Technical guideFree to read2014

LevelUps Series 100-120 kVA UPS: User Manual (AG-SD-86)

Original title LevelUps Serisi 100–120 kVA: Kullanma Kılavuzu

Makelsan

Makelsan's November 2014 manual for the LevelUps 100-120 kVA UPS: input THDi under 4%, efficiency up to 96%, 10 minutes at 125% overload, up to 8 units in parallel, with detailed installation, operation and event tables.

On this page

Overview

The manual gives installation, operation and maintenance information for the 100 kVA/100 kW and 120 kVA/120 kW LevelUps three-phase double-conversion UPS. The safety section requires installation and first start-up by authorised staff only, an earthed connection, notes that earth leakage current can reach 0.4 A and battery voltage 450 Vdc, and requires waiting at least 5 minutes for the DC bus capacitors to discharge before service.

The product description covers the normal (online), battery, bypass, automatic start and maintenance bypass modes, static transfer switches, battery temperature adjustment and automatic battery test, and introduces the user panel menus (control, status, settings, events, service). The installation section covers single-module and parallel installation, positioning, external battery placement, external protection, cable and fuse selection, battery connection procedure and control and communication cabling.

The operation section covers first start-up, the test sequence for transfers from normal mode to battery, static bypass and maintenance bypass, full shutdown, EPO and RS232 communication. The events section explains numbered event codes, and the technical table gives the electrical limits. It is a product manual: it holds no selection or comparison for design decisions, only the values valid for this series.

It is the first edition (Rev. 0) from 2014 and points to elektroiz.com.tr for current manuals. For designers it is a practical reference to the space, cooling, protection and battery needs of a 100-120 kVA UPS found in the field in Turkey.

Key points

  1. Rating 100 kVA/100 kW and 120 kVA/120 kW; input 220/380 VAC -15%/+18%, 3P+N+PE, 45-65 Hz; IGBT rectifier, input power factor above 0.99 at full load, input THDi under 4%.
  2. Output 220/240 VAC, static +/-1%; for a 0-100-0% load step, output tolerance at most 5% and return to the 1% band within 40 ms; efficiency up to 96%.
  3. Output THDv under 2% on linear load and under 6% on non-linear (bridge) load; crest factor 3:1.
  4. Overload capacity is 10 minutes at 125% load and 1 minute at 150% load.
  5. Battery: 62 x 12 V DC VRLA (two independent strings of 31), nominal charge 0.1 C and charging power of 25% of rated power; battery voltage can reach 450 Vdc.
  6. Weight without batteries is 350 kg (100 kVA) and 355 kg (120 kVA); dimensions 810 x 820 x 1705 mm; protection class IP20.
  7. Operating temperature 0-40 degrees C (0-25 degrees C for batteries); altitude below 1000 m no derating, below 2000 m factor above 0.92, below 3000 m above 0.84.
  8. Up to 8 units in parallel for capacity; at least 1 m clearance at front and rear; air enters at the front and exits at the rear.
  9. Certificates: ISO 9001, IEC 62040-1, IEC 60950, IEC 62040-2 for EMC; communication RS232 standard, RS485 and SNMP optional; 500-event log.

Using it in design

  • In layout leave at least 1 m clear at the front and rear of the unit; there is no side air intake, so units can sit side by side.
  • Plan heat load and ventilation against the 0-40 degrees C operating range and the 0-25 degrees C limit for batteries; control battery room temperature separately.
  • Use input THDi under 4% and power factor above 0.99 in generator and transformer sizing; ask whether extra harmonic filtering is needed on the mains side.
  • In external battery cabinets use aR or gR semiconductor fuses and place them as close to the batteries as possible.
  • For growth redundancy, evaluate the parallel configuration of up to 8 units and the 10-minute 125% overload limit in the specification.
  • In the maintenance procedure state that the UPS must be isolated from mains and batteries and that 5 minutes must pass for the DC bus to discharge.

Who should read it

Electrical engineers and field service technicians who install, operate or specify 100-120 kVA UPS.

Document contents

  1. Safety and warnings
  2. Product description (operating modes, battery management, user panel)
  3. Installation (single module, parallel installation)
  4. Operation
  5. Events and explanations
  6. Technical specifications table
  7. Contact information

Publication details

Authors
Makelsan
Publisher
Makelsan
Year
2014
Document number
AG-SD-86, Yayın No. 1, Rev. 0
Document language
Turkish
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Makelsan manual with document code and factory identity, publicly hosted by Elektroiz and linked from its LevelUps product page. Native manufacturer URL returned 404. The distributor edition includes adapted support references; byte identity to an original OEM file is not established. No redistribution permission established.

Citation

Makelsan (2014). LevelUps Serisi 100–120 kVA: Kullanma Kılavuzu. Makelsan. AG-SD-86, Yayın No. 1, Rev. 0. https://www.elektroiz.com.tr/uploads/pdf-tr/makelsan-ups-levelups-100-120-kva-kullanma-kilavuzu-tr.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.