Technical guideFree to read2025

Cooling the Cloud: Water Utilities in a Data-Driven World

American Water Works Association

AWWA's October 2025 report on data-centre impacts on water utilities (demand, infrastructure, cost, energy, regulation) with an eight-point planning framework; direct consumption is projected from 5.6 billion gallons in 2014 to 73 billion in 2028.

On this page

Overview

The report helps water utilities prepare for data-centre development. The introduction notes that 1,240 data centres were built or approved by 2024 (Northern Virginia 329, Maricopa County 48). Section 3 covers impacts under four headings: increased water demand and consumption, strains to infrastructure and resiliency, water supply alternative opportunities and increased costs.

On demand, one estimate projects annual direct water consumption for cooling rising from 5.6 billion gallons in 2014 to 73 billion by 2028, though projections vary. Another study finds water use per unit of digital output can vary by up to 10,000 times depending on server efficiency, utilisation, grid water consumption, cooling system type and climate. An Alabama utility with about 6 million gallons per day of capacity said a hyperscale request of 2 million gallons per day would need significant upgrades.

The infrastructure section stresses that data centres are often sited on affordable land outside the transmission core and can be built faster than water infrastructure, and advises utilities to avoid overbuilding because of stranded-asset risk. Aurora Water's Large Water User Guide sets thresholds of 500 to 3,000 gallons per acre per day based on recoverable volume, codified in the city code in 2025.

The cost section refers to AWWA M1 rate principles: tap fees and system development charges should recover true cost of service, waived fees can shift costs to other users, and in Colorado water rights can account for up to 80% of a tap fee. The final section offers utilities eight considerations: regional coordination, source, treatment capacity, transmission and distribution, other customers, financials, alternatives (low or zero water cooling, reuse) and contingencies.

Key points

  1. 1,240 data centres were built or approved by 2024; Northern Virginia 329, Maricopa County 48.
  2. One estimate projects direct cooling water use rising from 5.6 billion gallons in 2014 to 73 billion in 2028; projections vary by study.
  3. Water use per unit of digital output can vary up to 10,000 times with server efficiency, cooling type and climate.
  4. An Alabama utility (about 6 million gallons/day capacity) said it could not meet a 2 million gallons/day request without significant upgrades.
  5. Data-centre water demand follows electricity use; clustering complicates peak demand planning.
  6. Design options include proximity to recycled water pipelines, on-site storage, cooling system choice and siting on existing capacity.
  7. Aurora Water's guide sets thresholds of 500-3,000 gallons per acre per day by recoverable volume; codified in 2025.
  8. Tap fees and system development charges must recover true cost of service; in Colorado water rights can reach 80% of a tap fee.
  9. Utility considerations: regional coordination, source, treatment, transmission and distribution, other customers, financials, alternatives and contingencies.

Using it in design

  • In the water demand file, give average and peak values linked to the electrical load profile and state clustering scenarios.
  • Treat siting near recycled water pipelines and on-site water storage as design options that reduce peak demand.
  • If utility capacity is limited, specify low or zero water cooling systems from the start.
  • Confirm with the utility early that transmission and distribution infrastructure is adequate at the site, and align its schedule with the facility's.
  • Include connection and system development charges in the project budget and coordinate water rights acquisition with the utility's planning.

Who should read it

Water utilities, data-centre developers and engineers planning water supply and infrastructure cost sharing.

Document contents

  1. Introduction
  2. What are data centers?
  3. What are the potential impacts data centers pose to water systems?
  4. Increased water demand and consumption
  5. Strains to infrastructure and resiliency
  6. Water supply alternative opportunities
  7. Increased costs
  8. What are the energy-related impacts?
  9. How are data centers regulated?
  10. What can utilities do if expecting data center development?
  11. Conclusion
  12. References

Publication details

Authors
American Water Works Association
Publisher
American Water Works Association
Year
2025
Document language
English
Source type
Industry body
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

CopyrightOctober 2025 AWWA; all rights reserved; reproduction and commercial use prohibited without written permission. Citation metadata and brief original synopsis only; do not ingest full text.

Citation

American Water Works Association (2025). Cooling the Cloud: Water Utilities in a Data-Driven World. American Water Works Association. https://www.awwa.org/wp-content/uploads/AWWA-Cooling-the-Cloud-Water-Utilities-in-a-Data-Driver-World.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cooling capacity in SoSo CAD

Check zone heat loads, installed capacity and the capacity left with the largest unit out, as part of the design.

Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.