This record offers source metadata and independently worded extracted facts for preliminary sustainability calculations. It covers the KPI list in Annex II and the PUE, WUE, ERF and REF definitions in Annex III.

On this page

Overview

The regulation was issued by the European Commission and appears in the Official Journal of the European Union; it is dated 2024. This record consists of source metadata and independently worded extracted facts for preliminary sustainability calculations. Product-specific data are explicitly labelled proxies when applied to generic equipment.

Annex II identifies 18 energy/sustainability KPIs, two ICT-capacity KPIs and four traffic KPIs. Generator energy is reported separately within total facility energy, and annual observations and their measurement boundaries are required. This indicates that reporting must document not only the resulting value but also the boundaries within which it was measured.

Annex III defines PUE as E_DC/E_IT, WUE as W_IN in cubic metres divided by E_IT in MWh, ERF as E_REUSE/E_DC and REF as E_RES-TOT/E_DC. Renewable totals sum disjoint Guarantees of Origin, PPA and on-site components. This is an accounting principle that prevents the same renewable energy from being counted more than once.

As a limit, the record rests on only two facts; the full KPI list, the reporting process and the scope of obligations are not covered here. For those, the official text should be consulted.

Key points

  1. Annex II identifies 18 energy/sustainability KPIs, two ICT-capacity KPIs and four traffic KPIs.
  2. Generator energy is reported separately within total facility energy.
  3. Annual observations and their measurement boundaries are required.
  4. PUE = E_DC / E_IT.
  5. WUE = W_IN (m3) / E_IT (MWh).
  6. ERF = E_REUSE / E_DC and REF = E_RES-TOT / E_DC.
  7. Renewable totals sum disjoint Guarantees of Origin, PPA and on-site components.

Using it in design

  • In preliminary sustainability calculations, compute PUE, WUE, ERF and REF using the Annex III definitions.
  • Report generator energy as a separate item within total facility energy.
  • Record the measurement boundary alongside each annual value.
  • When totalling renewables, sum Guarantees of Origin, PPA and on-site components without double counting.
  • Label generic-equipment data used in place of product-specific data as proxies.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Compare the cost of design decisions

Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.

Request a demo
CAPEX and TCO estimates in the SoSo CAD cost workspace

Who should read it

Engineers and analysts preparing data center sustainability and energy reporting.

Publication details

Authors
European Commission
Publisher
European Commission / Official Journal of the European Union
Year
2024
Document language
English
Source type
Government / public
Access
Citation only
Licence
Bibliographic reference only — the document is not redistributed here; confirm reuse terms at the original source

Citation

European Commission (2024). Commission Delegated Regulation (EU) 2024/1364. European Commission / Official Journal of the European Union. https://eur-lex.europa.eu/eli/reg_del/2024/1364/oj/eng