Notice from China's Ministry of Industry and Information Technology and five other agencies (工信厅联节函〔2025〕279号): voluntary nomination requires at least one year of stable full-system operation and PUE of 1.30 or less.

On this page

Overview

The joint notice from six agencies calls for voluntary nomination of green data centres in six sectors and sets eligibility conditions on operating history, utilisation and efficiency. The nomination criteria require at least one year of stable full-system operation and PUE no higher than 1.30. Participation is voluntary and uses the attached 2025 assessment system. The document number is 工信厅联节函〔2025〕279号.

This dated nomination programme is distinct from the underlying GB standards. It defines the operating period and PUE threshold for operators who want recognition as a green data centre in China; it does not replace the standards themselves.

Key points

  1. A joint notice from six agencies; document number 工信厅联节函〔2025〕279号.
  2. A call for voluntary nomination of green data centres in six sectors.
  3. Condition: at least one year of stable full-system operation.
  4. Condition: PUE must not exceed 1.30.
  5. Participation is voluntary and uses the attached 2025 assessment system.
  6. The programme is a dated nomination programme distinct from the underlying GB standards.

Using it in design

  • For projects aiming at green data centre recognition in China, set PUE of 1.30 or less as a measurement-based design and operating target.
  • Keep metering and recording infrastructure ready at commissioning for at least one year of stable full-system operation records.
  • Track the nomination criteria separately from GB standard requirements; give each its own row in the compliance matrix.
  • Use the attached 2025 assessment system for the application.

Who should read it

Organisations operating data centres in China and seeking green data centre recognition, and energy compliance advisers.

Publication details

Authors
Ministry of Industry and Information Technology, China
Publisher
Ministry of Industry and Information Technology, China
Year
2025
Document number
工信厅联节函〔2025〕279号
Document language
Chinese
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Official public publisher text inspected. No document-specific commercial redistribution permission established; metadata and original short summaries only.

Citation

Ministry of Industry and Information Technology, China (2025). 2025 National Green Data Centre recommendation programme. Ministry of Industry and Information Technology, China. 工信厅联节函〔2025〕279号. https://www.miit.gov.cn/jgsj/jns/gzdt/art/2025/art_8b28fd87e38141239c103f553d16fa45.html

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.