How to Reduce the Risks of Arc Flash Incidents in the Data Center
Starline / Legrand
A Starline / Legrand white paper on improving data-centre safety through busway architecture, overcurrent protection devices (OCPDs) and arc flash hazard studies (cover 01/20, originally published 04/18).
On this page
Overview
The white paper defines an arc flash as a high-amperage fault current jumping through air between conductors or to ground. It states that temperatures can exceed 19,400 C (35,000 F) and that the arc blast throws molten metal and plasma. Triggers include a test probe touching a live surface, a dropped tool, sparks across insulation gaps, dust or corrosion on a conductor and improper installation. The OSHA general duty clause is cited. It proposes four methods: busway-based distribution, OCPDs, an arc flash hazard study and correct PPE.
The power distribution section compares the 208 V AC three-phase baseline, stepped down from 480 V by a PDU transformer, with the more efficient 415 V AC three-phase architecture. At 240 V distribution, server efficiency is 91 percent at 50 percent load. Higher voltage brings higher incident energy and fault-current risk, so extra measures are needed. In legacy panel systems, adding or replacing a breaker in an RPP usually means live work with a high arc flash risk; a busway system removes the exposed power panel and reduces live work through plug-in units.
The OCPD section compares fuses and circuit breakers: a fuse can clear a fault in about a tenth of a second and a breaker in about one second, so a fuse is about three times faster. Selective coordination lets the downstream fuse closest to the fault open first; fuses can be placed in busway end feeds, plug-in units and in-cabinet PDU strips.
An arc flash hazard study is recommended at least every two years or when major electrical equipment is added or removed. Steps are data collection, electrical system modelling, short-circuit current and OCPD comparison, and a results report giving arc flash boundaries, incident energy (cal/cm2) and the corresponding PPE. The NFPA 70E table gives separate PPE for 1.2 to 12 cal/cm2 and above 12 cal/cm2. The last section covers UL 857 conditions for inserting plug-in units on an energized busway and NFPA 70E work rules. It is a vendor white paper; installation and work practices require an independent, project-specific safety assessment.
Key points
- Arc flash temperatures can exceed 19,400 C (35,000 F); the arc blast throws molten metal and plasma.
- Four methods: busway architecture, OCPDs, arc flash hazard study, correct PPE.
- A fuse clears a fault in about 0.1 s and a circuit breaker in about 1 s; the fuse is about three times faster.
- In the 415 V AC three-phase architecture, 240 V distribution gives 91 percent server efficiency at 50 percent load; higher voltage means higher incident energy.
- In legacy RPP panels, adding or replacing a breaker usually requires live work; busway removes the exposed panel.
- Selective coordination places fuses in stages at the end feed, plug-in unit and in-cabinet PDU strip.
- An arc flash study is recommended at least every two years and after major equipment changes.
- The NFPA 70E table sets separate PPE for 1.2-12 cal/cm2 and above 12 cal/cm2.
- UL 857: for live insertion of a plug-in unit, no load, breaker or fused disconnect OFF and a qualified installer.
Using it in design
- In row distribution, compare busway with RPP panels for arc flash and count the steps that need live work.
- Design fuse stages for busway end feed, plug-in units and in-cabinet PDU with selective coordination.
- At higher distribution voltage (415/240 V), quantify the effect on incident energy with an arc flash study and put it into work instructions.
- Put the arc flash study into the operations plan, renewed every two years and after equipment changes.
- Write plug-in unit operations on busway to UL 857 conditions, and still obtain an independent project-specific safety assessment.
Who should read it
Data-centre electrical distribution designers, and operations and safety managers.
Document contents
- Abstract
- Introduction
- Power distribution in the data center
- Legacy systems versus electrical busways
- OCPD fuses versus circuit breakers
- Selective coordination
- Performing an arc flash hazard study
- NFPA 70E
- UL 857 standards for insertion of plug-in units on an energized busway
- Safety procedures for busway installation
Publication details
- Authors
- Starline / Legrand
- Publisher
- Starline / Legrand
- Year
- 2020
- Document number
- F0900037
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Publisher source opened. No document-specific commercial redistribution permission established; link and original metadata only.
Citation
Starline / Legrand (2020). How to Reduce the Risks of Arc Flash Incidents in the Data Center. Starline / Legrand. F0900037. https://starlinepower.com/sites/default/files/files/DPC-BUS-WP-Arc-Flash-White-Paper-US-033123.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.