On-site Power for Data Centers: New Possibilities in a Changing Marketplace
Caterpillar · Michael A. Devine, Brian Jabeck
A Caterpillar white paper (Michael A. Devine and Brian Jabeck, August 2015) surveying on-site generation choices for data centres beyond conventional diesel standby. The copy reached is hosted by a third-party data-centre project library, not cat.com.
On this page
Overview
The paper first contrasts paralleled and distributed (pod) generator architectures and their UPS ride-through implications. Distributed pods start without paralleling delay, so a flywheel UPS with 20-25 s ride-through can suffice, while paralleled systems usually use battery UPS for longer ride-through.
It then compares Tier 2 diesel, Tier 4 diesel, gas reciprocating engines and gas turbines on cost, efficiency, start and load acceptance, and permitted non-emergency hours. Stationary emergency (EPA Tier 2) diesels may run unlimited hours in emergencies but no more than 100 h per year for maintenance, testing and other non-emergency use. Diesels can be online and fully loaded within 10 s (NFPA 110) and accept a 100% block load.
Gas engines offer 40-44% electrical efficiency; units of 2.5 MW and larger may need up to 120 s to accept full load, while smaller 1,800 rpm units need about 60 s or less when ramp-loaded. Gas turbines start in 4-10 minutes and need combustor replacement after about 60,000 h. The paper also covers demand response, microgrids, CHP and business factors such as load characteristics and facility life.
Key points
- Distributed pod systems start without paralleling delay; flywheel UPS with 20-25 s ride-through can suffice.
- Paralleled systems usually rely on battery UPS for longer ride-through.
- EPA Tier 2 emergency diesels: unlimited emergency hours, at most 100 h/year for maintenance, testing and other non-emergency use.
- Diesels reach full load within 10 s (NFPA 110) and accept a 100% block load.
- Gas engines: 40-44% electrical efficiency; 2.5 MW and larger may need up to 120 s for full load, smaller 1,800 rpm units about 60 s or less.
- Gas turbines start in 4-10 minutes; combustor replacement after about 60,000 h.
- Summary table: Tier 2 diesel under 100 non-emergency h/yr; Tier 4 diesel and gas engines 100+ h; turbines continuous duty.
Using it in design
- Compare diesel Tier 2 emergency, diesel Tier 4, gas reciprocating engines and gas turbines, recording start time, full-load acceptance time and permitted non-emergency hours for each.
- If gas engines or turbines are chosen for standby, require UPS ride-through at least equal to their load-acceptance time.
- If demand-response participation is enabled with Tier 2 diesels, cap it at 100 h/yr.
- Compare paralleled-bus and distributed-pod architectures.
Who should read it
Data-centre energy planners and designers weighing non-diesel options and demand-response participation.
Related standards
- NFPA 110
- EPA 40 CFR 60 Subpart IIII
Publication details
- Authors
- Michael A. Devine; Brian Jabeck
- Publisher
- Caterpillar
- Year
- 2015
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Citation
Michael A. Devine; Brian Jabeck (2015). On-site Power for Data Centers: New Possibilities in a Changing Marketplace. Caterpillar. https://www.middletowndatacenter.com/library/files/Resources/CAT%2BOn-site-Power-for-Data-Centers_New-Possibilities-in-a-Changing-Marketplace.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.