Totally Integrated Power - Planning of Electric Power Distribution: Technical Principles
Siemens
Volume 1 of Siemens' general planning manual for building and infrastructure power distribution; data centres get dedicated treatment in the demand-estimation and availability chapters.
On this page
Overview
The manual is not a data-centre-only document. It covers demand estimation, MV network concepts, supply quality and EMC, availability and redundancy, reactive power, protection coordination and selectivity, switchgear, transformers, busbar trunking, UPS and embedded generation, and energy management. Its value is as a broad reference for default values and planning checks.
The demand-estimation chapter gives data-centre power-density planning ranges: 125-1,500 W/m2 for a self-contained data centre and 500-2,000 W/m2 for IT rooms in other buildings, with a simultaneity factor of 0.4-0.9. With (2n+1) redundancy the factor should be 0.4 for n=2 and 0.5 for large n. Tier IV redundancy costs roughly 2.5 times the infrastructure of a non-redundant Tier I design, with generators and UPS about 70% of the power-installation cost.
The availability chapter gives A = MTBF/(MTBF+MTTR) and the BSI classes: AVC2 99.9% (under 9 h/yr), AVC3 99.99% (under 53 min/yr), AVC4 99.999% (under 6 min/yr). That 99.999% can mean 1 s of outage per day or 1 h per 10 years shows why MTBF and MTTR must both be known. It also presents Harvard Research Group classes AEC-0 to AEC-5, with AEC-4 as fault-tolerant 24/7.
In the UPS section, the ITIC curve permits a voltage interruption of at most 20 ms for ICT power supplies, and static UPSs are classified per IEC 62040-3 by output dependency. Because UPS efficiency depends on load, a (2+1) redundancy can give higher availability, lower maintenance cost and lower losses than (6+1).
Key points
- Power-density planning ranges: 125-1,500 W/m2 for a self-contained data centre, 500-2,000 W/m2 for IT rooms in other buildings; simultaneity 0.4-0.9.
- With (2n+1) redundancy the simultaneity factor should be 0.4 (n=2) to 0.5 (large n).
- Tier IV redundancy costs about 2.5 times a non-redundant Tier I design; generators and UPS are about 70% of power-installation cost.
- A = MTBF/(MTBF+MTTR); AVC2 99.9% (<9 h/yr), AVC3 99.99% (<53 min/yr), AVC4 99.999% (<6 min/yr).
- 99.999% can mean 1 s outage per day or 1 h per 10 years, so MTBF and MTTR must both be known.
- Harvard Research Group defines AEC-0 to AEC-5; AEC-4 is fault-tolerant 24/7.
- The ITIC curve permits at most 20 ms voltage interruption for ICT power supplies.
- Because UPS efficiency depends on load, (2+1) redundancy can beat (6+1) on availability, maintenance and losses.
Using it in design
- Offer W/m2 defaults by building type (data centre vs IT room) and redundancy-dependent simultaneity factors in early sizing.
- Compute availability from MTBF/MTTR and map it to AVC/AEC labels alongside Tier.
- Warn when many small modules in N+1 run at low load, and show the module-count versus efficiency trade-off.
- Apply a redundancy multiplier of about 2.5 (Tier IV versus Tier I) in budget estimates.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Review your power design in SoSo CAD
Inspect supply paths, equipment loads and UPS failure scenarios in one model.
Request a demo
Who should read it
Electrical designers and project managers making early sizing and availability decisions for data-centre power distribution.
Related standards
- IEC 62040-3
- IEC 60364
- EN 50160
- IEC 61000-2-4
- DIN 276-1
- Uptime Institute Tier Standard: Topology
Publication details
- Authors
- Siemens
- Publisher
- Siemens
- Year
- 2018
- Document number
- TIP planning manual vol. 1
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Siemens (2018). Totally Integrated Power - Planning of Electric Power Distribution: Technical Principles. Siemens. TIP planning manual vol. 1. https://assets.new.siemens.com/siemens/assets/api/uuid:61fed5db73671d55fd2c820b0315cb4b55f71ee1/planning-of-electric-power-distribution-technical-principles.pdf
Events on this subject
- Electricity Eurasia 2027
- ELECO 2026 Elektrik-Elektronik ve Biyomedikal Mühendisliği Konferansı
- ICCI 2027 – Uluslararası Enerji ve Çevre Fuarı ve Konferansı
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.