Overview

Paralleling is common: at least 50-60% of large UPS systems (300 kVA and up) are configured in parallel, and up to 40% of systems around 10 kVA. In the example, an 800 kVA load is protected by three 400 kVA modules in N+1, each carrying one third. In the N+1 alarm logic, five 100 kVA modules alarm when load exceeds 400 kVA.

The paper contrasts master-slave or communication-dependent paralleling schemes, which create single points of failure, with a peer-to-peer approach that needs no inter-module control wiring. Failure of the control system to switch to a redundant path is cited (GE) as the leading cause, 32%, of mission-critical power system failures.

Unbalanced load sharing (for example 40/40/20 in a three-module system) stresses some modules and can drive the system to bypass. When the paralleled modules together exceed one unit's internal static switch rating, a separate bypass cabinet with its own static switch is needed.

Parallel limits by range are given as examples: the 9395 at 200-1200 kVA up to 4800 kVA (N+1) and the 93PM at 20-400 kW up to 1200 kW. Tie cabinets are among the deployment considerations.

Key points

  1. At least 50-60% of large UPS systems (300 kVA and up) are paralleled; up to 40% of ~10 kVA systems.
  2. Example: an 800 kVA load on three 400 kVA modules in N+1, each carrying one third.
  3. Combined modules above one unit's internal static switch rating need a separate bypass cabinet.
  4. Control-system failure to switch to a redundant path is cited as the leading cause (32%, GE) of mission-critical power failures.
  5. Unbalanced sharing such as 40/40/20 stresses some modules and can drive the system to bypass.
  6. N+1 alarm: five 100 kVA modules alarm when load exceeds 400 kVA.
  7. Parallel limits: 9395 200-1200 kVA up to 4800 kVA (N+1); 93PM 20-400 kW up to 1200 kW.

Using it in design

  • Add maxParallelUnits, paralleling architecture (distributed or centralised bypass) and static switch rating to the UPS catalogue.
  • Compute redundancy-aware capacity (N+1 usable = (n-1) x module rating) and alert when design load exceeds it.
  • Require external bypass cabinet sizing when the combined output exceeds a single static switch rating.
  • Warn when the parallel scheme relies on a single master controller.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Review your power design in SoSo CAD

Inspect supply paths, equipment loads and UPS failure scenarios in one model.

Request a demo
Single-line diagram in the SoSo CAD power and capacity workspace

Who should read it

Electrical designers choosing a paralleled UPS arrangement for capacity or N+1.

Related standards

  • IEC 62040-3

Publication details

Authors
Ed Spears
Publisher
Eaton
Year
2020
Document number
WP153026EN
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document

Citation

Ed Spears (2020). Parallel UPS Systems. Eaton. WP153026EN. https://web.archive.org/web/20231018175350/https://www.eaton.com/content/dam/eaton/products/backup-power-ups-surge-it-power-distribution/backup-power-ups/power-xpert-9395/eaton-ups-parallel-whitepaper-wp153026en.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.