Overview
The document offers a starting point for designing a fluid-servicing cart for liquid-cooled data centres. The requirements are given as an example based on Facebook's expected fluid-maintenance needs, and each site is told to adapt them to its own needs. The design lessons come from a cart Intel built for liquid-cooling testing and metrology maintenance. Three basic operations are defined: flush, charge and purge (which also dries the loop).
Newly deployed racks need the manifold, hoses, quick connectors and cold plates cleared of foreign debris and filled; fluid is typically circulated for at least thirty minutes before filters are replaced. When complete fluid replacement is needed, the cart switches first to purge, then flushes with deionised water or inhibited propylene glycol, and finally charges. That calls for at least two reservoirs, one for deionised water and one for treated water or inhibited propylene glycol.
In the functional-requirement table the high-priority items are: draining the whole rack, coolant material compatibility, a drain container sized for the rack's full liquid volume, rack interface, pumping capability, fresh-fluid storage for the rack's full volume, pluggable power, leak detection with pump cut-off, pressure monitoring, a return line for air and coolant overflow, compressed air and lockable wheels. Servicing from the cold aisle is preferred; if the cart must enter the hot aisle it must fit the minimum aisle width. Reservoir capacity should add a 3-5 L buffer to the rack's total volume.
The example cart's flow diagram includes a charge path through quick-disconnect couplings, a bubble trap, a 10 micrometre filter and an ultrasonic flow meter, and a purge path using pressurised air or nitrogen through a regulator and filter. For pump selection, the cart's own pressure drop should be subtracted from the pump curve and the cart's performance curve verified by test against a representative system pressure-drop curve. The document also recommends a drip-containment tray, leak sensing, baffles against sloshing and a universal quick-disconnect (UQD) interface.
Key points
- Three operations: flush (clear contaminants or old fluid), charge (fill with new fluid) and purge (push fluid out with air or nitrogen, which also dries).
- On a new rack, fluid is typically circulated for at least 30 minutes before filters are replaced.
- Full fluid replacement needs at least two reservoirs: deionised water, and treated water or inhibited propylene glycol.
- Reservoir capacity should include an extra 3-5 L buffer above the rack's total liquid volume.
- Servicing from the cold aisle is preferred; a cart entering the hot aisle must fit the minimum aisle width.
- In the example cart, fluid passes a bubble trap, a 10 micrometre filter and an ultrasonic flow meter before reaching the rack.
- The purge path uses pressurised air or nitrogen through a regulator and filter; a toggle switch cuts pump power so the pump does not run on air.
- High-priority requirements include leak detection with pump cut-off, pressure monitoring, an overflow and air return line, and lockable wheels.
- For pump selection, subtract the cart's pressure drop from the pump curve and compare the result with a representative system pressure-drop curve.
- A universal quick-disconnect (UQD) interface and adapters ease connection to racks of different sizes.
Using it in design
- In the hall layout, check aisle width, turning radius and collision risks from features outside the rack frame for the servicing cart's route; plan to connect the cart to racks from the cold aisle.
- Include in the design a refill station outside the hall for the cart and waste-fluid handling; refilling away from the hall is preferred because of leak and spill risk.
- Add flush, charge, bubble-removal and 30-minute circulation steps to the commissioning procedure, and confirm that at least two fluid reservoirs are available for flushing and charging.
- Specify the cart reservoir size from fluid type and rack volume (rack volume + 3-5 L) and a 10 micrometre filter.
- Choose a rack service interface compatible with UQD, and include the cart's leak detection and pump cut-off in acceptance testing.
Who should read it
Operations and commissioning teams of liquid-cooled halls, facility layout designers and servicing-equipment manufacturers.
Document contents
- Introduction and scope
- The need for fluid servicing (flush, charge, purge)
- Mobile cart for liquid cooling testing (example)
- Functional requirements and use cases
- Accessibility, reservoir capacity, size and mobility
- Key capability considerations (flush, charge and purge cycles, bubble trap, filter, flow meter)
- Pump selection, drip containment and material compatibility
Related standards
- OCP Liquid Cooling Integration and Logistics white paper
Read the document
ocp-mobile-fluid-servicing-cart-2021.pdf
CC BY-SA 4.0: share with attribution under the same licence
The document is provided unaltered because its licence permits redistribution.
Publication details
- Authors
- Jordan Johnson (Intel); Saurabh Kulkarni (Facebook); Sean Sivapalan (Intel)
- Publisher
- Open Compute Project Foundation
- Year
- 2021
- Document number
- Revision 1.0
- Document language
- English
- Source type
- Industry body
- Access
- Open licence (downloadable)
- Licence
- CC BY-SA 4.0: share with attribution under the same licence
- Licence evidence
- www.opencompute.org
Original licence note
Creative Commons Attribution-ShareAlike 4.0 International; licence verified from the licence statement in the document itself. Attribution to the authors and publisher is kept; adaptations must keep the same licence.
Citation
Jordan Johnson (Intel); Saurabh Kulkarni (Facebook); Sean Sivapalan (Intel) (2021). Developing a Mobile Cart for Datacenter Fluid Servicing, Revision 1.0. Open Compute Project Foundation. Revision 1.0. https://www.opencompute.org/documents/mobile-fluid-cart-rev-1-0-pdf/
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.