WP#92 - TGG's Position on the Metric to Calculate ICT Server Capacity (Cserv) Under the EU EED Delegated Regulation (2024/1364)
The Green Grid · TGG ITE External Metrics Work Group
The Green Grid's October 2024 position paper proposes PerfCPU as the standard metric for ICT server capacity (Cserv) under the EU EED reporting regulation.
On this page
Overview
WP#92 is a Green Grid position paper dated 16 October 2024, prepared by the TGG ITE External Metrics Work Group. The paper's context is Delegated Regulation 2024/1364 under the EU Energy Efficiency Directive (EED). That regulation sets the reporting scheme for data centres, and among the quantities to be reported is ICT server capacity (Cserv). The paper sets out the industry view on how Cserv should be calculated.
The core of the proposal is the use of PerfCPU as the metric for Cserv. PerfCPU is the maximum CPU performance defined by the equation in Section 5.2 of ETSI EN 303 470. Server capacity is thereby expressed as a value that rests on an existing standard and can be calculated per server model.
Limits: this is the position paper of an industry body, not a binding regulation, and its full text was not read, so the details of the equation and the reasoning are absent from this record. For designers and operators its value is in showing one way to fill the Cserv field in EED reporting.
Key points
- Dated 16 October 2024; paper of the TGG ITE External Metrics Work Group.
- Proposes PerfCPU as the metric for Cserv.
- PerfCPU is defined by the equation in EN 303 470 Section 5.2.
- Context: EU EED Delegated Regulation 2024/1364.
- Related standards: Delegated Regulation (EU) 2024/1364 and ETSI EN 303 470.
Using it in design
- In the EED reporting export, include a Cserv field computed from PerfCPU per server SKU.
- State the source of the PerfCPU value (EN 303 470 Section 5.2) in the report.
- Note in the reporting notes that the paper is a position, not a binding method.
- Keep the Cserv calculation configurable so it can be updated if the regulator's final method changes.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Compare the cost of design decisions
Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.
Request a demo
Who should read it
Data centre operators doing EED reporting in the EU and teams building reporting tools.
Related standards
- Delegated Regulation (EU) 2024/1364
- ETSI EN 303 470
Publication details
- Authors
- TGG ITE External Metrics Work Group
- Publisher
- The Green Grid
- Year
- 2024
- Document number
- WP 92
- Document language
- English
- Source type
- Industry body
- Access
- Citation only
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Original licence note
Download requires a free TGG account sign-in and is governed by The Green Grid Terms of Use; summary and facts from the public library landing page; full text not redistributed.
Citation
TGG ITE External Metrics Work Group (2024). WP#92 - TGG's Position on the Metric to Calculate ICT Server Capacity (Cserv) Under the EU EED Delegated Regulation (2024/1364). The Green Grid. WP 92. https://www.thegreengrid.org/resources/library-and-tools/wp92-tggs-position-metric-calculate-ict-server-capacity-cserv-under-eu
Events on this subject
Browse the events calendarAll content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.