Government ICT Networks
ICT Authority Kenya
Kenya ICT Authority standard ICTA.2.1.003:2023 sets telecommunication room sizes (at least 71 sq ft), a raised floor of at least 300 mm, structured-cabling limits, and commissioning and maintenance evidence for government bodies.
On this page
Overview
The standard defines minimum requirements for network design, installation, documentation, commissioning and maintenance in Kenyan public bodies (MCDAs). Content covers the telecommunication room and pathways, structured cabling, wireless, fixed telephony, routing and switching, network design and commissioning, internet, monitoring, preventive maintenance and network security. Separate telecommunication and equipment rooms are expected.
Room requirements are numeric: at least 71 sq ft with no electrical distribution equipment; at least one metre working access in front, behind and beside cabinets; 10 x 7 ft for 5000 sq ft of office space, 10 x 9 for 8000 and 10 x 11 for 10000; floor distribution rooms at least 13 x 13 ft; and a walk-in design for buildings with over 300 cables. The door opens outward and is at least 36 x 80 in; the room sits in a secure restricted area with 24/7 ICT access, access control and CCTV, has no false ceiling and is separated from EMI sources such as antennas, elevators, motors and generators. The raised floor is at least 300 mm.
Environment and power: 18 to 29 degrees (never below 10), relative humidity 30% to 80%, and an HVAC system for installations over 300 cables. Power needs at least two dedicated 220-240 V circuits from different phases, earthing, surge suppression and at least two smart UPS units giving at least 8 hours of standby power, plus at least 6 hours of standby lighting. Pathways are sized at 2.5 times current needs and separated from power wiring by 50 mm plus an earthed metal fillet.
In structured cabling, at least Cat 6A UTP indoors and Cat 6 STP outdoors; patch cords not over 5 m and horizontal cable not over 90 m between faceplate and patch panel. Cabinets: at least one 42U cabinet for up to 200 data points. Monitoring requirements include SNMPv3, a dedicated management VLAN, VPN remote access, at least 99.99% availability for WLAN, WAN and internet, and latency limits for a 1518-byte frame (130 microseconds at 100 Mb/s, 18 at 1 Gb/s, 6.5 at 10 Gb/s). At commissioning, cable-component test results are recorded, physical and logical design documented as built, all components tested and a completion certificate issued; designs are updated on every change.
Key points
- Telecommunication room at least 71 sq ft, with no electrical distribution equipment and at least 1 m working access around cabinets.
- Room sizes: 10 x 7 ft for 5000 sq ft of office, 10 x 9 for 8000, 10 x 11 for 10000; floor distribution room at least 13 x 13 ft; walk-in design above 300 cables.
- Raised floor at least 300 mm; no false ceiling; door at least 36 x 80 in opening outward; access control and CCTV.
- Temperature 18 to 29 degrees (never below 10), relative humidity 30% to 80%; HVAC mandatory above 300 cables.
- Power: at least two dedicated 220-240 V circuits from different phases, at least 2 UPS units with at least 8 hours standby and 6 hours standby lighting.
- Pathways sized at 2.5 times current needs; 50 mm plus earthed metal fillet separation from power.
- Horizontal cabling: Cat 6A UTP indoors, Cat 6 STP outdoors; patch cords up to 5 m, horizontal cable up to 90 m; no splices or intermediate transition points.
- At least one 42U cabinet for up to 200 data points; SNMPv3, dedicated management VLAN and at least 99.99% availability for WAN, WLAN and internet.
- Preventive maintenance quarterly; RFC 5424 severity 0-2 logs are failures, 3-4 conditional failures.
- Commissioning needs an as-built record, cable-component test records and a completion certificate; designs are updated on every change.
Using it in design
- Put minimum room area, working clearance, raised floor, EMI distance and access control items on the design checklist for telecommunication and equipment rooms.
- Design the room environment for 18 to 29 degrees and 30% to 80% relative humidity, and make HVAC mandatory for installations over 300 cables.
- Write two circuits from different phases, at least two UPS units and 8 hours of standby power into the electrical design for critical rooms.
- Size pathway capacity at 2.5 times current need and leave 50 mm plus earthed fillet separation from power routes.
- Put the Cat 6A, 90 m and 5 m limits and the splice ban in the specification; tie test results to the record book and as-built file.
- Add the completion certificate, current physical and logical diagrams and the quarterly preventive-maintenance schedule to the handover file.
Who should read it
Engineers designing networks and telecommunication rooms for Kenyan public bodies, commissioning and audit teams, and government ICT managers.
Document contents
- Introduction, scope, application, normative references, definitions, abbreviations, sub domains
- Standards requirements: telecommunication room, pathways and space (room requirements, design, environmental conditions, power, pathways)
- Structured cabling: cabling media, cabinet
- Wireless network connectivity
- Fixed telephony service
- Routing and switching
- Network design, configuration, documentation and commissioning
- Internet
- Network monitoring and management
- Preventive maintenance
- Network security
- Appendix: template for network inspection in preparation for commissioning
Publication details
- Authors
- ICT Authority Kenya
- Publisher
- ICT Authority Kenya
- Year
- 2023
- Document number
- ICTA.2.1.003:2023
- Document language
- English
- Source type
- Government / public
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Public official source inspected; no document-specific commercial redistribution permission established. Original short summaries and metadata only; downloads are local research evidence. PDF p. 2 expressly reserves ICTA copyright and reproduction rights.
Citation
ICT Authority Kenya (2023). Government ICT Networks. ICT Authority Kenya. ICTA.2.1.003:2023. https://cms.icta.go.ke/sites/default/files/2023-07/ICT%20Networks%20Standard%202023.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.