Üniversitelere Yönelik Yeni Bir Veri Merkezi Tasarımı ve Uygulaması (A New Data Centre Design and Implementation for Universities)

Original title Üniversitelere Yönelik Yeni Bir Veri Merkezi Tasarımı ve Uygulaması

Bilecik Şeyh Edebali Üniversitesi, Fen Bilimleri Enstitüsü · Arif Günel

Arif Günel's 2014 master's thesis at the Bilecik Şeyh Edebali University Institute of Science (YÖK thesis no. 364025) documents the design and construction of the university's campus data centre: 16 hosting and 10 network racks, two 40 kVA UPSs, a 250 kVA generator, N+1 in-row cooling, and hot-aisle versus cold-aisle containment compared by CFD.

On this page

Overview

The thesis is a 94-page open-access work prepared in the Department of Computer Engineering under the supervision of Assoc. Prof. Uğur Yüzgeç. Chapter two reviews data centre types, the Uptime Institute Tier certificates, the Green Grid metrics PUE and DCiE, and the planning stages (architecture, electrical, cooling, security). Chapter three describes, discipline by discipline, the design and implementation of the data centre of the IT department of Bilecik Şeyh Edebali University (BŞEÜ). Before design began, data centres in Eskişehir, Kütahya, Istanbul, Ankara and Sakarya were visited.

In the architectural part the facility sits in a basement, bounded on three sides by structural concrete. The four areas of the first design were reduced to three during construction: the hosting room was enlarged, the energy room was separated because of its risk, and a NOC room was added for testing. The electrical design covers a dedicated medium-voltage kiosk, a 250 kVA generator, two 40 kVA UPSs on the A and B lines and two redundant lines to every rack. The network room holds 10 racks; the hosting room holds 2 network racks of 800 x 1200 mm and 14 server racks of 600 x 1200 mm, all 47U and fixed to individual stands against earthquakes.

Cooling is a precision system with free cooling: two chillers, one duty and one standby, and six in-row units. The hosting room runs three duty units and one standby, the network room one duty and one standby; the thesis gives each unit's capacity as 36 kVA. Hot-aisle and cold-aisle containment were compared by CFD for day-one and final-day loads. At day-one load cold-aisle containment was the more efficient; at higher load cold-aisle containment was more efficient on the network side and hot-aisle containment on the hosting side.

On the safety side, HFC-227ea gas suppression is installed in the hosting, network and UPS and switchboard rooms and operates in three zones (ceiling void, raised-floor void and main space) with cross-zoned detectors. A laser-based aspirating very early smoke detection system with four alarm thresholds is added. Environmental monitoring tracks temperature, humidity, liquid, motion and smoke over the web and sends alarms by email and SMS. The conclusions state that electrical and cooling systems can be maintained without interruption and offer advice to practitioners. The thesis contains no measured PUE or operating data, and its values are specific to this project.

Key points

  1. The facility has three areas: energy room, network room and hosting room, plus a NOC room for testing.
  2. Hosting room: 14 server racks of 600 x 1200 mm and 2 network racks of 800 x 1200 mm, all 47U. Network room: 10 racks (4 for building cabling, 6 for fibre and network equipment).
  3. Electrical: dedicated medium-voltage kiosk, 250 kVA generator, two 40 kVA UPSs on the A and B lines, two redundant lines to each rack; earth resistance below 2 ohms.
  4. Cooling: 2 chillers (1 duty, 1 standby, 160 kVA) and 6 in-row units; 3 duty plus 1 standby (N+1) in the hosting room and 1 duty plus 1 standby in the network room. The indoor units total 144 kVA of cooling.
  5. Design condition: 24 °C ± 1 °C on the hot-air discharge side and in the UPS room, with relative humidity of 45% to 55%.
  6. CFD day-one scenario: 40 kW total server load, an average of 0.75 kW per network rack and 2 kW per hosting rack; intake air at every rack below 25 °C.
  7. CFD final-day scenario: 2.5 kW per network rack and 5 kW per hosting rack with hot-aisle containment (25.6 kW and 85 kW in total); 2.4 kW and 4 kW with cold-aisle containment (24 kW and 64.5 kW in total).
  8. Fire: HFC-227ea gas suppression works with cross-zoned detection in three zones, and room tightness was confirmed by test. The aspirating smoke detection has four programmable alarm thresholds.
  9. Cabling: 48-core fibre between NA1 and NB1, 24-core between NA1 and SA1 and between NB1 and SB1; copper cabling is S/FTP.
  10. Recommendation: the generator load tests at 25%, 50%, 75%, 100% and 110% can be carried out on site with a portable load bank once installation is complete.

Using it in design

  • Assess the containment type by CFD separately for day-one and final-day loads; in the thesis the most efficient option changed with load and room.
  • Run the CFD analysis as soon as capacity is known and before the floor area is fixed; the thesis recommends this explicitly for sizing the space correctly.
  • With in-row cooling, plan at least one standby unit per room (N+1) and two separate mechanical lines to each unit; check the duty and standby chiller arrangement against the total indoor unit capacity.
  • Separate the energy room from the white space and write the gas suppression zones (ceiling void, floor void, main space) into the specification together with a room integrity test.
  • In seismic regions, transfer rack load to an individual steel stand per rack and not to the raised floor.
  • Add a stepped on-site load bank test for the generator to the commissioning plan.

Who should read it

IT managers running small and medium data centre projects at universities and public bodies, engineers writing specifications, and graduate students working on the subject.

Document contents

  1. 1. Giriş (Introduction)
  2. 2. Veri Merkezi (The data centre)
  3. 2.1 Veri Merkezi Nedir? (What is a data centre?)
  4. 2.2 Veri Merkezi Türleri (Data centre types)
  5. 2.3 Veri Merkezi Standartlarını Belirleyen Kuruluşlar (Standards bodies)
  6. 2.4 Veri Merkezi Planlama Aşamaları (Planning stages)
  7. 3. Bir Veri Merkezi Projesi (A data centre project)
  8. 3.1 Mimari Planlama (Architectural planning)
  9. 3.2 Elektrik Projesi (Electrical design)
  10. 3.3 İklimlendirme Projesi (Cooling design)
  11. 3.4 Kabin Yerleşimi (Rack layout)
  12. 3.5 Otomatik Yangın Algılama ve Söndürme Sistemi (Automatic fire detection and suppression)
  13. 3.6 Ortam İzleme (Environmental monitoring)
  14. 3.7 Kartlı Geçiş Kontrol Sistemleri (Card access control)
  15. 3.8 Data Kablolama (Data cabling)
  16. 3.9 Veri Merkezi Otomasyon Yönetim Sistemi (Automation and management system)
  17. 4. Sonuçlar ve Öneriler (Conclusions and recommendations)

Publication details

Authors
Arif Günel
Publisher
Bilecik Şeyh Edebali Üniversitesi, Fen Bilimleri Enstitüsü
Year
2014
Document number
Yüksek lisans tezi; YÖK Tez No. 364025; BŞEÜ Ref. 10038962
Document language
Turkish
Source type
Scientific
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Tam metin yayıncının veya üniversitenin açık kaynağından okundu. Açık erişim, ticari yeniden dağıtım izni olarak yorumlanmadı; yalnızca bağlantı, metadata ve özgün kısa özet tutulur. Üniversite kaydı dc.rights=openAccess ve dc.identifier.yoktezid=364025 gösterir. YÖK portalında doğrudan tam metin doğrulaması yapılamadı; tam metin üniversitenin resmi deposundan okundu. Site altbilgisindeki CC işareti tez için ayrıca ticari izin sayılmadı.

Citation

Arif Günel (2014). Üniversitelere Yönelik Yeni Bir Veri Merkezi Tasarımı ve Uygulaması. Bilecik Şeyh Edebali Üniversitesi, Fen Bilimleri Enstitüsü. Yüksek lisans tezi; YÖK Tez No. 364025; BŞEÜ Ref. 10038962. https://acikkaynak.bilecik.edu.tr/items/74e86cfa-b317-47e2-9fb4-23e360560667/full

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.