Transforming Colocation Facilities to Meet Demand for AI Compute
Vertiv
This 2026 Vertiv guide covers the power, cooling and commissioning steps colocation operators face when converting halls for AI pods.
On this page
Overview
The guide starts with density: average multi-node AI pod density is projected to rise from 40-100 kW to 100-250 kW. On power it covers BESS and grid-support UPS modes to ease grid constraints, UPS behaviour under GPU step loads, and higher-voltage and 800 VDC distribution delivered by busway. Data-centre BESS is typically Li-ion sized for 1 to 6 hours at full load. GPU step changes commonly range from below 30% to 100% of load, with peaks up to 150% of UPS rated capacity within milliseconds.
The cooling section splits heat between direct-to-chip liquid and residual air. Air-cooled facilities typically run PUE 1.5-1.7, meaning up to 30% of power goes to non-compute functions. Direct-to-chip cooling typically removes over 70% of rack heat; the remaining ~30% (memory, NICs, PSUs) needs air. With rear-door heat exchangers, room air must be able to carry 100% of the rack load while the exchanger is serviced. For CDU placement, in-rack, in-row or gallery options are covered, with row- or suite-level N+1 and liquid-to-air CDUs for operators with few liquid customers.
Commissioning and operation steps are concrete: fluid quality verification, air removal from all pipe runs, sensor and alarm validation and staged ramp-up with simulated heat loads, with leak sensors at every critical connection and loop separation practices. Factory-integrated prefabricated modules can cut deployment time by up to 50% against traditional builds. The text is a vendor guide, and its numbers are projections and typical values rather than measured results.
Key points
- Average multi-node AI pod density is projected to rise from 40-100 kW to 100-250 kW.
- Data-centre BESS is typically Li-ion sized for 1 to 6 hours at full load, paired with grid-support UPS modes.
- GPU step changes commonly range from below 30% to 100% of load, with peaks up to 150% of UPS rated capacity within milliseconds.
- Air-cooled facilities typically run PUE 1.5-1.7, meaning up to 30% of power goes to non-compute functions.
- Direct-to-chip cooling typically removes over 70% of rack heat; the remaining ~30% (memory, NICs, PSUs) needs air cooling.
- With rear-door heat exchangers, room air must carry 100% of the rack load while the exchanger is serviced.
- Liquid commissioning: fluid quality verification, air removal from all runs, sensor/alarm validation and staged ramp-up with simulated heat loads; leak sensors at every critical connection.
- Factory-integrated prefabricated modules can cut deployment time by up to 50% versus traditional builds.
Using it in design
- Give the rack/pod model a liquid fraction (default about 70% for direct-to-chip) so residual air load is computed automatically.
- For rear-door exchanger racks check room air capacity covers 100% of the rack during door service, and require N+1 CDUs at row or suite level.
- Require leak detection points at CDU and manifold connections, and flag UPS overload capability below the expected GPU peak (up to 150%).
- Offer CDU placement options (in-rack, in-row, gallery, liquid-to-air) and a liquid-cooling commissioning checklist.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Check cooling capacity alongside your design
Review zone heat loads, available capacity and the capacity balance after the largest unit is lost in SoSo CAD.
Request a demo
Who should read it
Operators and designers converting existing colocation halls for AI pods.
Related standards
- ASHRAE TC 9.9 Liquid Cooling Guidelines
- OCP ORV3
- IEC 62040-3
Publication details
- Authors
- Vertiv
- Publisher
- Vertiv
- Year
- 2026
- Document number
- SL-80478
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Vertiv (2026). Transforming Colocation Facilities to Meet Demand for AI Compute. Vertiv. SL-80478. https://www.vertiv.com/495e4c/globalassets/documents/white-papers/transforming-colocation-facilities-to-meet-demand-for-ai-compute_white-paper_english.pdf
Events on this subject
Browse the events calendarAll content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.