Data centre obligations (Datakeskusten velvoitteet)
Original title Datakeskusten velvoitteet
Energy Authority of Finland (Energiavirasto)
Guidance from the Energy Authority of Finland (Energiavirasto): data centres with at least 500 kW installed IT demand report by 15 May each year; those above 1 MW total power must use waste heat or show infeasibility.
On this page
Overview
The official guidance from the Energy Authority of Finland joins EU data-centre reporting with national waste-heat and cost-benefit duties. It explains that installed nominal IT capacity, not average operating demand, determines the reporting scope.
Centres with installed IT demand of at least 500 kW, subject to the stated exceptions, report for the preceding year by 15 May. Data centres above 1 MW total power must use waste heat or, where applicable, demonstrate technical or economic infeasibility using cost-benefit analysis.
Key points
- Installed nominal IT capacity, not average operating demand, sets the reporting scope.
- Centres with installed IT demand of 500 kW or more report for the preceding year by 15 May (subject to stated exceptions).
- Data centres above 1 MW total power must use waste heat.
- Where applicable, technical or economic infeasibility is shown through cost-benefit analysis.
- The guidance treats EU reporting together with Finland's waste-heat and cost-benefit obligations.
Using it in design
- For a Finnish facility, check the reporting threshold against installed nominal IT capacity (500 kW), not average load.
- For facilities above 1 MW total power, assess waste-heat use at the start of design and prepare a cost-benefit analysis if infeasible.
- Include the reporting calendar (15 May, previous-year data) in the operations and metering plan.
Who should read it
Teams designing or operating data centres in Finland and compliance managers tracking EU and national reporting duties.
Publication details
- Authors
- Energy Authority of Finland (Energiavirasto)
- Publisher
- Energy Authority of Finland (Energiavirasto)
- Year
- Year not stated
- Document language
- Finnish
- Source type
- Government / public
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
TinyFish reads were bot-blocked; web open returned the official substantive text, including thresholds and exceptions. Original summaries only.
Citation
Energy Authority of Finland (Energiavirasto) Datakeskusten velvoitteet. Energy Authority of Finland (Energiavirasto). https://energiavirasto.fi/datakeskukset
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.