A white paper from ABB SACE dated October 2016 (1SDC007116G0201) that uses time-current curves to show why low-voltage breaker settings that are selective on the utility transformer lose selectivity when the plant is islanded on a local generator. The remedy is a second settings group (Set B) stored in the Emax 2 trip unit that activates automatically on transfer and reverts to Set A when the grid returns.

On this page

Overview

The paper addresses a coordination problem that arises because short-circuit power depends on the source. While the plant is grid-connected, a feeder fault is fed by the utility through the MV/LV transformer; when islanded, fault current comes only from local generation and is far lower. Thresholds chosen for the grid condition either trip late on generator supply or overlap with the generator breaker. The paper therefore recommends that protection thresholds change automatically during the transition to islanding.

The worked scenario uses a simple single-line arrangement: main breaker A on the utility side, generator breaker B, feeder breakers C, load breakers D and breaker E, which separates non-priority loads. Four conditions are examined in turn. Grid-connected, the C breakers are selective with both A and D and the curves do not intersect. When the ATS function transfers to the generator, A opens, B closes and E opens to shed non-priority loads. If the settings stay unchanged, the C breakers are not selective with generator breaker B.

With adaptive protection enabled, the thresholds of the C breakers move to Set B by themselves at transfer. Because that set is optimised for the generator's characteristics, selectivity between B and C and between C and D is preserved. When the grid returns, the ATS recloses A and opens B and the thresholds go back to Set A. ABB summarises the benefits under three headings: overcurrent protection and selectivity in both operating conditions, fewer redundant components inside the switchboard, and straightforward commissioning with the Ekip Connect software.

The second half covers implementation. Set B can be activated in four ways: through a digital input on the Ekip Signalling module, through one of seven communication protocols (Modbus RS-485, Profibus, DeviceNet, Modbus TCP, Profinet, EtherNet/IP, IEC 61850), locally from the trip unit display, or by a settable internal timer that runs after the breaker closes. In the example, the digital input on terminals H11 and HC1 is wired in series with status contact Q/1 of the main breaker downstream of the transformer. A fourteen-step Ekip Connect programming sequence and verification through the 'Set B ON' entry in the event log are shown.

The paper, marked 'Preliminary' on its cover, is product-specific: the function relies on the Ekip Hi-Touch and G Hi-Touch trip units of Emax 2 air circuit breakers, and no numerical settings are given; it notes that the Set B values must be determined by the user. The problem it describes nevertheless applies to every data-centre LV system that transfers to generators. A coordination study carried out only at the utility fault level does not demonstrate selectivity under generator operation.

Key points

  1. Feeder fault current is supplied by the utility when grid-connected and only by local generation when islanded, so protection thresholds must differ between the two states.
  2. With unchanged settings after transfer, the feeder breakers (C) are not selective with the generator breaker (B).
  3. Set B, activated automatically by the transfer, restores selectivity when islanded, and thresholds revert to Set A when the grid returns; ABB presents this as 100% selectivity in both conditions.
  4. On transfer to the generator, non-priority loads are disconnected by the load-shedding function in the generator breaker's trip unit.
  5. Set B is activated in one of four ways: digital input, one of seven communication protocols, the local display, or an internal timer after breaker closing.
  6. In the example wiring, input H11-HC1 of the Ekip Signalling 2K module is in series with auxiliary contact Q/1 of the main breaker; the module requires an Ekip Supply module.
  7. Required equipment: Emax 2 with Ekip Hi-Touch or G Hi-Touch trip unit, Ekip Signalling 2K, Ekip Supply, the Ekip T&P programming unit and the free Ekip Connect software.
  8. Example selection: E1.2N 1600 Ekip Hi-Touch LSIG 4-pole breaker (1SDA072869R1).

Using it in design

  • Run the selectivity study for two fault scenarios separately: supply from the utility transformer and supply from the generator alone. Check the time-current curves for intersections in both.
  • If generator fault current falls below the short-time or instantaneous thresholds of the feeder breakers, specify trip units with dual settings groups or an equivalent adaptive protection function.
  • Show the signal that triggers the settings change (main breaker auxiliary contact or communications) on the transfer sequence drawing, and define which set stays active if the signal is lost.
  • Fix the load-shedding list together with generator capacity, and show on the single-line diagram which breaker separates the non-priority loads.
  • Include verification of both sets in commissioning tests: the move to Set B on transfer, the return to Set A when the grid is restored, and a check of the event log.

Who should read it

Electrical engineers carrying out low-voltage protection coordination, designers of plants with generators or microgrids, and switchboard commissioning teams.

Document contents

  1. General introduction
  2. Emax 2 solution
  3. Benefits
  4. Application scenario
  5. Grid-connected condition
  6. Islanding condition without Adaptive protections
  7. Islanding condition with Adaptive protections
  8. Return to grid-connected condition
  9. How it works: Activation of Adaptive protections, Wiring, Programming on Ekip Connect
  10. Adaptive protections verification
  11. Equipment Selection

Related standards

  • IEC 60947-2
  • IEC 60364-5-55

Publication details

Authors
ABB
Publisher
ABB
Year
2016
Document number
1SDC007116G0201
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

ABB white paper, free download; copyright ABB, no open licence.

Citation

ABB (2016). Emax 2 Adaptive protections (white paper): selectivity in grid-connected and islanded operation. ABB. 1SDC007116G0201. https://library.e.abb.com/public/a6a90fcc6b67462d827e1f15cd308682/1SDC007116G0201_WP%20Adaptive%20Setting.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.