WP#94 - IT Work Capacity (ITWC) v1 Metric - A Methodology
The Green Grid · TGG ITE Metrics Work Group
A Green Grid white paper describing a methodology for computing the total server work capacity (Cserv) of a data centre via PerfCPU for EU EED compliance.
On this page
Overview
The Green Grid's WP#94 is dated 27 March 2025 and was prepared by The Green Grid ITE Metrics Work Group. The paper introduces the ITWC v1 metric: a methodology for calculating the total server work capacity (Cserv) of a data centre. The calculation serves requirements under the EU Energy Efficiency Directive (EED). The paper is available through a registration-based download, and this summary relies on the public library page.
The method uses a PerfCPU value for each processor. The paper includes an error analysis of estimating PerfCPU from a physical core-count trendline. Lookup tables are also given, with PerfCPU values by CPU SKU and by core count, manufacturer and generation. The two approaches allow a direct lookup when the exact SKU is known and an estimate based on core count when it is not.
Searchable PerfCPU Excel tables and an ITWC calculation tool, together with an online calculator, accompany the paper. This makes the method easy to use in practice and gives a repeatable calculation route for audits. The limit of the paper is that v1 covers servers only; future versions are stated to add storage and networking work capacity. Related documents include Delegated Regulation (EU) 2024/1364 and ETSI EN 303 470. This record rests on the abstract only; for the detailed coefficients and tables, the paper itself should be consulted.
Key points
- Dated 27 March 2025; prepared by The Green Grid ITE Metrics Work Group.
- ITWC v1 calculates total server work capacity (Cserv) for EU EED requirements.
- Includes error analysis of PerfCPU estimated from a physical core-count trendline.
- Provides lookup tables by CPU SKU and by core count, manufacturer and generation.
- Searchable PerfCPU Excel tables and an ITWC calculation tool accompany it.
- Future versions will cover storage and networking.
- Related documents: Delegated Regulation (EU) 2024/1364 and ETSI EN 303 470.
Using it in design
- In the server catalogue, add CPU SKU and PerfCPU fields.
- Compute Cserv per hall for EED reports.
- Fall back to core-count lookup tables when SKU information is missing.
- State the lookup method used (SKU or core count) in the report.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Compare the cost of design decisions
Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.
Request a demo
Who should read it
Energy and sustainability engineers and compliance officers reporting data centre work capacity under the EU EED.
Related standards
- Delegated Regulation (EU) 2024/1364
- ETSI EN 303 470
Publication details
- Authors
- TGG ITE Metrics Work Group
- Publisher
- The Green Grid
- Year
- 2025
- Document number
- WP 94
- Document language
- English
- Source type
- Industry body
- Access
- Citation only
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Original licence note
Download requires a free TGG account sign-in and is governed by The Green Grid Terms of Use; summary and facts from the public library landing page; full text not redistributed.
Citation
TGG ITE Metrics Work Group (2025). WP#94 - IT Work Capacity (ITWC) v1 Metric - A Methodology. The Green Grid. WP 94. https://www.thegreengrid.org/resources/library-and-tools/wp-94-itwc-methodology-calculate-server-work-capacity-cserv-data
Events on this subject
Browse the events calendarAll content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.