Strategic Scan #5: Data Center Response and Preparedness
CPSE Center for Innovation
A CPSE survey of November 2026: of 122 US fire chiefs, 68% say data-centre growth will require significant changes to fire department planning, and 90.5% are concerned about lithium-ion fires and thermal runaway.
On this page
Overview
This strategic scan from the Center for Public Safety Excellence (CPSE) Center for Innovation describes, from fire chiefs' perspective, the challenges data centres create for fire departments and communities: complex electrical systems, battery energy storage hazards, specialised suppression systems and intensive utility demands. Data were gathered in July and August 2026 from chiefs of accredited agencies and holders of the Chief Fire Officer credential. Military and non-US agencies are excluded. The report does not claim to represent the whole fire service; it is a snapshot of perspectives.
The survey reached 543 people and drew 122 responses (22.5%). Service-area population ranges from 1,504 to 2.5 million, with a median of 50,000. 49.2% of respondents have no known data-centre projects, 23% have at least one operational data centre, 19.7% have one proposed or under review and 9.0% have one under construction. 19.1% reported a moratorium on data-centre development by their authority having jurisdiction, with a median length of 9 months.
Results describe the state of preparedness. Operator communication with the agency is split (49% yes), and of those, 29.2% said the operator promised reinvestment in fire or emergency services. The most common preparedness measures are pre-incident planning visits (34.8%), facility tours (27.8%), site-specific response plans (21.7%) and joint training (20%). The report names facility and campus scale, complex building layouts and difficulty de-energising equipment as the biggest operational challenges.
The report closes with five actionable takeaways: a jurisdiction-specific data-centre risk assessment, early engagement with operators and developers before incidents, specialised training and equipment, regulatory clarity and code advocacy, and cross-functional partnerships with planning, utilities and neighbouring jurisdictions. It summarises only seven survey questions; the rest sit in an online dashboard.
Key points
- 543 people received the survey and 122 responded (22.5%); data were collected in July and August 2026.
- 68% of respondents agree data-centre development will require significant changes to fire department planning and preparedness.
- 90.5% are concerned about lithium-ion battery fires and thermal runaway, and 89.6% about large-scale BESS.
- Hardest response factors: facility and campus scale, complex building layouts and difficulty de-energising equipment.
- 23% have an operational data centre in their area, 19.7% one proposed or under review and 9.0% one under construction; 49.2% have no known project.
- 19.1% of authorities imposed a data-centre moratorium; median length 9 months.
- Operator communication is 49% yes and 51% no; 29.2% of those in contact reported a reinvestment promise to fire services.
- Current preparedness: pre-incident planning visits 34.8%, facility tours 27.8%, site-specific response plans 21.7%, joint training 20%.
- Planned within 24 months: coordination with local agencies 45.7%, extra training 41.5%, engaging developers in planning 41.5%; 25.5% chose none.
Using it in design
- As a design team, meet the fire department early in permitting and construction; site access, fire protection system design and response protocols can still be shaped then.
- To ease the difficulty of de-energising equipment, include central emergency shutdown points, a clear labelled isolation plan and a one-line diagram for the fire service in the design.
- Treat the lithium-ion thermal runaway scenario, the chiefs' main concern, separately in the fire response plan for battery and BESS areas.
- On large campuses and complex layouts, prepare access routes, hydrant locations and floor plans as a pre-incident package for the fire department.
- Add pre-incident planning visits and joint training to the operations manual and commissioning programme.
Who should read it
Data-centre designers and operators, fire and emergency managers, and planning and permitting authorities.
Document contents
- Overview and Additional Data
- Presence of Data Centers
- Data Center Moratoriums
- Operator Communications
- Chiefs' Outlook on Data Center Challenges
- Emerging Hazards
- Current Preparedness
- Future Preparedness
- Actionable Takeaways
- Conclusion
Publication details
- Authors
- CPSE Center for Innovation
- Publisher
- CPSE Center for Innovation
- Year
- 2026
- Document number
- Strategic Scan #5
- Document language
- English
- Source type
- Industry body
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Publisher public source inspected. No document-specific commercial redistribution permission established; metadata and original short summaries only.
Citation
CPSE Center for Innovation (2026). Strategic Scan #5: Data Center Response and Preparedness. CPSE Center for Innovation. Strategic Scan #5. https://www.innovationcpse.org/wp-content/uploads/2026/11/CPSE-Center-for-Innovation-Strategic-Scan-5-Data-Centers_11.6.26.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.