Turkcell 2025 Integrated Annual Report and TSRS-Compliant Sustainability Report
Original title Turkcell 2025 Entegre Faaliyet Raporu ve TSRS Uyumlu Sürdürülebilirlik Raporu
Turkcell
Turkcell's 2025 integrated report covers 54 MW of installed capacity in 4 data centres, a design PUE of 1.3, 277,990 m³ of water withdrawal and reverse osmosis wastewater recovery.
On this page
Overview
The report presents Turkcell's financial, operational and sustainability performance in an integrated way and includes the TSRS-compliant sustainability report as an annex. According to the data centre section, the company's 4 new-generation data centres have 32 thousand m² of white space, 54 MW installed and 50 MW active IT capacity, at Ankara-Temelli, Kocaeli-Gebze, Izmir-Torbali and Tekirdag-Corlu. Data centre and cloud services serve more than 4 thousand corporate customers.
On energy efficiency, PUE is tracked as a key performance indicator. The company keeps PUE below 1.55, cited as the European average, sets a design PUE of 1.3 and aims to stay below it in operation. Electricity for the data centres comes from self-generation and YEK-G certified renewable supply, and heat recovery applications are mentioned.
On water, the report gives group-wide 2025 total water withdrawal of 277,990.17 m³ and total consumption of 13,769.73 m³, mostly staff mains water use. To improve WUE, water consumption points in data centres are defined, metering infrastructure is installed, and wastewater is reused in cooling processes. Reverse osmosis systems at Izmir and Gebze recover 60% of wastewater, and at Ankara the reject ratio fell from 40% to 16%.
The report also covers the Google Cloud collaboration announced on 12 November 2025 for a hyperscale cloud region of about USD 3 billion (first modules 2028-2029) and localisation rates (Gebze and Torbali 50%, Temelli 65%, Corlu 75%). Because most of the document concerns telecommunications operations, the data centre and water figures are at corporate-report scale and no facility-level WUE value is given.
Key points
- 4 new-generation data centres: 32 thousand m² white space, 54 MW installed and 50 MW active IT capacity.
- Design PUE is 1.3; operation is kept below 1.55, cited as the European average.
- The sustainable finance framework counts data centres meeting PUE ≤ 1.3 as an eligible category.
- Group 2025 total water withdrawal 277,990.17 m³, total consumption 13,769.73 m³.
- Reverse osmosis systems at Izmir and Gebze recover 60% of wastewater.
- At Ankara the reverse osmosis reject ratio fell from 40% to 16%.
- Data centre water consumption points are being defined, metered and wastewater is reused in cooling.
- Rainwater is filtered and reused as grey water; smart water meters with remote reading and submetering are applied.
- Google Cloud hyperscale region of about USD 3 billion, first modules targeted for 2028-2029.
Using it in design
- Take a design PUE of 1.3 as a reference for corporate data centres in Turkey, also usable as a finance eligibility threshold.
- Define water consumption points in design and build the metering (main and submeters) from the start to support WUE calculation.
- Monitor reject ratio on reverse osmosis units and design recovered water to be reused in the cooling process.
- Include rainwater harvesting and grey water in new building and capacity expansion design.
- Reflect local equipment share (50-75%) in specifications alongside supply and maintainability criteria.
Who should read it
Engineers designing and operating data centres in Turkey, and managers working on sustainability reporting and green finance.
Document contents
- Management Messages
- Turkcell at a Glance
- Value Creation
- Data Centers
- Environment: Energy Efficiency and Water Management
- Efficient Use of Water
- Financial Capital and Green Finance
- TSRS-Compliant Sustainability Report
- Appendices
Publication details
- Authors
- Turkcell
- Publisher
- Turkcell
- Year
- 2026
- Document language
- Turkish
- Source type
- Industry body
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Official Turkcell reporting index links this publisher-controlled CDN PDF; full PDF downloaded and the cited pages inspected. A smaller KGK-hosted copy was used only for discovery/cross-checking. No redistribution permission established.
Citation
Turkcell (2026). Turkcell 2025 Entegre Faaliyet Raporu ve TSRS Uyumlu Sürdürülebilirlik Raporu. Turkcell. https://ffo3gv1cf3ir.merlincdn.net/SiteAssets/Hakkimizda/en/corporate-social/turkcell-efr-2025-tr-final.pdf?20261112_03-105019=
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.
