The Impact of Water Treatment on Energy Efficiency (Su Şartlandırmanın Enerji Verimliliğine Etkisi)
Original title Su Şartlandırmanın Enerji Verimliliğine Etkisi
Türk Tesisat Mühendisleri Derneği · Sema Çelebi
Sema Çelebi's article in TTMD Journal 75 (September-October 2011) on closed-loop and cooling tower water treatment; per Table 3, a 0.9 mm scale layer raises chiller energy consumption by about 30%.
On this page
Overview
The article explains that controlling the corrosion, scale and microbiological behaviour of water in heating, cooling, steam and service water systems extends system life and prevents rising energy cost. It focuses on closed-loop and cooling tower programmes. The water treatment company should be involved at design stage to raise programme quality. The author stresses that chemicals must be compatible with the system and supported by regular physical and chemical analysis, meter and operating-hour records, under the principle that nothing unmeasured can be improved.
In the closed-loop section, systems are grouped by temperature: high temperature (above 177 °C), medium (121-171 °C), low (below 121 °C) and chilled water at 4-13 °C. Closed loops lose no water by evaporation, so there is no concentration build-up or blowdown need; the main issues are corrosion, microbiological growth and sludge. Initial chemical flushing handles installation dirt and pipe oil: the flushing chemical is circulated for 48 hours, the system drained from the lowest points, strainers cleaned, fresh water circulated for 24 hours and drained again; fill and drain are repeated until iron is at minimum and pH is within 0.5 units of make-up. Protection must start immediately after flushing.
For chemical protection, make-up water quality depends on the system: soft water for high and medium temperature, total hardness below 100 ppm CaCO3 for low temperature and below 250 ppm CaCO3 for chilled water. Molybdate-azole programmes need 100-125 ppm Mo, nitrite-molybdate-azole 300-400 ppm NO2 and 50-75 ppm Mo, and polysilicate-azole 80-100 ppm SiO2; none is used above 121 °C. A bag filter passes 5-10% of system volume and removes iron oxide and weld spatter without water loss.
In the cooling tower section, cycles of concentration (COC) are calculated as tower water chloride over make-up chloride; conductivity-controlled blowdown automation is presented as the most effective method, with pH and ORP measurement supporting biocide dosing. Drift is 11% of recirculating water without drift eliminators and down to 0.1% with good ones. The tower basin at 29-35 °C favours Legionella. In a hotel example (2 x 3,600 kW centrifugal and 2 x 600 kW reciprocating chillers) 0.9 mm of scale causes a 30% energy increase, with an annual cost difference of 16,056 units at average load. The conclusion stresses consultancy-based programmes and energy and maintenance savings.
Key points
- The water treatment company should be involved at design stage for programme effectiveness.
- Closed-loop groups: high temperature above 177 °C, medium 121-171 °C, low below 121 °C, chilled water 4-13 °C.
- Initial chemical flushing: 48 hours circulation, drain, 24 hours fresh water, repeated fill and drain until pH is within 0.5 units of make-up.
- Make-up hardness should be below 100 ppm CaCO3 for low temperature and below 250 ppm CaCO3 for chilled water systems.
- Molybdate-azole 100-125 ppm Mo; nitrite-molybdate-azole 300-400 ppm NO2 and 50-75 ppm Mo; polysilicate-azole 80-100 ppm SiO2; none above 121 °C.
- A bag filter passes 5-10% of system volume and removes particles without water loss.
- Per Table 3, a 0.9 mm scale layer raises chiller energy consumption by about 30%.
- COC is tower water chloride over make-up chloride; conductivity-controlled blowdown automation is recommended.
- Drift is 11% of recirculating water without eliminators and down to 0.1% with good ones; tower basins at 29-35 °C carry Legionella risk.
Using it in design
- Involve the water treatment consultant at design stage and place closed-loop fill and drain points to allow initial flushing (fill on supply header, drain on return header, drain at the lowest point).
- Schedule chemical flushing, refilling and protection immediately after at closed-loop commissioning; check make-up hardness limits (for example 250 ppm CaCO3 for chilled water).
- Provide bag-filter side-stream filtration (5-10% of system volume) on closed loops.
- Add conductivity-controlled blowdown and dosing automation with pH and ORP monitoring to towers and verify the COC target with the chloride ratio.
- Make scale control on heat exchangers and condensers part of the energy target and keep meter and operating-hour records.
Who should read it
Mechanical engineers and operators dealing with heating, cooling and tower water treatment.
Document contents
- Introduction
- Closed-Loop Systems
- Chemical Flushing of Closed Loops
- Chemical Protection of Closed Loops
- Filtration in Closed Loops
- Cooling Tower Systems
- Conclusion
- References
Publication details
- Authors
- Sema Çelebi
- Publisher
- Türk Tesisat Mühendisleri Derneği
- Year
- 2011
- Document number
- TTMD Dergisi 75, Eylül–Ekim 2011, s. 30–38
- Document language
- Turkish
- Source type
- Expert / community
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Yayıncının açık PDF dosyası okundu. Açık erişim yeniden dağıtım izni anlamına gelmez; yalnızca künye, özgün kısa özet ve sayfa atıfları kaydedildi. Kayıt Sema Çelebi imzalı özgün makaleye aittir; aynı sayının diğer makaleleri özetlenmemiştir.
Citation
Sema Çelebi (2011). Su Şartlandırmanın Enerji Verimliliğine Etkisi. Türk Tesisat Mühendisleri Derneği. TTMD Dergisi 75, Eylül–Ekim 2011, s. 30–38. https://ttmd.org.tr/upload/files/82166TTMD-Dergisi-75.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.