Technical guideFree to read2018

Designing power systems for co-location data centers

Consulting-Specifying Engineer · Brian P. Martin

Brian P. Martin's article working through the electrical design decisions of a speculative colocation facility: MV topology, generators, UPS, PDUs, metering and redundancy architectures.

On this page

Overview

In this 2018 article in Consulting-Specifying Engineer, Brian P. Martin works through the electrical design decisions for a speculative colocation facility. Topics include project economics, SLA metrics, unknown tenant IT loads, MV topology, generator rating, UPS and PDU trends, metering and redundancy architectures. The article asks how a facility with no known tenants should plan its capacity. Each decision is discussed in terms of cost, flexibility and risk.

The author contrasts loop and radial-with-tie MV systems on the medium-voltage side and distributed-redundant and catcher (reserve) UPS schemes on the redundancy side. He also covers concurrently maintainable versus fault-tolerant definitions and warns against loose Tier language: 'Tier 3 compatible' has no technical definition. Numerical examples include battery runtime shrinking from 10-15 min to 2-5 min, UPS typically operating at 40-66% load, PDU sizes growing from 225/300 kVA to 600 kVA or larger, and a distributed redundant 4+1 example running each unit at 80% when fully loaded.

The article also gives a phased substation example: 66 MVA final load as three 33 MVA transformers in 2+1, and 10 MVA on day one as two 12 MVA in 1+1. On arc flash, it notes that the highest incident energy is commonly at secondary transformers and the line side of secondary switchgear; mitigations are transformer differential, HRG, optical sensors and primary breakers/VFIs. Finally it advises sizing to peak rather than average PUE (typical PUE 1.1-1.8). As a limit, this is a trade-press article, not a standard, and rests on the author's experience.

Key points

  1. Battery runtime has shrunk from 10-15 min to 2-5 min; unity power-factor UPS ratings are common; UPS typically operates at 40-66% load.
  2. PDU sizes have grown from 225/300 kVA to 600 kVA or larger.
  3. Distributed redundant 4+1 runs each unit at 80% when fully loaded; catcher systems range from 2+1 to 6+1 or higher and expand more easily.
  4. Phased substation example: 66 MVA final load as three 33 MVA transformers in 2+1; 10 MVA day one as two 12 MVA in 1+1.
  5. Highest incident energy is commonly at secondary transformers and the line side of secondary switchgear; mitigate with transformer differential, HRG, optical sensors and primary breakers/VFIs.
  6. Size systems to peak PUE, not average; typical PUE 1.1-1.8; 'Tier 3 compatible' has no technical definition.

Using it in design

  • Support both distributed-redundant and catcher/reserve UPS topologies with automatic post-failure load checks, warning if any unit exceeds 100% after a single failure.
  • Size mechanical-electrical capacity on peak PUE.
  • Avoid the label 'Tier compatible' in generated reports; state concurrently maintainable or fault tolerant explicitly instead.
  • Plan the substation in modular arrangements such as 2+1 for phased growth.
  • Include arc-flash mitigation measures for the secondary transformer side in the design.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Review your power design in SoSo CAD

Inspect supply paths, equipment loads and UPS failure scenarios in one model.

Request a demo
Single-line diagram in the SoSo CAD power and capacity workspace

Who should read it

Electrical designers, operators and investors of colocation data centres.

Related standards

  • NFPA 70
  • NFPA 70E
  • NFPA 110
  • TIA-942
  • ASHRAE 90.4
  • IEEE C37.20.4-2013
  • The Green Grid WP #49

Publication details

Authors
Brian P. Martin
Publisher
Consulting-Specifying Engineer
Year
2018
Document language
English
Source type
Expert / community
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document

Citation

Brian P. Martin (2018). Designing power systems for co-location data centers. Consulting-Specifying Engineer. https://www.csemag.com/articles/designing-power-systems-for-co-location-data-centers/

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.