Technical guideFree to read2016

Air Management in Small Data Centers (report for PG&E, 2016)

Lawrence Berkeley National Laboratory · Magnus Herrlin, Randall C. Cole

An LBNL report funded by PG&E on air management in small data centres shows large fan savings and smaller chiller savings.

On this page

Overview

The report is a 2016 study prepared by Lawrence Berkeley National Laboratory for PG&E, written by Magnus Herrlin and Randall C. Cole. It addresses air management in small data centres, reviews barriers and gives recommendations.

A small data centre is defined in the report as under 5,000 ft2, and elsewhere as a facility with 50-750 kW of IT load. As method, air-management packages are simulated with the Airflow Management Calculator developed by BPA and the DOE Air Management Tool.

The main result is that air management can deliver very large supply fan energy savings (70%-80%) and lower chiller savings (15%-25%). The report also stresses that installing blanking panels, or any single measure alone, is not sufficient for good air management. Limits: the results rest on simulation and the report is aimed at small facilities; the full text was not read for this record. The message for designers is that air management should be treated as a package, not a single measure.

Key points

  1. Small data centres are defined as under 5,000 ft2; elsewhere as facilities with 50-750 kW of IT.
  2. Supply fan energy savings from air management can be very large (70%-80%); chiller savings are lower (15%-25%).
  3. Installing blanking panels or any single measure alone is not sufficient for good air management.
  4. Uses the Airflow Management Calculator (developed by BPA) and the DOE Air Management Tool.
  5. Prepared for PG&E; authors Magnus Herrlin and Randall C. Cole.

Using it in design

  • In small-room projects, present air management in the airflow module as a package: containment, blanking and fan speed control.
  • Show fan and chiller savings separately.
  • Do not assume good air management after installing blanking panels alone.
  • Check facility scale (under 5,000 ft2 or 50-750 kW IT) as an applicability criterion.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Check cooling capacity alongside your design

Review zone heat loads, available capacity and the capacity balance after the largest unit is lost in SoSo CAD.

Request a demo
Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Who should read it

Engineers and facility managers designing or upgrading small data centres and server rooms.

Publication details

Authors
Magnus Herrlin; Randall C. Cole
Publisher
Lawrence Berkeley National Laboratory
Year
2016
Document language
English
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document
Original licence note

Report prepared for PG&E with reuse restrictions stated in its notice; cited only.

Citation

Magnus Herrlin; Randall C. Cole (2016). Air Management in Small Data Centers (report for PG&E, 2016). Lawrence Berkeley National Laboratory. https://eta-publications.lbl.gov/sites/default/files/pgande_final_report_2016_herrlin2001204.pdf