White paperFree to read2008

The Importance of Air Sealing Grommets to Improving Smart Data Center Cooling Efficiency

Original title UPI Strategies for Thermal Management: The Importance of Air Sealing Grommets to Improving Smart Data Center Cooling Efficiency

Panduit · Panduit Corp.

An August 2008 Panduit white paper showing that unsealed cable cutouts can waste up to 60% of cooling capacity and that in a 150-cabinet example a 7 kW per cabinet design falls to 5 to 6 kW.

On this page

Overview

This 2008 paper states that industry data indicates up to 60% of available cooling capacity is wasted by airflow that bypasses the equipment it should cool. Sources are misplaced perforated tiles, poorly placed air conditioning units and unsealed cutouts under racks for cable routing. In a typical data center a perforated tile with 25% open area and 150 to 200 cfm can disperse about 1 kW of heat.

The median cutout under standard-density server cabinets is 4.5 × 6.5 in (nearly 30 square inches); under high-density cabinets it can be larger for water hoses or more cable. A chart of lost cfm and annual utility cost against the number of cutouts (50 to 500) quantifies the loss.

In Example 1, a 5,000 ft² room has 120 standard (7 kW) and 30 high-density (14 kW) cabinets, 1,260 kW total and 357 tons of cooling. Rear door exchangers take half the heat of the high-density cabinets and the rest goes to the floor system; ten 30-ton CRAH units supply 150,000 to 180,000 cfm. CFD shows 150 perforated tiles delivering 1,000 to 1,200 cfm per tile, needing 0.10 in water column underfloor pressure for 7 kW per cabinet. With 150 unsealed cutouts, about 24,936 cfm (166 cfm per cutout) bypasses, pressure falls to 0.07 in and tile flow to 780 to 950 cfm, so a system designed for 7 kW removes only 5 to 6 kW. Restoring pressure by adding two CRAH units ($40,000 each, about $4,600 a year to run) adds about $13,644 a year; leaving cutouts unsealed wastes $6,950 a year.

In Example 2 a 5,000 ft² room with 150 cabinets and 12 CRAH units loses over 16% of CRAH airflow through unsealed cutouts. A CRAH blower uses about 7,500 W for about 16,500 cfm (about 46 W per 100 cfm); at $0.07/kWh the bypass wastes nearly $8,900 a year. Sealing all cutouts allows two CRAH units to be switched off, saving $9,200 a year, with more savings if variable speed fans are fitted. The document is a vendor publication.

Key points

  1. Industry data indicates up to 60% of available cooling capacity is wasted by bypass airflow.
  2. A 25% open perforated tile with 150 to 200 cfm disperses about 1 kW.
  3. The median cutout under standard cabinets is 4.5 × 6.5 in (nearly 30 square inches).
  4. Example 1 (5,000 ft², 150 cabinets, 1,260 kW): sealed cutouts give 1,000 to 1,200 cfm per tile at 0.10 in water column.
  5. Unsealed, about 24,936 cfm (166 cfm per cutout) bypasses; pressure falls to 0.07 in and tile flow to 780 to 950 cfm.
  6. A system designed for 7 kW per cabinet removes only 5 to 6 kW with unsealed cutouts.
  7. In Example 1, bypass wastes $6,950 a year; two extra CRAH units add about $13,644 a year (annualized capital and operation).
  8. In Example 2, sealing cutouts lets two CRAH units be switched off, saving $9,200 a year ($0.07/kWh).

Using it in design

  • Require sealed grommets on all raised-floor cable cutouts and verify sealing at acceptance.
  • Monitor underfloor static pressure against the design value (0.10 in water column in the example) with measurement points.
  • Before adding capacity, calculate the effect of sealing cutout leakage on the number of CRAH units needed.
  • Seal the larger cutouts under high-density cabinets, made for water hoses and heavy cabling, separately.
  • After sealing, reset CRAH fan speed and number of running units.

Who should read it

Engineers designing and operating raised-floor data halls.

Document contents

  1. Introduction
  2. Optimizing Data Center Airflow
  3. The High Price of (Unsealed) Holes in the Floor
  4. Using Air Sealing Grommets to Optimize Energy Consumption (Examples 1 and 2)

Related standards

  • TIA-942
  • ASHRAE TC 9.9 thermal guidelines

Publication details

Authors
Panduit Corp.
Publisher
Panduit
Year
2008
Document number
WP-04
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

©2008 PANDUIT Corp. All rights reserved; copy hosted by distributor (Sonepar)

Citation

Panduit Corp. (2008). UPI Strategies for Thermal Management: The Importance of Air Sealing Grommets to Improving Smart Data Center Cooling Efficiency. Panduit. WP-04. https://res.cloudinary.com/sonepar-fr/raw/upload/s--v3eQmBg---/v1/documents/156/10755.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cooling capacity in SoSo CAD

Check zone heat loads, installed capacity and the capacity left with the largest unit out, as part of the design.

Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.