Recommendation ITU-T L.1300 (06/2014): Best practices for green data centres
International Telecommunication Union (ITU-T) · ITU-T Study Group 5
ITU-T Recommendation L.1300 (2014) replaces the 2011 edition and is a 68-page reference of numbered best practices covering planning, ICT equipment, cooling, power, building, monitoring, network and cloud, with five annexes.
On this page
Overview
L.1300 describes best practices aimed at reducing the negative climate impact of data centres. A green data centre is defined as one whose mechanical, lighting, electrical and computer systems are designed for maximum energy efficiency and minimum environmental impact. The text is a set of rules to refer to when improving existing facilities or planning new ones, and states that environmental impact should also be assessed under L.1400, L.1410 and L.1420.
Content is divided into ten headings: planning and management, ICT equipment and services, cooling, power equipment, other equipment, building, monitoring, network design, cloud data centre and optimization of whole-site energy management. Practices are numbered for easy reference. The document assigns no qualitative value or priority to practices; where there is a choice, the one with least environmental impact should be preferred. ICT tender clauses do mark high and low priority practices.
Numerical examples include a minimum server-intake range of 18 to 32 degrees C with dew point from 5.5 to 15 degrees C and 60% RH for new ICT purchases, and an extended 5 to 40 degrees C and 5 to 80% RH range (up to 45 degrees C in exceptional cases). The cloud section expects 8 to 10 kW per rack and above against 2 to 4 kW in conventional centres, and recommends closed cooling, modular VFI UPS and lithium-ion batteries for racks around 30 kW.
The annexes cover outdoor-air, snow and ice cooling in cold regions, choosing cooling methods for high-density ICT, correcting equipment airflow direction, the minimum data set for energy-saving control and verification experiments on air-conditioning and control technology. The document dates from 2014; the practices are at method level and do not give individual savings percentages.
Key points
- Edition 2.0 (06/2014), approved 29 June 2014 and in force, supersedes the first edition of 29 November 2011.
- Practices are grouped into ten headings: planning, ICT, cooling, power, other equipment, building, monitoring, network, cloud and integrated energy management.
- ICT tenders should require a minimum intake range of 18 to 32 degrees C with 5.5 to 15 degrees C dew point and up to 60% RH; an extended 5 to 40 degrees C and 5 to 80% RH range (ETSI EN 300 019-1-3 Class 3.1) is the stronger requirement.
- From 40 to 45 degrees C intake, equipment may reduce performance but not below 80% of nominal.
- Single-phase power is advised for racks at 4 kW or less, and measurable three-phase cabinet panels above 4 kW.
- Cloud data centres should plan for 8 to 10 kW per rack and above (conventional 2 to 4 kW); racks near 30 kW use closed cooling that does not discharge heat to the room.
- Raising chilled-water temperature from 7 to 12 degrees C to 15 to 20 degrees C improves free-cooling efficiency; free cooling for at least 70% of the year in mid latitudes is cited as a case study.
- For high-density cooling resilience, supply the cooling system from UPS, add ATS-backed redundant power and use thermal storage for 4 to 15 minutes of chilled water.
- Annexes: cold-region outdoor-air and snow-ice cooling, cooling choice for high-density ICT, airflow direction correction, minimum data set and verification experiments.
Using it in design
- Add intake temperature and humidity range to the ICT procurement specification as a high-priority criterion; the most restrictive equipment sets the facility conditions, so segregate equipment with different needs.
- Use the 4 kW per-rack threshold to separate single- and three-phase distribution, and 8 to 10 kW and above to drive cooling architecture in cloud or high-density halls.
- In high-density halls, put cooling on UPS, provide ATS-backed redundant feeds and size the chilled-water store for 4 to 15 minutes of ride-through.
- Assess higher chilled-water temperature together with the resulting free-cooling hours, and run your own hourly analysis for the local climate.
- Use practice numbers as reference codes in the design checklist, and pair measurement points and verification with L.1301 and L.1302.
Who should read it
Owners, operators and design engineers building or improving data centres, especially those working with telecom and the ITU standards family.
Document contents
- Scope
- References
- Definitions
- Abbreviations and acronyms
- Introduction to best practices for green data centres
- Planning, utilization and management of data centres
- ICT equipment and services
- Cooling
- Data centre power equipment
- Other data centre equipment
- Data centre building
- Monitoring
- Design of network
- Cloud data centre
- Optimization of energy management of whole data centre
- Annex A: Cooling data centres by using renewable energy in cold regions
- Annex B: Cooling data centres with high-density ICT devices
- Annex C: Correcting airflow direction for equipment
- Annex D: Minimum data set for energy saving management
- Annex E: Verification experiments
Related standards
- EU Code of Conduct for Data Centres
- ITU-T L.1301
- ITU-T L.1302
Publication details
- Authors
- ITU-T Study Group 5
- Publisher
- International Telecommunication Union (ITU-T)
- Year
- 2014
- Document number
- ITU-T L.1300 (06/2014)
- Document language
- English
- Source type
- Expert / community
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
ITU Recommendation; English PDF listed as freely available, all rights reserved.
Citation
ITU-T Study Group 5 (2014). Recommendation ITU-T L.1300 (06/2014): Best practices for green data centres. International Telecommunication Union (ITU-T). ITU-T L.1300 (06/2014). https://www.itu.int/rec/T-REC-L.1300-201406-I/en
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.