Protections for Data Centers Powered by Direct Current (Technical Paper)

Siemens / NVIDIA · Guang Yang, Mike Tu

This 2025 Siemens/NVIDIA paper examines how to protect 800 V DC distribution for megawatt AI racks. It compares grounding schemes and protection devices through simulations of a 1 MW block.

On this page

Overview

The paper compares floating, high-resistance and solid grounding, each at +/-400 V and 800 V. On the device side it simulates fuses, mechanical breakers, solid-state and hybrid breakers. Interruption speeds are laid out together: solid-state breakers act in under 0.5 ms, hybrids in 1-3 ms, while a fuse reached its melting I2t in about 1 ms and needed about 20 ms to recover. In the 1 MW floating 800 VDC case study, a solid-state circuit breaker (SSCB) held peak fault current below 800 A and healthy loads saw only about 1 V of variation.

Because the fault current is limited, neighbouring racks keep running unaffected. The result shows concretely why AC-style selectivity logic has to be rebuilt for DC. Personnel protection and arcing expose gaps in the standards. UL 943C Class E ground-fault interruption is about 850 us at 400 VDC and about 300 us at 800 VDC, while UL 2367 covers e-fuses only up to 60 VDC. Arc mitigation shorted an initiated arc in about 3 ms.

For ride-through, holding voltage within 10% for 10 ms at 1 MW needs about 80 mF of capacitance. The work is simulation-based, covers one block size and selected topologies, and is neither field measurement nor a full standard proposal. It is still a core reference for anyone planning 800 VDC because it shows that DC arc-flash cannot reuse the IEEE 1584 results used for AC and that protection choice is tied to the grounding decision.

Key points

  1. Solid-state breakers interrupt in under 0.5 ms; hybrid 1-3 ms; fuse reached melting I2t in about 1 ms with about 20 ms recovery.
  2. With SSCB, peak fault current under 800 A and about 1 V variation on healthy loads (1 MW floating 800 VDC simulation).
  3. Keeping voltage within 10% for 10 ms at 1 MW needs about 80 mF.
  4. UL 943C Class E ground-fault interruption: about 850 us at 400 VDC, about 300 us at 800 VDC.
  5. UL 2367 covers e-fuses only up to 60 VDC.
  6. Arc mitigation shorted an initiated arc in about 3 ms.
  7. Grounding schemes compared: floating, high-resistance, solid; +/-400 V and 800 V.

Using it in design

  • If 800 VDC is selected, require SSCB/hybrid breakers in the protection catalog.
  • Require an explicit grounding-scheme decision (floating, high-resistance, solid).
  • Add a DC arc-flash study as a mandatory task; do not reuse AC IEEE 1584 results for DC.
  • Size load-side ride-through capacitance against the 10 ms / 10% criterion (about 80 mF at 1 MW).
  • Record the UL gaps (the UL 2367 60 VDC limit) in the personnel-protection risk register.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Review your power design in SoSo CAD

Inspect supply paths, equipment loads and UPS failure scenarios in one model.

Request a demo
Single-line diagram in the SoSo CAD power and capacity workspace

Who should read it

Electrical engineers designing 800 VDC distribution and protection for megawatt-class AI racks.

Related standards

  • UL 943C
  • UL 2367
  • IEC 60364-4-41
  • NFPA 70E (DC arc flash)
  • IEC 60947-2

Publication details

Authors
Guang Yang; Mike Tu
Publisher
Siemens / NVIDIA
Year
2025
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document

Citation

Guang Yang; Mike Tu (2025). Protections for Data Centers Powered by Direct Current (Technical Paper). Siemens / NVIDIA. https://assets.new.siemens.com/siemens/assets/api/uuid:cacbc29b-5d0d-4b12-9053-696eb0b43e74/Protections-for-Data-Centers-Powered-by-Direct-Current-Technical-Paper_original.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.