Uptime Institute's May 2025 survey (519 owner/operators): 32% of operators host AI inference today and 45% plan to; 46% of inference runs in on-premises central sites and 34% in colocation.
On this page
Overview
Uptime Institute's AI infrastructure survey, run between 21 January and 24 February 2025, gathered responses from 1,062 industry participants; the report rests on the results of 519 data centre owners and operators. The document is a four-page graphical summary: where AI inference and training are hosted, what drives location choice, whether existing systems have been upgraded, and increases in capacity demand.
In the inference hosting section, 32% of operators host inference applications today, 45% do not yet but plan to, and 23% have no plans (n=340). The largest share of inference is hosted in on-premises central data centres (46%); colocation is 34%, public cloud 14%, on-premises edge facilities 3% and end-user devices 2%. The top location factor is the ability to use existing infrastructure (50%), followed by data sovereignty (46%), power availability (37%), and overall cost (30%).
The main reasons for on-premises hosting are privacy and security (68%), performance (40%) and access to existing data and applications (38%). About half of operators hosting AI workloads are upgrading their systems: 52% power distribution and 51% cooling systems (n=71 each). Among project rationales, improving operational efficiency (55%) and creating new products and services (49%) lead.
The survey also presents capacity demand and rack density distributions in charts, but the document is a short summary; it contains no method detail, sample breakdown or commentary, and chart values should be read with care since sample sizes are small (n=35 to 75). It is an industry indicator that can be used to calibrate retrofit versus new-build assumptions.
Key points
- 32% of operators host AI inference today; 45% plan to; 23% have no plans (n=340).
- Primary inference hosting: on-premises central 46%, colocation 34%, public cloud 14%, edge 3%, end-user devices 2%.
- Inference location factors: existing infrastructure 50%, data sovereignty 46%, power availability 37%, overall cost 30%.
- Reasons for on-premises hosting: privacy and security 68%, performance 40%, access to existing data and applications 38%.
- Of operators hosting AI, 52% are upgrading power distribution and 51% cooling systems.
- Project rationales: operational efficiency 55%, new products and services 49%, customer experience 41%, employee productivity 28%.
- The survey ran from 21 January 2025 to 24 February 2025; 519 of 1,062 respondents were data centre owners and operators.
- 31% of respondents are from colocation or multi-tenant data centres.
Using it in design
- For retrofit versus new-build decisions on AI inference, make reusability of existing infrastructure (the top location factor) and power availability first screening criteria.
- In existing halls, plan power distribution and cooling upgrades together; in the survey the two are upgraded at similar rates.
- For customers with data sovereignty and privacy requirements, include on-premises or local colocation capacity in scaling assumptions.
- Use the survey data as an industry trend; validate your own demand forecast project by project.
Who should read it
Data centre owners, operators, colocation providers and investment decision makers planning capacity and location for AI workloads.
Document contents
- Summary: inference hosting, location factors and upgrades
- Inference hosting location and location factors
- Reasons for on-premises hosting
- System upgrades for AI and project rationales
- Capacity demand increases and rack density
- Respondent demographics
Publication details
- Authors
- Uptime Institute
- Publisher
- Uptime Institute
- Year
- 2025
- Document language
- English
- Source type
- Industry body
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Uptime Institute survey summary (copy hosted by NEXTDC); proprietary.
Citation
Uptime Institute (2025). Uptime Institute AI Infrastructure Survey 2025. Uptime Institute. https://www.nextdc.com/hubfs/Uptime%20Institute%20AI%20Infrastructure%20Survey%202025.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.