Per the Danish Energy Agency, from 11 October 2025 data centres above 1 MW must prepare and submit for approval a surplus-heat cost-benefit analysis when built or substantially renovated.
On this page
Overview
The page describes two changes to surplus-heat regulation in Denmark. On 1 July 2025 the former surplus-heat price cap was abolished: there is no longer a fixed upper limit on costs district heating companies can charge consumers to use surplus heat, but the rule that consumer heat prices must not exceed necessary costs still applies. Companies supplying surplus heat to a district heating company remain outside the heat supply act's price regulation; heat whose temperature has been raised by heat pumps falls under it.
On 11 October 2025 the Danish Energy Agency implemented new EU requirements to ensure better use of surplus heat. Companies responsible for, or about to be responsible for, an industrial plant above 8 MW, a service facility above 7 MW or a data centre above 1 MW must prepare a cost-benefit analysis when they build or carry out major renovations. The analysis examines whether using surplus heat from these facilities, for example in district heating, is economically profitable.
The analysis is submitted digitally to the Agency, which approves it. Approval is needed before applying for approval of the surplus-heat project under the project order (collective heating plants) or the cooling order (district cooling). The requirement follows a new order on cost-benefit analyses. Monitoring reports on surplus-heat use for 2022 and 2023 are also published.
Key points
- The surplus-heat price cap was abolished on 1 July 2025; the rule that consumer heat prices must not exceed necessary costs remains.
- Companies supplying surplus heat are outside heat supply act price regulation; heat raised by heat pumps is covered.
- From 11 October 2025, data centres above 1 MW (and industrial plants above 8 MW, service facilities above 7 MW) prepare a cost-benefit analysis on build or major renovation.
- The analysis examines whether using surplus heat is economically profitable.
- The analysis is sent digitally to the Danish Energy Agency and approved; approval is needed before the surplus-heat project approval.
- The requirement rests on the order on cost-benefit analyses.
Using it in design
- When planning a data centre above 1 MW in Denmark, prepare a cost-benefit analysis of surplus-heat recovery early in design and submit it for Agency approval.
- Choose the heat recovery temperature level to suit the district heating network, and in contract structure account for heat raised by heat pumps being subject to price regulation.
- Write the cost-benefit analysis approval into the project schedule as a precursor to the surplus-heat project approval application.
- Add the need for the analysis in major renovations to the maintenance and expansion plan.
Who should read it
Investors and design teams building or renovating data centres in Denmark, and consultants drafting waste-heat agreements with district heating companies.
Document contents
- Regulation of surplus heat
- Monitoring of surplus heat use 2020-2023
- Cost-benefit analyses for industrial plants, service facilities and data centres
Publication details
- Authors
- Danish Energy Agency
- Publisher
- Danish Energy Agency
- Year
- Year not stated
- Document language
- Danish
- Source type
- Government / public
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Official public publisher text inspected. No document-specific commercial redistribution permission established; metadata and original short summaries only.
Citation
Danish Energy Agency Overskudsvarme og cost-benefit-analyser. Danish Energy Agency. https://ens.dk/forsyning-og-forbrug/overskudsvarme-og-cost-benefit-analyser
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.