Danfoss Impact No. 8: Data Centers, a New Lever of Flexibility, Integration and Security
Original title Danfoss Impact No. 8 - Data centers: A new lever of flexibility, integration, and security
Danfoss
Danfoss 44-page policy paper: digital controls and liquid cooling cut cooling energy by 10-20%, recovered heat could cover up to 10% of Europe's space heating, and flexible operation can cut grid costs by up to 5%.
On this page
Overview
Issue 8 of the Danfoss Impact series argues that data centres can become assets to the energy system rather than burdens. Drawing on several sources, it describes how efficiency, waste heat recovery and flexible operation can strengthen grid resilience and lower system costs. The main readers are policymakers and industry leaders, with relevance noted for operators. The text is an equipment manufacturer's view and, by its authors' statement, does not reflect the views of external reviewers.
The first chapter treats energy gridlock: data-centre electricity use outpaces existing supply in many regions, grid connection queues run up to a decade in some places, and supply shortages of chips and transformers extend lead times. Data centres use about 560 billion litres of water a year, potentially rising to 1,200 billion by 2030. The second chapter focuses on efficiency: sensors, AI-supported controls and variable speed drives can cut cooling energy by 10-20%, while direct-to-chip liquid cooling reduces cooling-related energy by more than 15% and substantially lowers water use.
The third chapter treats data centres as energy assets. Electricity used in a data centre ends up as heat, most of it wasted today; an estimate attributed to the IEA says recovered heat could cover up to 10% of Europe's space-heating demand by 2030. On flexibility, moving non-urgent computing out of peak hours can cut grid costs by up to 5% and emissions by up to 40%, and operating flexibly even 1% of the time would shorten connection queues markedly. Case studies of waste heat projects around the world are presented.
The last chapter gives policy recommendations: mandatory PUE, WUE and ERF reporting with minimum performance thresholds, promotion of closed-loop and direct-to-chip cooling, permitting linked to a sustainability rating, a requirement for new data centres to assess heat recovery potential in permitting, and market rules and tariffs that reward flexibility.
Key points
- Sensors, AI-supported controls and variable speed drives can cut cooling energy by 10-20% with short payback times.
- Efficient liquid cooling reduces cooling-related energy use by more than 15% and cuts water use substantially.
- IEA estimate: recovered data-centre heat could cover up to 10% of Europe's space-heating demand by 2030.
- Flexible data-centre operation can cut grid costs by up to 5% and emissions by up to 40%; flexibility 1% of the time would shorten connection queues markedly.
- Data centres use about 560 billion litres of water a year, potentially 1,200 billion by 2030.
- In some regions grid connection queues last up to a decade.
- According to the IEA, AI could deliver emission reductions equal to about 5% of global energy-related emissions in 2035.
- Recommendation: PUE, WUE and ERF reporting should be mandatory and minimum performance thresholds should be based on that data.
- Recommendation: new data centres should assess heat recovery potential in permitting; facilities should be heat-reuse-ready with standardised pre-piping, cabling and space for a heat pump.
- Case: a district heating company pays about EUR 190,000 per MW of heat supplied in return for data centres' heat pump investment.
Using it in design
- In new designs, write variable speed drives and sensor-based control for cooling pumps, fans and compressors into the base specification and include them in the payback analysis.
- For high-density racks, evaluate direct-to-chip liquid cooling and closed-loop architecture together with the water usage (WUE) target.
- To be heat-recovery-ready, add heat pump space and standard pre-piping and cabling routes to the initial design, and score proximity to district heating or industrial users in site selection.
- For flexible operation, define load curtailment and deferrable workload classes at contract and SLA level in advance.
- Put PUE, WUE and ERF measurement into the metering plan at design stage; regulatory reporting may rely on all three.
Who should read it
Policymakers, operators and designers planning data-centre energy system integration and cooling strategy.
Document contents
- Why data centers can be assets to our energy system
- Chapter 1: Breaking the energy gridlock
- Chapter 2: Sustaining growth through efficiency (digital solutions, direct-to-chip liquid cooling, variable speed drives)
- Chapter 3: Data centers as energy assets (strategic planning, waste heat, flexibility and grid resilience)
- Chapter 4: What's next for data centers
- Recommendations to turn data centers into assets
Related standards
- EU Energy Efficiency Directive (EU) 2023/1791
Publication details
- Authors
- Danfoss
- Publisher
- Danfoss
- Year
- 2026
- Document number
- BE555340332854en-000101
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Vendor publication on assets.danfoss.com; no open licence stated
Citation
Danfoss (2026). Danfoss Impact No. 8 - Data centers: A new lever of flexibility, integration, and security. Danfoss. BE555340332854en-000101. https://assets.danfoss.com/documents/latest/581249/BE555340332854en-000101.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.