Research paperFree to read2026

Cost-Optimal Decarbonization Pathways for Data Centers in Japan: A Bottom-Up Model Integrating Location, Energy Systems, and Carbon Pricing

Energies (MDPI AG) · Jin Toyohara, Weisheng Zhou

A 2026 Energies study finds that in the DC-DECOM model, regional siting of Japanese data centres reaches 2040 net zero at 18-23% lower total system cost than a metropolitan-only scenario.

On this page

Overview

The study presents a bottom-up cost optimisation model (DC-DECOM) aiming for carbon neutrality of the information and communications technology (ICT) sector in Japan's data-centre industry by 2040. The model represents PUE as a dynamic function of ambient temperature and cooling technology and combines technology selection, regional energy supply and carbon pricing in one cost-minimisation framework.

Three scenarios are compared: a reference case (REF), a centralised carbon-neutral scenario (C-CN) restricting new capacity to metropolitan areas, and a regional decentralisation scenario (R-CN) allowing nationwide siting. Inputs are calibrated against IEA, Uptime Institute, Japan's Ministry of Internal Affairs and Communications white papers and JST data.

R-CN reaches the 2040 net-zero target at 18-23% lower total system cost than C-CN. The gap splits into four channels: cooling-energy reduction about 35%, lower regional renewable procurement cost about 30%, lower carbon cost about 25% and lower siting cost about 10%. Sensitivity analysis identifies the carbon-price trajectory and hardware-efficiency improvement rate as the most influential parameters. Results are scenario projections, not measured results from actual Japanese facilities.

Key points

  1. Target: carbon neutrality of Japan's ICT sector by 2040; the model is called DC-DECOM.
  2. PUE is modelled as a function of ambient temperature and cooling technology.
  3. Three scenarios: REF, metropolitan-only C-CN and nationwide R-CN.
  4. R-CN gives 18-23% lower total system cost than C-CN.
  5. Gap channels: cooling energy ~35%, regional renewable procurement ~30%, carbon cost ~25%, siting cost ~10%.
  6. Carbon-price trajectory and hardware-efficiency improvement rate are the most influential parameters; the R-CN advantage stays positive across ±1σ variations and two combined stress tests.

Using it in design

  • In multi-region capacity planning, model PUE as a function of ambient temperature and cooling technology rather than a constant.
  • Compare cooling energy, regional renewable procurement and carbon cost in one cost model when choosing locations.
  • Run sensitivities on carbon price and hardware-efficiency improvement rate.
  • Use the scenario results as planning indicators, not as measured facility data.

Who should read it

Data-centre strategists, energy analysts and sustainability consultants working on capacity and location planning.

Publication details

Authors
Jin Toyohara; Weisheng Zhou
Publisher
Energies (MDPI AG)
Year
2026
Document language
English
Source type
Scientific
Access
Free to read
Licence
CC BY 4.0: share with attribution
Original licence note

Article-specific publisher copyright/rights statement explicitly grants CC BY; version 4.0 is corroborated by publisher-deposited Crossref license metadata. Third-party material may have separate rights. Round 3/4 ingestion retains bibliographic metadata only; no local full text is redistributed.

Citation

Jin Toyohara; Weisheng Zhou (2026). Cost-Optimal Decarbonization Pathways for Data Centers in Japan: A Bottom-Up Model Integrating Location, Energy Systems, and Carbon Pricing. Energies (MDPI AG). https://doi.org/10.3390/en19102485

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.