Overview

This book is Book 3 of the Datacom Series prepared by ASHRAE TC 9.9 (product code 90445). Its second edition dates from 2009 and runs to 222 pages. It covers the basic design of datacom centres and is regarded as one of the early reference sources for cooling design. This page rests on the ASHRAE catalogue and handbook descriptions rather than on the book itself.

The first part deals with design criteria: temperature, rate of temperature change, relative humidity, dew point and filtration. It also covers HVAC load, air and liquid cooling for the computer room, and air distribution. This gives a flow from the assumptions behind cooling design to the distribution solution.

Part II covers ancillary spaces and related topics: battery plants and generator rooms, contamination, acoustic noise, structural and seismic design, fire detection and suppression, commissioning, availability and redundancy. This scope shows that the book is not only a cooling guide but brings the building disciplines together.

As a limitation, the book dates from 2009, and recommended temperature ranges and cooling practices have since been updated through other ASHRAE publications.

Key points

  1. Datacom Series Book 3, product code 90445.
  2. 2nd edition, dated 2009, 222 pages.
  3. Design criteria: temperature, rate of change, relative humidity, dew point and filtration.
  4. Covers HVAC load, air and liquid cooling, and air distribution.
  5. Part II covers ancillary spaces: battery plants and generator rooms.
  6. Includes contamination, acoustic noise, and structural and seismic design.
  7. Also covers fire detection and suppression, commissioning, availability and redundancy.

Using it in design

  • Use as a general reference for the HVAC design-basis checklist: criteria, loads, distribution.
  • Add the cooling and ventilation needs of ancillary spaces such as battery and generator rooms to the checklist.
  • Read the 2009 content alongside current ASHRAE temperature and humidity recommendations.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Check cooling capacity alongside your design

Review zone heat loads, available capacity and the capacity balance after the largest unit is lost in SoSo CAD.

Request a demo
Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Who should read it

Data centre HVAC designers and engineers establishing a cooling design basis.

Publication details

Authors
ASHRAE TC 9.9
Publisher
ASHRAE
Year
2009
Document number
Datacom Series Book 3 (product 90445)
Document language
English
Source type
Standard
Access
Citation only
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document
Original licence note

Copyrighted ASHRAE book sold via ASHRAE Bookstore (and TC 9.9 Datacom Encyclopedia subscription). Not read; metadata from ASHRAE catalogue / Handbook descriptions only. Citation only.

Citation

ASHRAE TC 9.9 (2009). Design Considerations for Datacom Equipment Centers, 2nd ed. (ASHRAE Datacom Series Book 3). ASHRAE. Datacom Series Book 3 (product 90445). https://iifiir.org/en/fridoc/design-considerations-for-datacom-equipment-centers-4007

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.