Open Rack V3 48V BBU (Battery Backup Unit Module) Specification, Rev 1.4
Open Compute Project Foundation · Sun, D., Shapiro, D. et al.
The Open Compute Project specification (Rev 1.4, 2023) for the 3 kW lithium-ion battery backup module used in Open Rack V3 BBU shelves. It sets numeric electrical, thermal, mechanical and safety requirements for rack-level distributed backup.
OWFa 1.0: Open Compute open specification licence; redistribution permitted
On this page
Overview
The document defines a single battery module that slots into the Open Rack V3 BBU shelf. Six BBUs sit in the shelf with redundancy, and the system works on a narrow-range 48 V architecture with 47.5-48 V output. Each module contains a battery pack with BMS, a bidirectional charger and discharger, and auxiliary blocks. The specification was contributed by Meta and published under OWFa 1.0; several values are still marked TBD in the text.
The electrical core is the set of operating modes: sleep (storage and transport), standby (most of the module's life), discharge, charge, state-of-health (SOH) test, periodic charge, fault and system-control modes. Standby consumption, fan included, must stay below 15 W. If bus voltage falls below 48.5 V for 2 ms the BBU takes over within 2 ms, and the bus may never drop under 46 V during the transition. The discharger delivers up to 3000 W and 63.2 A, with peaks up to 150% of rated power.
The reference cell is an 18650 Li-ion (at least 1.5 Ah, 4.2 V maximum) and the recommended pack is 11S6P. After at least 4 years at 35 C the pack must still supply 3 kW for at least 4 minutes at the PCM threshold (for example 3.9 V per cell). Charge current is chosen as 1 A or 2 A from the previous discharge energy (200 kJ threshold), and the rack monitor can override it between 0 and 5 A. Maximum recharge time from 0% to 100% is 6 hours, and charging is delayed 1 minute after a discharge event.
Monitoring and maintenance logic is detailed. Every 90 days the BBU runs an SOH test by forced discharge; only one module per shelf tests at a time, and the others join the discharge so shelf backup is preserved. Target SOH accuracy is +/-3% of full charge capacity. A forced-discharge mode supports peak-power shaving and a forced-detached mode allows remote rack power cycling. Communication runs over Modbus and CAN, and firmware updates must take under 2 minutes per BBU.
Environmental, reliability and safety sections define acceptance criteria: 0-40 C operation, 15-35 C long-term ambient, altitude up to 3000 m and an 85 dBA noise limit. The fan needs an 8-year (70,000 h) L10 life at 40 C, all electrolytic capacitors must exceed 8 years, and the BBU excluding battery needs at least 1,000,000 h MTBF at 45 C and full load. Safety requires UL/IEC/EN 62368-1, IEC 62619, UL 9540 and UL 9540A at cell, module and unit level; a module must neither explode nor spread fire during cell thermal runaway.
Key points
- The battery pack must deliver 3 kW for at least 4 minutes at the PCM threshold (e.g. 3.9 V/cell) after at least 4 years at 35 C (Section 4.2.1).
- Reference cell is 18650 Li-ion and the recommended pack is 11S6P; discharger input 28.6-44.0 V, input current up to 110 A.
- Output is 48.0 V at 0% load and 47.5 V at 100% (0.5 V droop); output power 3000 W / 63.2 A; discharger efficiency at least 97%, charger at least 95%.
- Discharge starts when bus voltage stays below 48.5 V for 2 ms; startup time is at most 2 ms and the bus must never fall below 46 V.
- Peak load may reach 150% of rated power; in overload the droop extends linearly (47.25 V at 150% load).
- Maximum recharge time is 6 hours (0-100%, 2 A per pack); charge power is 130 W at 2 A and 265 W at 5 A; charging is delayed 1 minute after a discharge.
- The SOH test runs every 90 days, one module per shelf at a time, with depth of discharge limited so 90 s of 3 kW backup remains.
- Standby power is below 15 W including the fan; fan L10 life is 8 years (70,000 h) at 40 C; BBU life is at least 8 years.
- Safety: UL/IEC/EN 62368-1, IEC 62619, UL 9540 and UL 9540A at cell, module and unit level; no explosion or fire spread on thermal runaway.
- Forced discharge mode raises BBU output by 3 V for peak shaving; forced detached mode defaults to a 30-minute timeout for remote rack reboot.
Using it in design
- Assess 3 kW per module, four-minute runtime and six-hour recharge against the ORV3 BBU specification in preliminary calculations.
- Model the period after an outage during which the rack runs without full backup until recharge completes, especially for generator re-transfer and repeated-outage scenarios.
- Include the 8-year BBU replacement cycle in lifecycle cost and embodied-carbon estimates.
- When distributed lithium BBUs are used, make UL 9540A evidence (cell, module, unit) mandatory in the fire-strategy checklist.
- Where many racks request charge at once, stagger recharge load using the variable charge current (1 A / 2 A) and the rack monitor's 0-5 A override.
- Keep module ambient inside the 15-35 C long-term range; the battery aging assumptions rest on it.
Who should read it
Power-system engineers evaluating rack-level battery backup of the Open Rack V3 type, rack and BBU suppliers, and fire-safety owners.
Document contents
- License
- Compliance with OCP Tenets
- Scope
- Overview
- Acronyms
- Electrical Requirements
- BBU Operation Modes
- Battery Pack
- Discharger
- Charger
- Transition between Power Shelf and BBU Shelf
- SOH test
- Current Sharing and Redundancy
- Redundancy and Hot Swap
- Fuse and Protections
- Signal Pin Descriptions
- Communication and Firmware
- Environment
- Thermal
- Mechanical
- Reliability and Quality
- Compliance requirements
Related standards
- OCP Open Rack V3 BBU Shelf Specification
- IEC 62619
- UL 9540
- UL 9540A
- IEC 62368-1
- IPC-9592B
Read the document
ocp-orv3-bbu-module-spec.pdf
OWFa 1.0: Open Compute open specification licence; redistribution permitted
The document is provided unaltered because its licence permits redistribution.
Publication details
- Authors
- Sun, D.; Shapiro, D.; Kim, B.; Athavale, J.; Mercado, R. (Meta)
- Publisher
- Open Compute Project Foundation
- Year
- 2023
- Document number
- Rev 1.4
- Document language
- English
- Source type
- Industry body
- Access
- Open licence (downloadable)
- Licence
- OWFa 1.0: Open Compute open specification licence; redistribution permitted
- Licence evidence
- www.opencompute.org
Original licence note
Page 2 (Section 1 License) states contribution under OWF CLA 1.0 and use under the Open Web Foundation Modified Final Specification Agreement (OWFa 1.0); appendices are excluded from the licence.
Citation
Sun, D.; Shapiro, D.; Kim, B.; Athavale, J.; Mercado, R. (Meta) (2023). Open Rack V3 48V BBU (Battery Backup Unit Module) Specification, Rev 1.4. Open Compute Project Foundation. Rev 1.4. https://www.opencompute.org/documents/open-rack-v3-bbu-module-spec-1-4-pdf/
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.