Overview
The power path runs from the utility service through MV switchgear, MV/LV transformers, LV switchgear, UPS switchboards, PDUs/RPPs, busway, panelboards and rack PDUs. The paper explains what each assembly does and where it normally sits: MV switchgear typically marks the service entrance for data centres above 1 MW IT load, LV switchgear or switchboards below 1 MW. Three-phase 3-wire and 4-wire systems, regional nominal voltages and standard ampere series are covered too.
The voltage and current tables are practical references: North America 480Y/277 and 208Y/120 (415/240 V for new data centres), Europe 400Y/230 at 50 Hz, China 380Y/220, Japan 200 V 3-wire, with measured voltage varying about +/-10%. The IEC 60059 R10 series runs 1, 1.25, 1.6, 2, 2.5, 3.15, 4, 5, 6.3, 8 x 10^n, while ANSI/IEEE lists ratings from 15 A to 6000 A. The difference between breaking capacity and short-circuit withstand rating is explained separately.
A comparison table gives typical ranges: UPS about 20-1,600 kW with roughly 15 minutes of battery ride-through, PDU 50-500 kW, panelboard 1.5-75 kVA with 42 poles. Data centres under 2 MW without redundancy have about 4 to 7 LV switchgear breakers per MW of IT capacity, which can easily double with redundancy and concurrent maintenance. The electrical system including UPS and generator is 40-50% of capex excluding the building, split about 50-60% equipment, 25-35% installation and 15-20% design. An appendix separates US switchgear, switchboards and panelboards by their ANSI/UL standards.
Key points
- MV switchgear marks the service entrance above 1 MW IT load; LV switchgear/switchboard marks it below 1 MW.
- Nominal LV systems: 480Y/277 and 208Y/120 (North America, 415/240 V for new builds), 400Y/230 50 Hz (Europe), 380Y/220 (China), 200 V 3-wire (Japan); measured voltage may vary about +/-10%.
- IEC 60059 R10 ampere series is 1, 1.25, 1.6, 2, 2.5, 3.15, 4, 5, 6.3, 8 x 10^n; ANSI/IEEE standard ratings run from 15 A to 6000 A.
- Example ratings: ANSI MV switchgear 15 kV, 95 kV BIL, 1200 A, 40 kA SCCR; IEC LV switchboard 690 V, 12 kV impulse withstand, 5000 A, 85 kA withstand; dry transformer 2500 kVA, 10 kV/400 V, 5% Z.
- UPS batteries typically give about 15 minutes at full load; UPS 20-1,600 kW, PDU 50-500 kW, panelboard 1.5-75 kVA with 42 poles.
- An STS gives fast (1/4 cycle) open-transition switching between two UPS feeds; an RPP has about a 2'x2' tile footprint and up to four panelboards.
- Below 2 MW without redundancy there are about 4-7 LV breakers per MW of IT; redundancy and concurrent maintenance can double it, and above 20 MW MV breakers tend to outnumber LV.
- Electrical is 40-50% of capex excluding building: equipment 50-60%, installation 25-35%, design 15-20%; 1N cost per kW: MV switchgear $8-92, transformers $35-90, LV switchboard $80-200, panelboard $20-40, PDU/RPP $100-400.
Using it in design
- In the single-line editor define node types for MV switchgear, MV/LV transformer, LV switchboard/ATS, UPS input/output/distribution boards, STS, PDU, RPP, busway, panelboard and rack PDU, each with rated voltage, rated current, breaking capacity (kAIC/Icu) and withstand rating (SCCR/Icw).
- Check that each device's breaking or withstand rating is at least the available fault current at its bus, and suggest an MV service entrance when IT load exceeds 1 MW.
- Choose breaker frame sizes from the IEC R10 or ANSI series according to the selected standard region, and use the Table 1 regional voltage presets with a default 5% transformer Z.
- In the cost estimator use the Table 2 per-kW ranges as rough 1N defaults.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Review your power design in SoSo CAD
Inspect supply paths, equipment loads and UPS failure scenarios in one model.
Request a demo
Who should read it
Electrical designers building single-line diagrams and choosing equipment classes, and engineers new to data-centre power.
Related standards
- IEC 60059
- IEC 61439
- IEC 62271
- IEEE/ANSI C37.20.1
- UL 891
- UL 67
- UL 1558
- NFPA 70
Publication details
- Authors
- Pearl Hu
- Publisher
- Schneider Electric
- Year
- 2015
- Document number
- WP 61
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Pearl Hu (2015). Electrical Distribution Equipment in Data Center Environments. Schneider Electric. WP 61. https://download.schneider-electric.com/files?p_Doc_Ref=SPD_VAVR-8W4MEX_EN
Events on this subject
- Electricity Eurasia 2027
- ELECO 2026 Elektrik-Elektronik ve Biyomedikal Mühendisliği Konferansı
- 7x24 Exchange Spring Conference
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.