Data Center UPS: The Essential Characteristics of an Optimised Solution
Legrand
A Legrand white paper that frames data-centre UPS selection around continuity, total cost of ownership and adaptability; its main message is that the efficiency curve at partial load matters more than peak efficiency.
On this page
Overview
The paper organises UPS selection under three themes: continuity (availability, MTTR, N+1, hot-swap), total cost of ownership (efficiency, battery management, component life, serviceability) and adaptability to load, electrical infrastructure, room and user. It contrasts conventional parallel UPSs with modular and scalable-modular architectures.
On continuity, MTTR for modular UPSs can be about 30 minutes (power-module swap) versus roughly 1-4 h for conventional units; the vendor table lists Keor MOD/UPSaver 0.5 h, Keor HPE 1-4 h and Keor XPE 3-6 h. In the N+1 example, a 1000 kW N+1 modular system built from 333 kW modules needs 1333 kW installed, whereas conventionally it could be 6 x 200 kW, 5 x 250 kW or 3 x 500 kW units in parallel. Scalable systems reach 2.1 MW with 250/300 kW power units, and 2.67 MW (up to 21 MW in parallel) with 333 kW units.
On energy, the cited split is IT equipment about 55%, cooling about 30%, power infrastructure including UPS losses about 12% and lighting about 3%. UPS load is usually below 50%, and the cited efficiency curve peaks (up to 96.6%) in the 20-50% load band. For a 10 MW data centre a 1-point efficiency gain (95.5% to 96.5%) saves about USD 1.3 million of OpEx over 10 years; OpEx is typically 60-75% of UPS TCO.
The pay-as-you-grow examples show capacity added in steps with efficiency staying nearly flat, and the load-variation cases (a maintenance week from 75% to 50%, a cooling UPS varying up to 35%) change efficiency by only about 0.5%. This is a vendor publication, with figures drawn from Legrand product families.
Key points
- MTTR is about 30 minutes for modular UPSs (module swap) versus roughly 1-4 h for conventional units.
- A 1000 kW N+1 modular system from 333 kW modules needs 1333 kW installed; conventional alternatives are 6 x 200, 5 x 250 or 3 x 500 kW.
- Energy split: IT about 55%, cooling about 30%, power infrastructure incl. UPS losses about 12%, lighting about 3%.
- For a 10 MW data centre, raising UPS efficiency from 95.5% to 96.5% saves about USD 1.3 million OpEx over 10 years.
- OpEx is typically 60-75% of UPS TCO; CapEx plus installation 25-40%.
- UPS load is usually below 50%; the efficiency curve peaks (up to 96.6%) in the 20-50% load band.
- Scalable systems: 250/300 kW units reach 2.1 MW per system; 333 kW units 2.67 MW, up to 21 MW in parallel.
- Load-variation examples change efficiency by only about 0.5%.
Using it in design
- Give UPS records an architecture enum {conventional, modular, scalable_modular}, module rating, maximum parallel units, MTTR hours and a hot-swap flag; store efficiency at 25/50/75/100% load, not one number.
- Compute installed kW for N+1 as ceil(load/module)+1 modules and show the over-provisioning percentage.
- Warn when the expected operating point (2N halves the load) falls outside the vendor's peak-efficiency band.
- In the TCO tool default the OpEx share to 60-75% and run the 10-year loss cost per efficiency point.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Review your power design in SoSo CAD
Inspect supply paths, equipment loads and UPS failure scenarios in one model.
Request a demo
Who should read it
Electrical designers and cost owners choosing UPS architecture, module granularity and efficiency curve.
Related standards
- IEC 62040-3
Publication details
- Authors
- Legrand
- Publisher
- Legrand
- Year
- 2022
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Legrand (2022). Data Center UPS: The Essential Characteristics of an Optimised Solution. Legrand. https://legrand.com/datacenter/sites/g/files/ocwmcr716/files/2025-05/Data%20Center%20UPS%20The%20Essential%20Characteristics%20of%20an%20Optimised%20Solution.zip
Events on this subject
- Electricity Eurasia 2027
- ELECO 2026 Elektrik-Elektronik ve Biyomedikal Mühendisliği Konferansı
- 7x24 Exchange Spring Conference
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.