Data Center Life Cycle Co-Design Optimization
arXiv (author manuscript) · Shrenik Jadhav, Vidhyashree Nagaraju et al.
A 2026 arXiv paper by Jadhav, Nagaraju and Liu evaluates 611 ways to partition Frontier's 25 CDUs; two subloops is best when redundancy is not costed, four or five once the N+1 standby train is priced.
On this page
Overview
The study addresses liquid-cooled supercomputer cooling plants that reject tens of megawatts of waste heat through parallel subloops serving coolant distribution units (CDUs). The number of subloops and the assignment of CDUs to them are design decisions fixed at construction and not systematically optimised at this scale. The paper combines operational energy from a validated control optimiser, embodied carbon and capital cost from a bill of materials, maintenance over service life and expected unplanned downtime from a component-level reliability model in one framework.
All 611 ways of partitioning the 25 CDUs of Frontier at Oak Ridge into two to six subloops are evaluated over a 7-year horizon. When redundancy is not costed, the optimum is two subloops holding 14 and 11 CDUs: 3,320.7 t CO2e and $3,987k, saving 35.7 t and $63k against the documented as-built three duty subloops (14, 6, 5). The difference comes from embodied carbon in piping, not operating efficiency, and holds across 15 sensitivity scenarios and both extremes of CDU grouping.
When the N+1 standby train the plant actually carries is priced, the ranking reverses: the standby train is expensive at low subloop counts and cheap at high ones, and the optimum moves to four or five duty subloops. The paper concludes that redundancy policy, not cost or carbon, sets the subloop count. It also shows that converting the built plant does not pay back; the framework is a greenfield design tool.
The authors state the limits: the reliability layer is limited to an N+1 model, common-cause failures and switchover dynamics are not fully represented, the study focuses on high-temperature water cooling, and extension to immersion, two-phase or rear-door architectures is future work. Operational data come from the public 2023 Frontier dataset at 10-minute resolution.
Key points
- 611 partitions of Frontier's 25 CDUs into two to six subloops are evaluated over a 7-year horizon.
- Without costing redundancy the optimum is two subloops (14 and 11 CDUs): 3,320.7 t CO2e and $3,987k.
- The documented as-built plant has three duty subloops (14, 6, 5 CDUs); the optimum saves 35.7 t and $63k.
- The difference comes from embodied carbon in piping, not operating energy.
- The result holds across 15 sensitivity scenarios and two extremes of physical CDU grouping.
- With the N+1 standby train priced, the optimum moves to four or five duty subloops; redundancy policy sets the subloop count.
- The built partition is not optimal even at its own duty count, because 14 CDUs on one branch forces an oversized spare.
- Search over bounded-imbalance partitions cuts 611 candidates to 26 and finds the same exact optimum.
- Converting the built plant would cost about $264k against a capturable operational saving of $1.34k over 7 years.
- US data centres used 4.4% of electricity in 2023, projected to reach 6.7-12% by 2028; Frontier peak power is 30 MW.
Using it in design
- In a new liquid-cooled plant, choose the subloop count not on cost or carbon alone but together with sizing the standby train to the largest duty branch.
- Distribute CDUs evenly across loops; loading one branch with many CDUs oversizes the standby train.
- Include piping embodied carbon as an explicit item in the subloop comparison.
- Fix the subloop architecture at design stage; structural conversion after construction does not pay back, so focus on operational improvement in an existing plant.
- For many candidate partitions, use the bounded-imbalance search to cut computation.
Who should read it
Engineers and researchers designing cooling plants for liquid-cooled high-performance computing and AI data centres.
Document contents
- Introduction
- Method
- Results
- Sensitivity analysis
- Redundancy pricing
- Conclusions and future work
Publication details
- Authors
- Shrenik Jadhav; Vidhyashree Nagaraju; Zheng Liu
- Publisher
- arXiv (author manuscript)
- Year
- 2026
- Document number
- arXiv:2606.15408v2
- Document language
- English
- Source type
- Scientific
- Access
- Free to read
- Licence
- CC BY-NC-SA 4.0: share with attribution for noncommercial purposes under the same licence
Original licence note
Article-specific arXiv view-license link is CC BY-NC-SA 4.0; commercial redistribution is not authorized.
Citation
Shrenik Jadhav; Vidhyashree Nagaraju; Zheng Liu (2026). Data Center Life Cycle Co-Design Optimization. arXiv (author manuscript). arXiv:2606.15408v2. https://doi.org/10.48550/arXiv.2606.15408
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.