Technical guideFree to readYear not stated

Enersafe UPS ESOL TRI PT technical brochure

Original title Enersafe UPS ESOL TRI PT technical brochure, 10-40kVA p.3 and60-100kVA p.4

Legrand

A six-page Spanish-language brochure from Enersafe, a Legrand group business, describing the ESOL TRI PT three-phase online double-conversion UPS family: six models from 10 kVA / 9 kW to 100 kVA / 90 kW at output power factor 0.9, with line-mode efficiency of 93.5-94.5% at 10-40 kVA and 96% at 60-100 kVA.

On this page

Overview

The brochure presents the three-phase (3:3) tower UPS series of the Enersafe brand for the Latin American market and states that models from 10 to 100 kVA are held in stock. The series is online double conversion, allows N+X redundant parallel operation and is managed through a 7-inch colour touch screen. ECO and EPO functions, generator compatibility, power management and safe shutdown software, a dry contact connection and a smart slot for an optional SNMP card are standard. Target sectors are telecom, data centre, medical equipment, servers, mining and security.

The 10-40 kVA table gives four models: 10 kVA / 9 kW, 20 / 18, 30 / 27 and 40 / 36. Input is 380/400/415 VAC (3Ph+N+PE), the line-mode voltage range is 208-478 VAC and input current distortion is at most 3% on a full linear load. These models have internal batteries: a ±120 VDC bus with 12 V 9 Ah blocks, 20 at 10 kVA, 40 at 20 kVA and 3 x 20 at 30 and 40 kVA. Autonomy at full load is 10, 4, 4 and 3 minutes; at 50% load it is 28, 10, 8 and 7 minutes. Net weights are 115, 171, 223 and 233 kg.

The 60 and 100 kVA table covers the 60 kVA / 54 kW and 100 kVA / 90 kW models. The line-mode voltage range is 208-485 VAC at half load and 305-485 V at full load; the frequency range is 40-70 Hz. Efficiency is 96% and output voltage distortion is at most 1% on linear load and 4% on non-linear load. The battery is external and configurable: ±180 V to ±240 VDC (30-40 blocks) with charge current up to 15 A. Net weight is 73 kg and 115 kg. The brochure also contains tables for 120-180 kVA models.

On all models overload capability is up to 110% for 60 minutes, up to 125% for 10 minutes and up to 150% for 1 minute; transfer time is 0 ms, output voltage regulation ±1% and crest factor 3:1. Operating conditions are 0-40 °C, 0-95% non-condensing humidity and altitude below 1500 m. Optional accessories are an SNMP card, the ESOL TRI PT battery bank and a three-phase bypass panel. Warranty is 3 years on the UPS and 2 years on batteries. The dimension row gives 828 x 250 x 868 mm for 10-40 kVA and 850 x 442 x 1100 mm for 60-100 kVA; the axis order is not stated.

Key points

  1. Models (kVA/kW): 10/9, 20/18, 30/27, 40/36, 60/54 and 100/90; output power factor 0.9; three-phase in, three-phase out.
  2. Input: 380/400/415 VAC (3Ph+N+PE); line-mode range 208-478 VAC at 10-40 kVA, and 208-485 VAC at half load and 305-485 V at full load at 60-100 kVA; THDi ≤ 3%.
  3. Line-mode efficiency: 93.5% and 94.5% at 10-40 kVA, 96% at 60-100 kVA.
  4. Autonomy of the 10-40 kVA models with internal batteries: 10, 4, 4 and 3 minutes at full load; 15, 5, 5 and 4 minutes at 70% load; 28, 10, 8 and 7 minutes at 50% load.
  5. Battery: ±120 VDC with 12 V 9 Ah blocks at 10-40 kVA; ±180 to ±240 VDC (30-40 blocks) with charge current up to 15 A at 60-100 kVA.
  6. Overload: 60 minutes at ≤ 110%, 10 minutes at ≤ 125%, 1 minute at ≤ 150%; transfer time 0 ms.
  7. Net weight: 115, 171, 223 and 233 kg for 10-40 kVA; 73 kg at 60 kVA and 115 kg at 100 kVA.
  8. Noise in the 55-60 dB range at 1 m; ambient 0-40 °C, 0-95% humidity, altitude < 1500 m.
  9. Standards: IEC/EN 62040-1, IEC/EN 60950-1, IEC/EN 62040-3 and the IEC 61000-4 series; warranty 3 years on the UPS, 2 years on batteries.

Using it in design

  • Take capacity from the kW column: with a 0.9 power factor, 90 kW of IT load fully loads the 100 kVA model, so plan a parallel unit for growth and N+1.
  • Full-load autonomy on the 20-40 kVA models with internal batteries is only 3-4 minutes; compare it with generator start time and add an external battery bank if it falls short.
  • Use 93.5-94.5% efficiency for 10-40 kVA and 96% for 60-100 kVA in the heat load; at 36 kW load the loss is about 2.1-2.5 kW.
  • On the 60-100 kVA models, size the battery string from the 30-40 block option and the 15 A charge-current limit.
  • Obtain a dimensioned drawing from the manufacturer for layout; the brochure does not give the axis order of the dimensions and does not state for 60-100 kVA whether weight includes batteries.
  • For sites above 1500 m (such as the Andean region), request derating factors from the manufacturer.

Who should read it

Electrical designers selecting a 10-100 kVA three-phase UPS and project and procurement teams comparing suppliers in the Latin American market.

Document contents

  1. Product introduction and features
  2. Identificación de partes
  3. Accesorios opcionales
  4. Especificaciones técnicas: ESOL TRI PT 10, 20, 30, 40 kVA
  5. Especificaciones técnicas: ESOL TRI PT 60, 100 kVA
  6. Especificaciones técnicas: ESOL TRI PT 120, 150, 160, 180 kVA

Publication details

Authors
Legrand
Publisher
Legrand
Year
Year not stated
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No document-specific redistribution permission was established. Bibliographic reference only.

Citation

Legrand Enersafe UPS ESOL TRI PT technical brochure, 10-40kVA p.3 and60-100kVA p.4. Legrand. https://enersafelatam.com/wp-content/uploads/2024/05/UPS-ESOL-TRI-PT_compressed.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.