and high-efficiency UPS, lithium batteries and power design that stays efficient at partial load.

Water is handled under general aspects: rainwater and grey-water recovery, metering of potable water, leak detection and treating cooling-tower make-up water so it can be cycled more times. The guide does not claim to be exhaustive or definitive; each site must adapt it, and some items may not apply to users who cannot control IT equipment, such as a colocation provider.

Key points

  1. Practices are grouped into eleven headings; each is rated qualitatively for financial effort, technical effort and effectiveness on a 1 to 5 scale (5 highest).
  2. Ratings are relative and indicative; they should not be summed into an overall score or read as guaranteed savings.
  3. Because data centres mostly run at partial load, the cooling system should be tuned to run efficiently across variable part load, not only at maximum load.
  4. Data centres were historically run at 20 to 26 degrees C and 50 to 60% humidity; the guide recommends moving to the ASHRAE A2 range or above, meaning intake above 26 degrees C, when procuring new IT equipment.
  5. Widening the chilled-water temperature difference cuts flow and pump energy; chillers and CRAC/CRAH coils must first be confirmed to deliver capacity and reliability at the higher water temperature.
  6. High-efficiency UPS in the 92% to 95% range is cited; modular UPS avoids initial oversizing and makes operation near full rated capacity more likely.
  7. Lithium batteries reduce UPS size, weight and cooling need; initial cost is higher, but longer life and lower maintenance can lower total cost of ownership.
  8. On water, the guide recommends rainwater and grey-water recovery, metering all sources, leak detection and treatment of cooling-tower make-up water.
  9. Equipment selection should favour metered electrical and cooling plant whose data can be exported in an open format to DCIM or building energy management.

Using it in design

  • Evaluate cooling and power equipment on part-load efficiency; check low-load scenarios using mixed chiller sizes, VSDs and modular UPS.
  • Plan the move of design intake temperature from A1 to the A2 range together with IT equipment procurement, and confirm chiller and coil limits before widening the chilled-water temperature difference.
  • Use the 1 to 5 effort and effectiveness ratings to pre-screen practices, but run your own savings calculation for the local climate.
  • Add sub-metering points for electricity, cooling and water, and open-format data export, to the technical specification.
  • Treat cooling-tower make-up water, rainwater storage and leak detection as separate line items in the water strategy.

Who should read it

Data-centre owners, operators and design consultants, especially teams selecting efficiency practices in hot and humid climates.

Document contents

  1. Introduction
  2. General aspects (including water use and sources)
  3. Cooling system
  4. Power system
  5. Monitoring and managing energy efficiency
  6. IT equipment deployment
  7. IT application system and IT service deployment
  8. Telecommunications and network cabling
  9. Green construction
  10. Management and maintenance
  11. Green disposal

Publication details

Authors
BEAM Society Limited
Publisher
BEAM Society Limited
Year
2020
Document number
Version 1.0, March 2020
Document language
English
Source type
Industry body
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Copyright 2020 BEAM Society Limited, all rights reserved. Own sections 1.2, 2.2.4 and 2.3.2 only; ASHRAE references and reproduced limits excluded.

Citation

BEAM Society Limited (2020). Green Data Centres Practice Guide, Version 1.0. BEAM Society Limited. Version 1.0, March 2020. https://www.hkgbc.org.hk/eng/beam-plus/beam-plus-references/manuals-assessment/ManualsFiles/GreenDCsPracticeGuideV10-2020-EN.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.