Overview

Caterpillar's catalogue LEXX0523-09 (11/2012) presents the Cat CTG series automatic transfer switches (ATS). The series offers the dependability of a contactor-type transfer switch in a pre-configured form, controlled by an MX150 microprocessor panel that shows switch position, timers and available sources.

Ratings run from 40 to 3000 A in 2, 3 or 4 poles. The switch is UL 1008 listed at 480 VAC, CSA certified at 600 VAC (200-225 A, 480 V) and IEC listed at 480 V. It is a double-throw, mechanically interlocked, electrically operated, mechanically held design, supplied as standard open transition (CTG) or delayed transition (CTGD). The standard enclosure is Type 1; open style or Types 3R, 4, 4X and 12 are available.

Control defaults: normal-source under-voltage pickup 90%, dropout 80%; under-frequency pickup 95%; engine start delay 3 s (0-10 s); retransfer delay 30 min (0-60 min); engine cool-down 5 min (0-60 min). For CTGD the delay from neutral position is 5 s by default (0-10 min). Options include timed plant exerciser, space heater, network communications (LonWorks/Modbus) and EPM 2000 and EPM 6000 meters.

The NEMA 1 enclosure table gives dimensions in inches (mm) and weight in lb (kg). 40-200 A is 24 x 18 x 11 in (610 x 457 x 279 mm) at 69 lb (31 kg); 400 A is 46 x 24 x 14 in at 168 lb (76 kg) for 2-3 poles; 800-1200 A is 74 x 40 x 19.5 in; 1600-3000 A is 90 x 35.5 x 48 in at 1030-1400 lb. The notes call dimensions and weights approximate and add 15% for packaging.

Key points

  1. Ratings 40-3000 A, 2/3/4 poles; UL 1008 480 VAC, CSA 600 VAC (200-225 A), IEC 480 V.
  2. Open transition CTG and delayed transition CTGD; MX150 microprocessor panel.
  3. Pickup/dropout defaults: normal-source under-voltage 90%/80%, frequency pickup 95%.
  4. Engine start delay 3 s (0-10 s); retransfer delay 30 min (0-60 min).
  5. CTGD neutral-position delay default 5 s (0-10 min).
  6. Exerciser timer at 7, 14, 28 day intervals; event log of 16 records.
  7. NEMA 1: 610 x 457 x 279 mm at 31 kg for 40-200 A; 2286 x 902 x 1219 mm at 467-635 kg for 1600-3000 A.
  8. Seismic compliance IEEE 693-2005 and IBC-2003; add 15% to weights for packaging.

Using it in design

  • Select ATS current against generator and load current, and choose open or delayed transition for motor and transformer loads.
  • Set retransfer and cool-down delays consistently with the generator operating strategy.
  • Use NEMA 1 dimensions and weights in electrical room layout; allow 3 in extra depth and 3 in for lifting eyes.
  • On 2600 and 3000 A units check the side or rear ventilation clearance requirement.

Who should read it

Electrical designers selecting ATSs for generator and standby power systems.

Document contents

  1. Features
  2. Standard features and options
  3. Options: power measurement meters
  4. Testing standards and terminals
  5. MX150 control setting ranges
  6. NEMA 1 dimensional specifications
  7. Application notes

Publication details

Authors
Caterpillar
Publisher
Caterpillar
Year
Year not stated
Document number
LEXX0523-09
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No document-specific redistribution permission was established. Bibliographic reference only.

Citation

Caterpillar Cat CTG Series Automatic Transfer Switch LEXX0523-09, pp.1,5. Caterpillar. LEXX0523-09. https://s7d2.scene7.com/is/content/Caterpillar/LEXX0523-09

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.