Technical guideFree to read2018

UPS Installation Safety Requirements (Smart Tricks to Improve Power Supply Reliability series)

Eaton · Janne Paananen, Martijn Imming

Explains two frequently misunderstood UPS safety obligations under IEC 62040-1: backfeed protection and short-circuit withstand.

On this page

Overview

IEC 62040-1 requires backfeed isolation of a permanently connected UPS within 15 s after loss of supply; a static switch alone is not adequate isolation. The paper compares internal backfeed isolation with external input-line isolation. With external devices, warning labels are required on all switchgear access points between the UPS and the isolator, responsibility moves to the installer, and the arrangement may force a dual feed with separate rectifier and bypass supplies.

A single external backfeed contactor shared by several static switches turns one switch failure into loss of all bypass lines; internal contactors per module preserve redundancy and also isolate a shorted static switch.

IEC 62040-1:2008 Amendment 1:2013 became mandatory in February 2016: the manufacturer must declare a rated short-time withstand current (Icw) or a rated conditional short-circuit current (Icc) with a specified SCPD. Withstand testing is mandatory unless the declared Icw is 10 kA or less, or the SCPD limits peak let-through to 17 kA or less.

Each bypass circuit must be independently safe at the available fault level; paralleling UPSs does not reduce the requirement per unit. Generator-parallel-with-transformer cases and future upgrades must be considered.

Key points

  1. IEC 62040-1 requires backfeed isolation within 15 s after loss of supply for a permanently connected UPS; a static switch alone is not adequate.
  2. With external backfeed devices, warning labels are needed on all access points between UPS and isolator, responsibility moves to the installer, and a dual feed may be forced.
  3. One external contactor shared by several static switches loses all bypass lines on one switch failure; per-module internal contactors preserve redundancy.
  4. Amendment 1:2013, mandatory from February 2016: declare Icw or Icc with a specified SCPD.
  5. Withstand testing is mandatory unless declared Icw is 10 kA or less or the SCPD limits peak let-through to 17 kA or less.
  6. Each bypass circuit must be safe at the available fault level; paralleling does not reduce the per-unit requirement; generator paralleling and future upgrades must be considered.

Using it in design

  • Add backfeedProtection (internal or external), Icw/Icc rating and required SCPD to the UPS catalogue.
  • Compare the prospective fault current at the UPS bypass input (worst case, including generator paralleling and future transformer upgrades) with the declared rating.
  • If backfeed protection is external, add an isolator and warning-label requirement to the switchboard schedule.
  • Warn when one backfeed device serves several static switches.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Review your power design in SoSo CAD

Inspect supply paths, equipment loads and UPS failure scenarios in one model.

Request a demo
Single-line diagram in the SoSo CAD power and capacity workspace

Who should read it

Electrical engineers designing UPS inputs and switchboard schedules, and commissioning specialists.

Related standards

  • IEC 62040-1:2008+A1:2013
  • IEC 61439-1/2

Publication details

Authors
Janne Paananen; Martijn Imming
Publisher
Eaton
Year
2018
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document

Citation

Janne Paananen; Martijn Imming (2018). UPS Installation Safety Requirements (Smart Tricks to Improve Power Supply Reliability series). Eaton. https://web.archive.org/web/20250701055009/https://www.eaton.com/content/dam/eaton/markets/data-center/documents/eaton-ups-installation-safety-requirements-white-paper-en-us.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.