Comparing IEC 61850 vs. Traditional Monitoring, Protection and Control Solutions in Large Data Centers
Schneider Electric · Brice Martinot-Lagarde, Julien Moreau
Schneider Electric WP 285 (2021) compares a conventional PLC plus Modbus/TCP scheme with an IEC 61850 station-bus scheme for the same medium-voltage design.
On this page
Overview
The basis is Schneider reference design RD107: 4 data halls x 2.8 MW = 11.2 MW IT, 15 MVA total, two utility incomers in main-tie-main, centralized MV generators with 2 gensets per generator switchboard designed N+2. The closed-loop arrangement calls for differential and directional protection and automatic transfer logic. IEC 61850 replaces hardwired inter-trips and remote I/O with supervised GOOSE messages over a PRP/MRP redundant network, at the cost of more upfront engineering and validation.
GOOSE messages are fast (under 4 or 10 ms), self-monitored multicast. IEC 62439 PRP and HSR recover the network in under 1 ms with zero packet loss, which RSTP cannot meet; the study used PRP plus an MRP backbone ring. The Modbus/TCP alternative used an RSTP ring of 8 Ethernet switches with hardwired relay-to-PLC signals for blocking schemes. Hardwired inter-trip signals are not supervised, so wiring failures go unnoticed until a protection operation is needed, whereas GOOSE links raise an alarm on communication faults.
IEC 61850 reduces on-site work time 2-3x and the LV-section footprint of MV switchboards by 5%, while engineering studies and validation/FAT are about 30% higher. KPI scores (IEC 61850 versus Modbus/TCP): safety 0, CapEx subtotal 0, reliability +2, scalability +3, time to market +1, footprint +1, operation and maintenance +5, total +12. The authors limit applicability to large sites (10 MW IT or 15 MVA total or more), complex non-radial MV topologies, multi-site repeated designs, fast deployment, frequent evolution, or advanced functions such as microgrid, load shedding and load balancing. Related standards are IEC 61850, IEC 62439-3, IEC 62439-2 and IEEE 802.1D.
Key points
- RD107: 4 x 2.8 MW = 11.2 MW IT, 15 MVA, two main-tie-main incomers, 2 gensets per MV generator switchboard, N+2.
- GOOSE: under 4 or 10 ms, self-monitored multicast.
- PRP and HSR recover in under 1 ms with zero packet loss; RSTP cannot.
- Modbus/TCP alternative: 8-switch RSTP ring and hardwired signals.
- IEC 61850 cuts site work 2-3x and LV-section footprint 5%; engineering and validation/FAT about 30% higher.
- KPI total +12: reliability +2, scalability +3, operation and maintenance +5.
- Hardwired inter-trips are unsupervised; GOOSE alarms on communication faults.
- Applicability: 10 MW IT or 15 MVA and up, complex MV topology, repeated designs or functions like load shedding.
Using it in design
- Compare hardwired PLC/Modbus, IEC 61850 station-bus and IEC 61850 process-bus protection and control schemes for MV design.
- Suggest IEC 61850 when IT load is 10 MW or more or the facility 15 MVA or more with MV-centralized generation or closed-loop or daisy-chain MV topology.
- When IEC 61850 is chosen, require PRP or HSR (IEC 62439-3) for the protection network and flag RSTP as non-compliant for GOOSE inter-tripping.
- Add an SCD-file baseline and pre-FAT simulation to the commissioning checklist, and assume about 30% more engineering/FAT but 2-3x shorter site work in schedules.
Who should read it
Electrical designers and commissioning engineers choosing the MV protection and control architecture of large data centres.
Related standards
- IEC 61850
- IEC 62439-3
- IEEE 802.1D (RSTP)
- IEC 62439-2 (MRP)
Publication details
- Authors
- Brice Martinot-Lagarde; Julien Moreau
- Publisher
- Schneider Electric
- Year
- 2021
- Document number
- WP 285
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Citation
Brice Martinot-Lagarde; Julien Moreau (2021). Comparing IEC 61850 vs. Traditional Monitoring, Protection and Control Solutions in Large Data Centers. Schneider Electric. WP 285. https://download.schneider-electric.com/files?p_Doc_Ref=SPD_WP285_EN
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.