Technical guideFree to read2026

Open Rack V3 HPR V2 12kW PSU Specification, Rev 1.0.0 (12 June 2026)

Open Compute Project Foundation · Jingjing Sun, Mohammed Alisa et al.

Specification of the 12 kW AC-to-50 V PSU module used in ORv3 high-power-rack (HPR) V2 power shelves, the building block of the existing 72 kW shelf. Beyond efficiency and power-quality limits it defines PSU-to-BBU hand-off signalling on AC loss and a pulse-load management mode for GPU loads with repetitive peaks, which matters for upstream UPS and generator sizing.

On this page

Overview

The specification defines single-phase 48 V PSUs that fit the 48 V power shelf. The power shelf includes several PSUs with at least N+1 redundancy. Output is 50 V nominal with an adjustable range; the document calls this a narrow-range 48 V architecture, which avoids oversized voltage and current design compared with ORv2's 40-60 V range, enables 4:1 fixed-ratio converters and 12 V PoL converters, and lets power flow naturally without software dependency. The initial OCP release is dated 12 June 2026.

Input and efficiency requirements are: 12 kW output; 200-277 VAC nominal, +/-10%; the PSU supplies output power over 180-305 VAC and 47-63 Hz, with the full 12 kW from 218-305 VAC and power derated to 10 kW at 180-218 VAC. Efficiency is measured at 230-277 V input with fans connected, at 25 degC ambient after 30 minutes at full load: over 97.5% peak and over 96.5% minimum across 30-100% load, and at least 94% at 10-30% load. Active power factor correction is included: power factor above 0.99 at 80-100% load and above 0.98 at 20-80% load; input current harmonic distortion at most 5% at 30-100% load.

Output voltage is 50 V at no load and 49 V at full load (1 V default droop, 48.5 V at 150% load); ripple is at most 500 mV peak to peak. Hold-up time after AC is lost is 20 ms at 100% load and 13.33 ms at 150% load.

On detecting AC loss the PSU asserts AC_Loss_L after a 4-5 ms validation delay so that the BBU shelf takes over; a second condition keeps remaining bulk-capacitor energy above 5 ms to let the BBU ramp up. When AC returns, the signal is released after at least 500 ms; to avoid BBU over-discharge in single-fault cases it is released after 300 seconds. The rack monitor can force BBUs to discharge while mains is present by toggling AC_Loss_L over Modbus.

The pulse load management mode is defined for GPU-based loads that may have repetitive peaks: the PSU must carry repetitive pulse loads while keeping output regulation and the input power limit, without triggering the BBU; the requirement is 140% (50 ms moving average), 160% (400 us) and 100% (1 s and longer) average, and the PSU's maximum input power limit must be adjustable to system requirements. High-voltage bus capacitance is maximised as an energy buffer for pulse power, and if the bulk capacitor energy is depleted a Pulse_Mgmt_L signal asks the BBU to share the pulse load. The operating environment is -5 to +45 degC inlet air and 10-90% relative humidity.

Key points

  1. 12 kW output at a nominal 50 V; input 200-277 VAC nominal +/-10%, operating range 180-305 VAC and 47-63 Hz; full 12 kW from 218 VAC, 10 kW at 180-218 VAC.
  2. Output voltage is 50 V at no load and 49 V at full load.
  3. Peak efficiency above 97.5%; minimum efficiency 96.5% across 30-100% load and at least 94% at 10-30% load.
  4. Power factor above 0.99 at 80-100% load and above 0.98 at 20-80% load; input current THD at most 5% at 30-100% load.
  5. Hold-up time is 20 ms at 100% load and 13.33 ms at 150% load.
  6. On AC loss the PSU asserts AC_Loss_L after a 4-5 ms validation delay so the BBU shelf takes over; the signal is released at least 500 ms after AC returns.
  7. Pulse load: 140% (50 ms average) and 160% (400 us) peaks must be carried without triggering the BBU; the PSU maximum input power limit must be adjustable.
  8. AC inrush current is at most 60 A RMS (85 A peak); re-rush current after dropout is below five times steady-state current for under 2 ms.
  9. The power shelf must include at least N+1 PSU redundancy.
  10. Operating environment: inlet air -5 to +45 degC, relative humidity 10-90%.

Using it in design

  • In upstream UPS and generator sizing, account for the GPU pulse load (140% and 160% peaks); the PSU can carry these peaks without triggering the BBU, but the upstream power fluctuation changes with the input power limit setting.
  • Check the AC input range (180-305 VAC) against the facility distribution voltage; allow in capacity calculations for PSU power falling to 10 kW at 180-218 VAC.
  • In loss and PUE calculations, enter PSU efficiency by load percentage: at least 96.5% at 30-100% load with 97.5% at peak, and at least 94% at 10-30% load.
  • In BBU shelf integration, write the AC_Loss_L and Pulse_Mgmt_L signal connections and timings (4-5 ms validation delay, 20 ms hold-up, 500 ms release delay) into trip and transfer scenarios.
  • Use the power factor (0.99) and THD (5%) values as inputs to upstream power-quality and harmonic calculations; carry the inrush (60 A RMS) and re-rush (five times, 2 ms) limits into protection coordination.

Who should read it

Electrical and hardware engineers designing ORv3 racks and power shelves, UPS and backup-power designers, and PSU and BBU manufacturers.

Document contents

  1. License
  2. Scope and glossary of acronyms
  3. Overview (narrow-range 48V architecture)
  4. Electrical Requirements (AC input, start-up, AC failure and recovery, input protection, inrush, efficiency, power factor, THD, output voltage, droop, ripple, dynamic response, hold-up time, PSU-BBU transition with AC_Loss_L, forced discharge, pulse load management, pulse power, output protections, current sharing, grounding, Y-cap, random timer, transition and synchronization, power system stability, connector, interoperability)
  5. Communication (firmware upgrades, metering accuracy, blackbox)
  6. Environment (temperature, humidity, gaseous contamination, altitude, acoustic noise, vibration and shock)
  7. Thermal
  8. Mechanical
  9. Reliability, manufacturing, quality and compliance

Related standards

  • OCP ORv3 HPR V2 72kW Power Shelf
  • OCP ORv3 BBU Shelf
  • IEC 61000-3-2

Publication details

Authors
Jingjing Sun; Mohammed Alisa; David Sun; Wenying Zhang; Dmitriy Shapiro; John Fernandes; Ben Kim; Jaswanth Vutukury; Baby Neil Escuadro; Siu Lam; Bo Wen; Zibo Chen
Publisher
Open Compute Project Foundation
Year
2026
Document number
Rev 1.0.0
Document language
English
Source type
Industry body
Access
Free to read
Licence
OWFa 0.9: Open Compute open specification licence; redistribution permitted
Original licence note

Section 1.1: contributions under Modified OWFa 0.9 (16 Oct 2024); usage under Modified OWFa 0.9 FSA. Round 1 ingestion retains bibliographic metadata only; no local full text is redistributed.

Citation

Jingjing Sun; Mohammed Alisa; David Sun; Wenying Zhang; Dmitriy Shapiro; John Fernandes; Ben Kim; Jaswanth Vutukury; Baby Neil Escuadro; Siu Lam; Bo Wen; Zibo Chen (2026). Open Rack V3 HPR V2 12kW PSU Specification, Rev 1.0.0 (12 June 2026). Open Compute Project Foundation. Rev 1.0.0. https://www.opencompute.org/documents/open-rack-v3-hpr-v2-12kw-psu-module-spec-v1-0-0-pdf/

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.