Technical guideFree to read2024

Public Data on Data Centre Energy Use: Collation and Analysis

Original title Public Data on Data Centre Energy Use: Collation and analysis

IEA 4E EDNA · Fiona Brocklehurst

Brocklehurst's November 2024 study for IEA 4E EDNA analyses public data from building benchmarking schemes: 159 Servers & IT sites in France reported 1.9 TWh and 12 US schemes about 3 TWh in 2022.

On this page

Overview

The study set out to gather and analyse publicly available data on energy use by data centres. Data were available only within building energy benchmarking schemes. France's ELAN regulation published 2021 data aggregated by building type: 159 Servers & IT sites reported a combined 800,000 m2 floor area and 1.9 TWh of energy (99% electricity), and with a mean energy use intensity (EUI) of 2,477 kWh/m2 this was the highest building category.

North America has over fifty state, county and city schemes; 12 of them published data detailed enough for analysis where at least one data centre reported: California, Boston, Brisbane, Cambridge, Chicago, Evanston, Lexington, Montgomery County, New York City, San Francisco, Seattle and Washington DC. Reporting sites numbered 5 in 2014, 98 in 2019 and 118 in 2021; total reported energy was 0.030 TWh in 2014, 2.659 TWh in 2021 and 2.916 TWh in 2022.

The analysis found no clear relationship between EUI and place, floor area or time; EUI varies widely within each jurisdiction. Causes include poor reporting compliance (sites report inconsistently from year to year, so the sample changes), ambiguity between the two Portfolio Manager site categories (Data Center and Other - Technology/Science), and the fact that these schemes do not collect data-centre-specific information such as installed IT power, type of operation (enterprise or colocation) and utilisation.

The author concludes that the data give no useful information on energy efficiency, and that the most useful output is the order of magnitude of total energy in these jurisdictions. The process is manual by jurisdiction and year and hard to automate; repeating it is advised only for places with many reporting sites such as California and New York City. Data-centre-specific EU reporting obligations are expected to give more meaningful data, but had not yet reported at the time of analysis.

Key points

  1. France (ELAN), 2021: 159 Servers & IT sites, 800,000 m2 floor area, 1.9 TWh energy (99% electricity), mean EUI 2,477 kWh/m2.
  2. North America has over fifty schemes; 12 published analysable data; of 58 schemes investigated only 16 publish individual site records in spreadsheets.
  3. Reporting US sites: 5 in 2014, 11 in 2016, 45 in 2018, 98 in 2019, 111 in 2020, 118 in 2021, 78 in 2022.
  4. Total reported energy: 1.527 TWh in 2018, 2.582 TWh in 2020, 2.659 TWh in 2021, 2.916 TWh in 2022; total floor area 1,169,277 m2 in 2022.
  5. US schemes together reported about 3 TWh in 2022 and the French Servers & IT category about 2 TWh in 2021, against about 200 TWh global data-centre energy in 2021 and about 220 TWh for 2024 in the TEM study, so the collected data are a small fraction.
  6. No clear relationship between EUI and place, floor area or time; wide variation within each jurisdiction.
  7. Causes: inconsistent reporting and a changing site population, ambiguity between two Portfolio Manager categories, and no data on installed IT power or utilisation.
  8. The analysis was done in May-July 2024; EU data-centre-specific reporting deadlines had not yet passed.

Using it in design

  • Do not derive data-centre design targets from public building benchmarking data (EUI, kWh/m2); EUI without installed IT power, utilisation and operation type is not a meaningful benchmark for data centres.
  • For sites that must report energy data, add the data fields the scheme asks for (floor area, energy, IT power, utilisation) to the design's measurement plan from the start.
  • When making national or regional demand estimates, treat the aggregated values in this study (France 1.9 TWh, US about 3 TWh) as a small fraction of the global total.
  • For benchmarking, look to the data that the EU data-centre register and national reporting systems (for example Germany) will publish; they contain data-centre-specific indicators such as PUE and IT power.
  • For a data-centre facility subject to building energy disclosure schemes, verify that the site is registered in the correct category (Data Center versus Other - Technology/Science).

Who should read it

Analysts benchmarking data-centre energy, policy developers, and operators and engineers preparing facility energy reports.

Document contents

  1. Executive summary
  2. 1 Background and introduction
  3. 2 Methodology (search for national schemes, search for North American schemes, analysis)
  4. 3 National and supranational schemes
  5. 4 Overview of published data (limitations, North American schemes, particular issues)
  6. 6 Results and their interpretation (France, North America, sources of variation, energy by fuel type)
  7. 7 Summary and conclusions (data availability and quality, insights, updating process)
  8. Appendix 1: National and supranational data collection schemes (EU EED 2023, France ELAN, Germany EnEfG)
  9. Appendix 2: North American building energy benchmarking schemes and analysis results

Publication details

Authors
Fiona Brocklehurst
Publisher
IEA 4E EDNA
Year
2024
Document number
Version 1, November 2024
Document language
English
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Official publisher document inspected. No document-specific commercial redistribution permission established; retain metadata and original short summaries only.

Citation

Fiona Brocklehurst (2024). Public Data on Data Centre Energy Use: Collation and analysis. IEA 4E EDNA. Version 1, November 2024. https://www.iea-4e.org/wp-content/uploads/2024/06/DC2b_Data_Registration_Schemes_v1.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.