Technical guideFree to read2025

Industrial Automatic Transfer Switch Fundamentals

Rehlko · Mike Little (Rehlko)

A Rehlko white paper (G26-60, 12/25) covering the function, transition modes, configurations, application segments and specification checkpoints of automatic transfer switches.

On this page

Overview

The short paper defines the main job of an ATS as detecting loss of utility power, transferring the load to an emergency source (usually a generator) and returning it to the primary source when utility power is restored. The main components are the transfer mechanism, the controller and the enclosure; the controller manages sensing, timing and transfer logic. As an example the manufacturer cites its own controllers with programmable settings, communication interfaces and load management.

Transition modes fall into three kinds. Open (standard) transition is break-before-make and suits non-critical loads. Delayed (programmed) transition leaves a customer-programmable centre-off pause of 1 second to 60 minutes between the two sources, which lets electromagnetic fields decay for large inductive loads. Closed transition parallels both sources for less than 100 ms to transfer without interrupting the load, and is preferred for mission-critical sites such as hospitals and data centres.

Configurations described are standard, bypass-isolation and service-entrance. A bypass-isolation unit combines automatic and manual switches so the transfer mechanism can be maintained without interrupting power; a service-entrance unit includes the utility disconnect and removes the need for an additional upstream overcurrent protective device. Applications are grouped in three segments: life safety (bypass-isolation, closed transition; NFPA 70 and NFPA 99), mission critical (data centres, telecom, finance; closed transition, standard or bypass-isolation, possibly three-source; supporting Tier III and IV concurrent maintainability and fault tolerance) and standard (offices, retail, manufacturing; open or delayed transition).

The specification section lists, beyond current, voltage and transition type, neutral switching (solid, switched, overlapping), withstand and close-on ratings (WCR), enclosure type, load management, communications (RS-485, Ethernet), seismic certification and accessories. Protection comparisons for NEMA Type 1, 3R, 4, 4X and 12 enclosures are given as indoor and outdoor tables. The paper is an introductory summary aimed at the manufacturer's own products; detailed coordination work needs other documents.

Key points

  1. An ATS works in three transition modes: open (break-before-make), delayed/programmed and closed (make-before-break).
  2. In delayed transition the centre-off pause is programmable from 1 second to 60 minutes and is used to let fields decay for large inductive loads.
  3. Closed transition parallels both sources for less than 100 ms and is typical for mission-critical sites such as hospitals and data centres.
  4. A bypass-isolation ATS allows maintenance of the transfer mechanism without interrupting the load; a service-entrance ATS includes the utility disconnect and removes the need for an extra upstream overcurrent device.
  5. For the mission-critical segment: closed-transition standard or bypass-isolation ATS, possibly three-source, supporting Tier III and IV concurrent maintainability and fault tolerance.
  6. Life safety applications typically use bypass-isolation with closed transition; all Rehlko ATSs are designed to UL 1008 and CSA C22.2 No. 178.
  7. Neutral switching options (solid, switched, overlapping) affect ground-fault protection and NEC compliance.
  8. WCR values set fault-current withstand and affect protective device selection and coordination.
  9. Enclosure options are NEMA Type 1, 3R, 4, 4X and 12; communication options are RS-485 and Ethernet.

Using it in design

  • For a data centre, evaluate a closed-transition ATS together with bypass-isolation; maintenance without load interruption matches the Tier III concurrent maintainability goal.
  • For large inductive loads (motors, transformers), program a delayed-transition pause instead of open transition and choose a value within 1 s to 60 min.
  • In the specification, state neutral switching type and WCR together with current and voltage; refer to the fault-current calculation for the WCR.
  • If a service-entrance ATS is chosen, verify separately the scope of the utility disconnect and upstream overcurrent protection.
  • Select the enclosure type by environment (Type 1 or 12 indoors; 3R, 4, 4X outdoors) and match communication protocols to the BMS.

Who should read it

Electrical engineers writing ATS specifications for data centres and critical facilities.

Document contents

  1. Introduction
  2. Function and key components
  3. Operational modes and functionalities
  4. Applications: life safety, mission critical, standard
  5. Specifications considerations
  6. Summary
  7. Conclusion

Related standards

  • UL 1008
  • CSA C22.2 No. 178
  • NFPA 70
  • NFPA 99
  • NFPA 110

Publication details

Authors
Mike Little (Rehlko)
Publisher
Rehlko
Year
2025
Document number
G26-60
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Vendor white paper; no open licence. Year from PDF metadata (Dec 2025).

Citation

Mike Little (Rehlko) (2025). Industrial Automatic Transfer Switch Fundamentals. Rehlko. G26-60. https://techcomm.rehlko.com/techcomm/pdf/Rehlko_G26-60_Industrial_Automatic_Transfer_Switch_Fundamentals_WP.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.