Piller's announcement of 19 November 2019 introduces the UNIBLOCK UBT+ 2000, a battery-backed UPS that delivers 2 MW from a single module. It ships ready for VRLA and lithium-ion batteries, has an on-line efficiency of 97%, and can be paralleled up to 16 modules for 32 MW in one system.
On this page
Overview
The announcement covers the UBT+ 2000, a model added to Piller's UNIBLOCK range. The manufacturer positions it as the battery-backed UPS with the highest single-module rating, 2 MW. The unit arrives ready to work with either VRLA or lithium-ion batteries. The central claim is that power which other technologies build from several paralleled modules is concentrated in one unit, and Piller states that this lowers cost and raises reliability in large data centres.
Scalability is given in numbers: sixteen 2 MW units can be connected in parallel, taking a single system to a total of 32 MW. The text explains that the unit can be used in low-voltage architectures, in medium-voltage designs and in Piller's IP-bus (isolated parallel bus) systems. In the IP-bus arrangement, plain N+1 redundancy is said to be enough for Tier III and even Tier IV compliance.
Three operating characteristics stand out: 97% on-line efficiency, a reduced maintenance requirement owing to an internal layout free of capacitors and internal paralleling, and the ability to run at elevated ambient temperatures. The last point often removes the need for additional air conditioning in the UPS room. The text is a short press announcement; it carries no datasheet values such as dimensions, weight, input and output voltage, overload curve or temperature limit. Those values require the product's technical documentation.
Key points
- UNIBLOCK UBT+ 2000: a battery-backed UPS rated 2 MW (2000 kW) in a single module.
- Delivered ready for VRLA and lithium-ion batteries.
- Up to 16 units of 2 MW can be paralleled, for a total of up to 32 MW in one system.
- On-line efficiency is stated as 97%.
- Supports low-voltage, medium-voltage and IP-bus system designs; IP-bus targets Tier III and Tier IV compliance with N+1 redundancy.
- The capacitor-free layout without internal paralleling reduces maintenance, and the unit can operate at elevated temperatures.
- Piller was founded in Hamburg in 1909, is headquartered in Osterode am Harz and is a subsidiary of Langley Holdings plc.
Using it in design
- In multi-megawatt halls, count UPS blocks on the basis of a 2 MW module and compare switchgear, cabling and floor area with an option that builds the same power from smaller paralleled modules.
- Check single-system capacity against the limit of 16 modules and 32 MW; split larger campuses into several blocks.
- If an IP-bus architecture is chosen, demonstrate on the single-line diagram, with maintenance and fault scenarios, that N+1 redundancy meets the target Tier level.
- Use 97% on-line efficiency as the starting value in annual loss and PUE calculations, and confirm part-load efficiency from the manufacturer's datasheet.
- Size UPS room cooling with the unit's elevated-temperature capability in mind; take the permitted temperature limit and the battery type's requirement from the technical documentation.
Who should read it
Electrical designers choosing the UPS architecture for large data centres and technical managers making the investment decision.
Document contents
- World first 2 Megawatt single module lithium-ion UPS
- Battery backed UNIBLOCK™ UBT+ 2000 added to Piller range
- About Piller
Publication details
- Authors
- Piller
- Publisher
- Piller
- Year
- 2019
- Document language
- Unverified
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
No document-specific redistribution permission was established. Bibliographic reference only.
Citation
Piller (2019). Piller UNIBLOCK UBT+ 2000 product announcement, 19 November 2019. Piller. https://piller.com/world-first-2-megawatt-single-module-lithium-ion-ups
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.