Capacity Middle East x Datacloud Middle East
About the event
Joint Capacity Middle East and Datacloud Middle East event in Dubai covering telecoms, connectivity and data centre infrastructure in the region, aimed at carriers, data centre operators and investors.
Venue
This event has ended. The page is kept in the archive with its details and related technical reading.
Read before you go
Explore the libraryBryden Wood 2026
Densification and the geometry of change: designing data centres in an age of uncertainty
Warn when high-density liquid-cooled racks are placed on upper floors without a matching structural floor-load rating.
- Delivery takes three to five years, so a 30 kW/rack design may need to carry twice that at go-live.
Vertiv 2022
Develop Future-Ready Data Centers With Disruptive Technologies
In a retrofit workflow identify zones above about 30 kW/rack and propose rear-door heat exchanger or direct liquid cooling options.
- Gartner expects specialty cooling to cut operating costs 20-40% by 2025.
Huawei Digital Power 2025
Huawei AI Data Center Reference Design
Import RD 01-21 as parametric AI-hall templates (rack kW, racks per module, module kW, redundancy of fan walls/TMUs/towers, generator and transformer counts) and as golden test cases for capacity math.
- Power distribution supports 2N, DR and BR architectures.
SoSo CAD
Compare the cost of design decisions
Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.
Request a demo