Tescom's June 2024 DX3000 manual: 100-250 kVA, output power factor 0.9, IGBT rectifier, input THDi at most 3%, efficiency up to 96%, up to 8 units in parallel and detailed N+1 redundant operation.

On this page

Overview

The manual describes Tescom's DX3000 series DSP-controlled UPS with three-phase input and output (models DX3100, 3120, 3150, 3160, 3200 and 3250). The introduction gives safety conformity and the CE mark, the design logic (IGBT rectifier, inverter, static transfer switch, mechanical maintenance bypass switch, optional automatic battery circuit breaker) and the operating modes: normal (online), battery and bypass. A critical load fed from the bypass or maintenance bypass line is unprotected against mains changes.

The installation section covers unpacking, site choice, safety earth, cable connection, connection terminals and battery commissioning. The front panel section explains the menus (measurements, alarm, information, preferences, commands, date and time, service, settings), status codes and fault messages. Operating instructions describe starting and stopping a single UPS and moving to maintenance bypass; the parallel section details the PARALLEL, REDUNDANT and N+1 REDUNDANT configurations. The maintenance section gives daily, weekly and annual checks.

The specification table covers models from 100 kVA/90 kW to 250 kVA/225 kW: input 220/380, 230/400 or 240/415 Vac, input voltage tolerance +/-20% at 100% load (+40% at 70% load), input power factor 0.99 or above, input current THD at most 3%, efficiency 95.5% up to 96% at 100% load, output THD under 2%, overload 10 minutes at 125% and 1 minute at 150%, internal battery of 60 x 12 V (30+30), end-of-discharge voltage 300 V DC.

This is a product user manual and holds no selection or comparison for design decisions, but being in Turkish and giving mains, battery, parallel operation and environment values in one table it is a practical reference for field and project work.

Key points

  1. Models: DX3100 100 kVA/90 kW, DX3120 120/108, DX3150 150/135, DX3160 160/144, DX3200 200/180, DX3250 250/225 kW; output power factor 0.9.
  2. Input: 3 phase + neutral, 220/380, 230/400 or 240/415 Vac; tolerance +/-20% (at 100% load) and +40% (at 70% load); input power factor 0.99 or above; input current THD at most 3%; 50 Hz +/-5%.
  3. Output: voltage tolerance 1%, frequency tolerance 2% synchronised and 0.2% on battery, THD under 2% (linear load), crest factor 3:1.
  4. Efficiency up to 95.5% at 100% load (up to 96% on some models).
  5. Overload: 10 minutes at 125% load, 1 minute at 150% load.
  6. Parallel operation up to 8 UPS; PARALLEL, REDUNDANT and N+1 REDUNDANT configurations exist.
  7. Battery: 60 x 12 V (30+30 in two strings), float voltage 405 V DC (25 degrees C), end of discharge 300 V DC; automatic and manual battery test, boost charge.
  8. Environment: 0-40 degrees C, humidity at most 90% (non-condensing), noise under 68 dB; dimensions 475 x 890 x 1440 mm; Class 1 and IP20; weight without batteries about 210-270 kg.
  9. Communication: 2 x RS232 standard; RS485, SNMP, Modbus and remote monitoring panel optional; 4 dry-contact relays (8 optional), emergency stop input standard.

Using it in design

  • With a power factor of 0.9, take the 100 kVA model as 90 kW active power in the load list and generator calculation.
  • Use input THD of 3% or less and power factor of 0.99 or above in generator and transformer sizing; compare the +40% tolerance at 70% load with mains conditions.
  • For N+1 redundancy write the parallel structure of up to 8 units and the difference between PARALLEL, REDUNDANT and N+1 REDUNDANT modes into the specification.
  • Size the battery room with 60 x 12 V internal batteries, 405 V DC float and 300 V DC end-of-discharge; if an external battery system is needed, check DC bus compatibility.
  • State in the operating procedure that the load is unprotected when fed through bypass or maintenance bypass; perform the maintenance bypass transfer in the order given in the operating instructions.
  • Carry the ambient limit (0-40 degrees C), humidity (up to 90%) and noise (under 68 dB) into electrical room ventilation and acoustic design.

Who should read it

Turkish electrical engineers, field service technicians and operations staff who install, run or specify 100-250 kVA UPS.

Document contents

  1. Introduction (safety conformity and CE, design logic, operating modes, technical specifications)
  2. Installing the UPS (unpacking and checks, site choice, electrical connection, battery commissioning)
  3. Front panel (menus, alarm and warning messages, status codes, fault messages)
  4. Operating instructions
  5. Parallel operation (PARALLEL, REDUNDANT, N+1 REDUNDANT)
  6. Maintenance (planned maintenance, daily, weekly, annual checks)

Publication details

Authors
Tescom Elektronik
Publisher
Tescom Elektronik
Year
2024
Document number
AGKK13622 / 06/2024
Document language
Turkish
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Üreticinin herkese açık kaynağı okundu. Açık erişim yeniden dağıtım izni değildir; tam metin kütüphaneye alınmaz. Tescom resmî doküman dizini tescomakademi.com bağlantısını yayımlar. Son sayfada 06/2024 tarihi vardır. Güvenlik girişindeki ES300D model adı tutarsızlığı nedeniyle o bölümden model iddiası alınmadı.

Citation

Tescom Elektronik (2024). DX3000 Serisi DSP KGK 100–250 kVA: Kullanıcı El Kitabı. Tescom Elektronik. AGKK13622 / 06/2024. https://tescomakademi.com/doc/AGKK13622.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.